References
- Engineering Risk and Hazard Assessment, A. KANDEL and E. AVNI, Eds., CRC Press, Boca Raton, Florida (1988).
- “The History of Nuclear Power Plant Safety—1970’s,” American Nuclear Society Public Information Web Site: http://users.owt.com/smsrpm/nksafe/seventies.html (current as of November 11, 2010).
- “INL Contributes to Three Mile Island Analysis,” Idaho National Laboratory Web Site: http://www.inl.gov/threemileisland/nuclearsafety.shtml.
- “Reactor Safety Study: An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants,” WASH-1400, NUREG-75/014, U.S. Nuclear Regulatory Commission (Oct. 1975).
- “Feasibility Study for a Risk-Informed and Performance-Based Regulatory Structure for Future Plant Licensing,” Vols. 1 and 2, NUREG-1860, U.S. Nuclear Regulatory Commission (Dec. 2007).
- Code of Federal Regulations, Title 10, “Energy,” Part 100, “Reactor Site Criteria,” U.S. Nuclear Regulatory Commission; http://www.nrc.gov/reading-rm/doc-collections/cfr/part100.
- Code of Federal Regulations, Title 10, “Energy,” Part 50, “Domestic Licensing of Production and Utilization Facilities,” Appendix K, “ECCS Evaluation Models,” U.S. Nuclear Regulatory Commission; http://www.nrc.gov/reading-rm/doc-collections/cfr/part050/.
- “Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants,” NUREG-1150, U.S. Nuclear Regulatory Commission (Mar. 1989).
- “Quantifying Reactor Safety Margins: Application of Code Scaling, Applicability, and Uncertainty Evaluation Methodology to a Large-Break, Loss-of-Coolant Accident,” NUREG/CR-5249, U.S. Nuclear Regulatory Commission (1988).