References
- Acuna M, Skinnell J, Evanson T, Mitchell R. 2011. Bunching with a self-levelling feller buncher on steep terrain for efficient yarder extraction. Croatian Journal of Forest Engineering 32: 521–531.
- Avery TE, Burkhart HE. 2002. Forest measurements (5th edn). New York: McGraw-Hill.
- Björheden R. 1998. Differentiated processing in motor manual and mechanized logging. International Journal of Forest Engineering 9: 49–59.
- Cao QV, Pepper WD. 1986. Predicting inside bark diameter for shortleaf, loblolly and longleaf pines. Southern Journal of Applied Forestry 10: 220–224.
- Cornelius DW. 1989. The largest man-made forest in Africa. South Viphya Forest Reserve. Mzimba: Viphya Plantations Division.
- Egan AF, Baumgras JE. 2003. Ground skidding and harvested stand attributes in Appalachian hardwood stands in West Virginia. Forest Products Journal 53: 59–63.
- Eggers J, McEwan A, Conraide B. 2010. Pinus saw timber tree optimisation in South Africa: a comparison of mechanical tree optimisation (harvester/processor) versus current manual methods. Southern Forests 72: 23–30.
- Erasmus D. 1994. National terrain classification systems for forestry. ICFR Bulletin Series 684/3/3. Pietermaritzburg: Institute for Commercial Forestry Research.
- Evanson T, McConchie M. 1996. Productivity measurements of two Waratah 234 hydraulic tree harvesters in radiata pine in New Zealand. International Journal of Forest Engineering 7: 41–52.
- Forestry Solutions. 2007. BOP Forestry: Harvesting. Available at http://www.forestrysolutions.net [accessed 26 April 2012].
- Government of Malawi. 2001. Malawi's national forestry programme: priorities for improving forestry and livelihoods. Lilongwe: Department of Forestry, NFP Co-ordination Unit.
- Han H, Renzie C. 2005. Effect of ground slope, stump diameter, and species on stump height for feller bunchers and chainsaw felling. International Journal of Forest Engineering 16: 81–88.
- Iarocci P. 2007. Mechanisation in South Africa. Official Publication of Tigercat Industries Inc. Between the Branches, 17 July 2007, Ontario.
- Kanawaty G. (ed.) 1997. Introduction to work study (4th [revised] edn). Johannesburg: Skotaville Publishers.
- LeDoux CB. 2010. Mechanised systems for harvesting eastern hardwoods. General Technical Report NRS-69. Broomall: US Department of Agriculture.
- Luhanga J. 2009. The timber trade in Malawi. Resource Insight no. 7. Johannesburg: Southern Africa Resource Watch.
- Nurminen T, Korpunen H, Uusitalo J. 2006. Time consumption analysis of the mechanised cut-to-length harvesting system. Silva Fennica 40: 335–363.
- Spinelli R, Visser RJM. 2009. Analysing and estimating delays in wood chipping operations. Biomass and Bioenergy 33: 429–433.
- Stampfer K. 1999. Influence of terrain conditions and thinning regimes on productivity of a track-based steep slope harvester. In: Sessions J, Chung W (eds), Proceedings of the International Mountain Logging and 10th Pacific Northwest Skyline Symposium, March 28–1 April 1999, Corvallis, Oregon. Corvallis: Forest Engineering Department, Oregon State University. pp 78–87.
- Stokes BJ, Hartsough BR. 1993. Development and analysis of SRIC harvesting systems. In: First Biomass Conference of the Americas Proceedings: Energy, environment, agriculture, and industry, 30 August–2 September 1993, Burlington, VT, vol. 1. Golden, Colorado: National Renewable Energy Laboratory. pp 302–308. Available at http://www.treesearch.fs.fed.us/pubs/7367 [accessed 14 June 2012].
- Thompson JD. 2003. Productivity of a tree length harvesting system thinning ponderosa pine in northern Arizona. In: Proceedings of the Council on Forest Engineering Conference: ‘Forest Operations Among Competing Forest Uses’, September 7–10 2003, Bar Harbor, Maine.
- Uronen P. 1980. Systems analysis in forest and forest industry: an overview. IIASA Working Paper WP-80-055. Laxenberg: International Institute for Applied Systems Analysis.
- VPD (Viphya Plantations Division). 2005. Annual report: 2004–2005. Mzimba: Viphya Plantations Division.
- Visser R, Stampfer K. 2003. Tree-length system evaluation of second thinning in a loblolly pine plantation. Southern Journal of Applied Forestry 27: 77–82.
- Wang J, LeDoux CB. 2003. Estimating and validating ground-based timber harvesting production through computer simulation. Forest Science 49: 64–76.
- Wang J, Long C, McNeel J, Baumgras J. 2004. Productivity and cost of manual felling and cable skidding in central Appalachian hardwood forests. Forest Products Journal 54: 45–51.