References
- Afshar , A. Kasaeian Ziaraty A. Kaveh , A. Sharifi , F. 2009 . Nondominated archiving multicolony ant algorithm in time-cost trade-off optimization , Journal of Construction Engineering and Management ASCE 135 7 : 668 – 674 . http://dx.doi.org/10.1061/(ASCE)0733-9364(2009)135:7(668)
- Colorni , A. Dorigo , M. Maniezzo , V. 1991 . Distributed optimization by ant colonies , in Proc. of the First European Conference on Artificial Life 11–13 December , 1991 , Paris , France , 134 – 142 .
- Dorigo , M. Di Caro , G. Gambardella , L. M. 1992 . Ant algorithms for discrete optimization , Artificial Life 5 2 : 137 – 172 . http://dx.doi.org/10.1162/106454699568728
- Dorigo , M. Stützle , T. 2004 . Ant Colony Optimization . Cambridge : MIT Press . 320 p. http://dx.doi.org/10.1007/b99492
- Elbeltagi , E. Hegazy , T. Grierson , D. 2005 . Comparison among five evolutionary-based optimization algorithms , Advanced Engineering Informatics 19 1 : 43 – 53 . http://dx.doi.org/10.1016/j.aei.2005.01.004
- Feng , C.-W. Liu , L. Burn , S. A. 1997 . Using genetic algorithms to solve construction time-cost trade-off problems , Journal of Computing in Civil Engineering ASCE 11 3 : 184 – 189 . http://dx.doi.org/10.1061/(ASCE)0887-3801(1997)11:3(184)
- Geem , Z. W. 2010 . Multiobjective optimization of time-cost trade-off using harmony search , Journal of Construction Engineering and Management ASCE 136 6 : 711 – 716 . http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000167
- Gen , M. Cheng , R. 2000 . Genetic Algorithms and Engineering Optimization . New York : Wiley-Interscience Publication . 512 p.
- Kapliński , O. Janusz , L. 2006 . Three phases of multifactor modelling of construction processes , Journal of Civil Engineering and Management 12 2 : 127 – 134 .
- Ke , H. Ma , W. Ni , Y. 2009 . Optimization models and a GAbased algorithm for stochastic time-cost trade-off problem , Applied Mathematics and Computation 215 1 : 308 – 313 . http://dx.doi.org/10.1016/j.amc.2009.05.004
- Li , H. Love , P. 1997 . Using improved genetic algorithms to facilitate time-cost optimization , Journal of Construction Engineering and Management ASCE 123 3 : 233 – 237 . http://dx.doi.org/10.1061/(ASCE)0733-9364(1997)123:3(233)
- Li , H. Wang , Z. 2009 . Memetic algorithm for solving construction time-cost optimization , in Proc. of the International Conference on Management and Service Science (MASS 2009) , 20–22 September , 2009 , Wuhan , , China , IEEE Press , 1 – 4 . http://dx.doi.org/10.1109/ICMSS.2009.5305099
- Liu , L. Burns , S. A. Feng , C.-W. 1995 . Construction time-cost trade-off analysis using LP/IP , Journal of Construction Engineering and Management ASCE 121 4 : 446 – 454 . http://dx.doi.org/10.1061/(ASCE)0733-9364(1995)121:4(446)
- Ng , S. T. , Deng , M. Z. M. , Skitmore , R. M. and Lam , K. C. 2000 . A conceptual case-based decision model for mitigating construction delays . International Journal of Construction Information Technology , 8 ( 2 ) : 1 – 20 .
- Ng , S. T. Zhang , Y. S. 2008 . Optimizing construction time and cost using ant colony optimization approach , Journal of Construction Engineering and Management ASCE 134 9 : 721 – 728 . http://dx.doi.org/10.1061/(ASCE)0733-9364(2008)134:9(721)
- Zavadskas , E. K. Turskis , Z. Tamošaitienė , J. 2010 . Risk assessment of construction projects , Journal of Civil Engineering and Management 16 1 : 33 – 46 . http://dx.doi.org/10.3846/jcem.2010.03
- Zhang , H. Li , H. 2010 . Multi-objective particle swarm optimization for construction time-cost tradeoff problems , Construction Management and Economics 28 1 : 75 – 88 . http://dx.doi.org/10.1080/01446190903406170
- Zhang , H. Xing , F. 2010 . Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradeoff in construction , Automation in Construction 19 8 : 1067 – 1075 . http://dx.doi.org/10.1016/j.autcon.2010.07.014
- Zhang , Y. S. Ng , S. T. Kumaraswamy , M. M. 2007 . Applying ant colony system to solve construction time-cost trade-off problem , in Proc. of the 25th Anniversary Conference “Construction Management and Economics” , 16–18 July , 2007 , University of Reading, Reading , United Kingdom . 7 p.
- Zheng , D. X. M. Ng , S. T. 2005 . Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front , Journal of Construction Engineering and Management ASCE 131 2 : 176 – 186 . http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:2(176)
- Zheng , D. X. M. Ng , S. T. Kumaraswamy , M. M. 2004 . Applying a genetic algorithm-based multiobjective approach for time-cost optimization , Journal of Construction Engineering and Management ASCE 130 2 : 168 – 176 . http://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:2(168)
- Zheng , D. X. M. Ng , S. T ; Kumaraswamy , M. M. 2005 . Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization , Journal of Construction Engineering and Management ASCE 131 1 : 81 – 91 . http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:1(81)