References
- Ahmed, F. M. S.; Miroslaw, J. S.; Ismail, B. 2007. BOT viability models for large scale infrastructure projects, Journal of Construction Engineering and Management ASCE 133(1): 50–63. http://dx.doi.org/10.1061/(ASCE)0733-9364(2007)133:1(50)
- Askar, M.; Gab-Allah, A. 2002. Problems facing parties involved in build, operate, and transfer projects in Egypt, Journal of Management in Engineering 18(4): 173–178. http://dx.doi.org/10.1061/(ASCE)0742-597X(2002)18:4(173)
- Baloi, D.; Price, A. D. F. 2003. Modeling global risk factors affecting construction cost performance, International Journal of Project Management 21(4): 261–269. http://dx.doi.org/10.1016/S0263-7863(02)00017-0
- Cheung, E.; Chan, A. P. C.; Kajewski, S. 2010.The public sector's perspective on procuring public works projects – comparing the views of practitioners in Hong Kong and Australia, Journal of Civil Engineering and Management 16(1): 19–32. http://dx.doi.org/10.3846/jcem.2010.02
- Dey, P. K.; Ogulana, S. O. 2004. Selection and application of risk management tools and techniques for build-operate transfer projects, Industrial Management and Data Systems 104(4): 334–346. http://dx.doi.org/10.1108/02635570410530748
- Dey, P. K.; Ogunlana, S. O.; Takehiko, N. 2002. Risk management in build-operate-transfer projects, International Journal of Risk Assessment and Management 3(2/3/4): 269–291.
- Delmon, J. 2000. BOO/BOT projects: a commercial and contractual guide. London: Sweet & Maxwell Limited, 1: 40–62.
- Dias, A. Jr.; Ioannou, G. Ph. 1995a. Debt capacity and optimal capital structure for privately financed infrastructure projects, Journal of Construction Engineering and Management, ASCE 12, 404–414. http://dx.doi.org/10.1061/(ASCE)0733-9364(1995)121:4(404)
- Dias, A. Jr.; Ioannou, G. Ph. 1995b. Desirability model for the development of privately promoted infrastructure projects, UMCEE Report No.95-09, Vol. 1, University of Michigan, USA.
- Ebrahimnejad, S.; Mousavi, S. M.; Seyrafianpour, H. 2010. Risk identification and assessment for build-operate-transfer projects: a fuzzy multi attribute decision making model, Expert Systems with Applications International Journal 37: 575–586. http://dx.doi.org/10.1016/j.eswa.2009.05.037
- Esq, L. F. 1996. Introduction to B.O.T., in Proc., Conf. on International Contracts of B.O.T. and Their Amicable Solutions, Vol. 1.
- Flanagan, R.; Norman, N. 1993. Risk management and construction. London: Blackwell Scientific Publications. 208 p.
- Ghosh, S.; Jintanapakanont, J. 2004. Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach, International Journal of Project Management 22(8): 632–642. http://dx.doi.org/10.1016/j.ijproman.2004.05.004
- Grimsey, D.; Lewis, K. K. 2004. Public–Private Partnerships. Cheltman, UK: Edward Elgar. http://dx.doi.org/10.4337/9781845423438
- Gunn, S. 2005. Consideration of pre-contract risks in international PFI projects. Risk Management Considerations in Construction Projects. The University of Salford, Manchester, Salford Centre for Research and Innovation (SCRI).
- Gupta, M. C.; Narasimham S. V. 1998. Discussion of CSFs in competitive tendering and negotiation model for BOT projects, Journal of Construction Engineering and Management, ASCE, Sept./Oct. 430 p.
- Huang, Y. L. 1995. Project and policy analysis of build operate-transfer infrastructure development: PhD thesis, UMI Company, Michigan, 15–23.
- Kim, G. 2010. Risk performance indexes and measurement systems for mega construction projects, Journal of Civil Engineering and Management 1(4): 586–594. http://dx.doi.org/10.3846/jcem.2010.65
- Klein, M.; So, J.; Shin, B. 1996. Transaction costs in private infrastructure projects – are they too high? Public Policy of Private Sector, The World Bank, Washington, DC.
- Kumaraswamy, M. M.; Morris, D. A. 2002. Build-operate transfer-type procurement in Asian mega projects, Journal of Construction Engineering and Management 128(2): 93–102. http://dx.doi.org/10.1061/(ASCE)0733-9364(2002)128:2(93)
- Levy, S. M. 1996. Build, operate, transfer paving the way for tomorrow's infrastructure. TorontoFrank Mercede and Sons, Inc., Stamford, CT. 411 p.
- Li, B.; Akintoye, A.; Edwards, P. J.; Hardcastle, C. 2005. The allocation of risk in PPP/PFI construction projects in the UK, International Journal of Project Management 23(1): 25–35. http://dx.doi.org/10.1016/j.ijproman.2004.04.006
- Liddle, B. T. 1997. Privatization decision and civil engineering projects, Journal of Management in Engineering 13(3): 73–78. http://dx.doi.org/10.1061/(ASCE)0742-597X(1997)13:3(73)
- Loosemore, M. 2007. Risk allocation in the private provision of public infrastructure, International Journal of Project Management 25(1): 66–76. http://dx.doi.org/10.1016/j.ijproman.2006.06.005
- Loosemore, M.; Raftery, J.; Reilly, C.; Higgon, D. 2006. Risk management in projects. London: Taylor & Francis. 260 p.
- Miller, G. A. 1956. The magical number seven, plus or minus two: some limits on our capacity for processing information, Psychological Review 63(2): 81–97. http://dx.doi.org/10.1037/h0043158
- Nassar, G. 1996. What is B.O.T. in Proc., Conf. on International Contracts of B.O.T. and Their Amicable Solutions, Vol. 1.
- National Council for Public-Private Partnerships, USA 2009. How PPPs work-Public–private partnerships defined [on- line], [cited 26 August 2009]. Available from Internet: http://www.ncppp.org/howpart/index.shtml
- Ozdoganm, I. D.; Birgonul, M. T. 2000. A decision support framework for project sponsors in the planning stage of build-operate-transfer (BOT) projects, Journal of Construction Management and Economics 18(3): 343–353. http://dx.doi.org/10.1080/014461900370708
- Ranasinghe, M. 1999. Private sector participation in infrastructure projects: a methodology to analyze viability of BOT, Journal of Construction Management and Economics 17(5): 613–623. http://dx.doi.org/10.1080/014461999371222
- Raz, T.; Michael, E. 2001. Use and benefits of tools for project risk management,International Journal of Project Management 19(1): 9–17. http://dx.doi.org/10.1016/S0263-7863(99)00036-8
- Regan, M.; Smith, J.; Love, P. 2009. Public–private partnerships: what does the future hold, in Proc., RICS Construction and Building Research Conf. (COBRA), Royal Institution of Chartered Surveyors, London, 462–474.
- Saaty, T. L. 1980. The analytical hierarchy process. USA: McGraw-Hill, Inc. 287 p.
- Senturk, H. A.; Yazici, G.; Kaplanoglu, S. B. 2004. Case study: Izmit domestic and industrial water supply build-operate transfer project, Journal of Construction Engineering and Management 130(3): 449–454. http://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:3(449)
- Shen, L. Y.; Bao, H. J.; Wu, Y. Z.; Lu, W. S. 2007. Using bargaining-game theory for negotiating concession period for BOT-type project, Journal of Construction Engineering and Management, ASCE 133(5): 385–392. http://dx.doi.org/10.1061/(ASCE)0733-9364(2007)133:5(385)
- Shen, L. Y.; Lee, K. H.; Zhang, Z. 1996. Application of BOT system for infrastructure projects in China, Journal of Construction Engineering and Management 122(4): 319–323. http://dx.doi.org/10.1061/(ASCE)0733-9364(1996)122:4(319)
- Shen, L. Y.; Li, H.; Li, Q. M. 2002. Alternative concession model for build operate transfer contract project, Journal of Construction Engineering and Management, ASCE 128(4): 326–330. http://dx.doi.org/10.1061/(ASCE)0733-9364(2002)128:4(326)
- Shen, L. Y.; Wu, Y. Z. 2005. Risk concession model for build operate transfer contract projects, Journal of Construction Engineering and Management, ASCE 131(2): 211–220. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:2(211)
- Songer, A. D.; Diekmann, J.; Pecsok, R. S. 1997. Risk analysis for revenue dependent infrastructure projects, Construction Management and Economics 15(4): 377–382. http://dx.doi.org/10.1080/014461997372935
- Tiong, R. L. K. 1990. Comparative study of BOT projects, Journal of Management in Engineering, ASCE, January, 6: 107–122.
- Tiong, R. L. K. 1995a. Risks and guarantees in BOT tender, Journal of Construction Engineering and Management, ASCE, June, 183–188. http://dx.doi.org/10.1061/(ASCE)0733-9364(1995)121:2(183)
- Tiong, R. L. K. 1995b. Competitive advantage of equity of BOT tender, Journal of Construction Engineering and Management, ASCE, Sept., 282–289. http://dx.doi.org/10.1061/(ASCE)0733-9364(1995)121:3(282)
- Tiong, R. L. K. 1995c. Impact of financial package versus technical solution in BOT tenders, Journal of Construction Engineering and Management, ASCE, Sept, 304–311. http://dx.doi.org/10.1061/(ASCE)0733-9364(1995)121:3(304)
- Tiong, R. L. K. 1996. CSFs in competitive tendering and negotiation model for BOT projects, Journal of Construction Engineering and Management, ASCE, Sept, 202–211.
- Tiong, R. L. K.; Alum, J. 1997. Final negotiation in competitive BOT tender, Journal of Construction Engineering and Management, ASCE 6–10. http://dx.doi.org/10.1061/(ASCE)0733-9364(1997)123:1(6)
- Tiong, R. L. K.; Yeo, K. M.; McCarthy, S. C. 1992. Critical success factors in winning BOT contracts, Journal of Construction Engineering and Management, ASCE, June, 217–228. http://dx.doi.org/10.1061/(ASCE)0733-9364(1992)118:2(217)
- United Nations Industrial Development Organisation UNIDO 1996. Guidelines for Infrastructure Development through Build-Operate-Transfer (BOT) Projects, Vienna.
- Walker, C.; Smith, A. 1995. Privatized infrastructure the build operate transfer approach. London: Thomas Telford Services Ltd. http://dx.doi.org/10.1680/pitba.20535
- Wilburn, W. K.; Thomas, J. R. 1994. Build-operate-transfer. An emerging trend in project financing, Construction Business View, May/June.
- World Bank. 1994. World development report: infrastructure for development. Rep. No. 13184, Washington, D.C.
- Zayed, T. M.; Chang, L. M. 2002. Prototype model for build-operate-transfer risk assessment, Journal of Management Engineering 18(1): 7–16. http://dx.doi.org/10.1061/(ASCE)0742-597X(2002)18:1(7)
- Zavadskas, E. K; Turskis, Z.; Tamošaitienė, J. 2010. Risk assessment of construction projects, Journal of Civil Engineering and Management 16(1): 33–46. http://dx.doi.org/10.3846/jcem.2010.03