References
- Al-Hammad, A. 2000. Common interface problems among various construction parties, Journal of Performance of Constructed Facilities14(2): 71–74. http://dx.doi.org/10.1061/(ASCE)0887-3828(2000)14:2(71)
- Azhar, S. 2011. Building Information Modeling (BIM): trends, benefits, risks, and challenges for the AEC industry, Leadership and Management in Engineering11(3): 241–252. http://dx.doi.org/10.1061/(ASCE)LM.1943-5630.0000127
- Azimi, R.; Lee, S. H.; AbouRizk, S. M.; Alvanchi, A. 2011. A framework for an automated and integrated project monitoring and control system for steel fabrication projects, Automation in Construction20(1): 88–97. http://dx.doi.org/10.1016/j.autcon.2010.07.001
- Barlish, K.; Sullivan, K. 2012. How to measure the benefits of BIM-A case study approach, Automation in Construction24: 605–613. http://dx.doi.org/10.1016/j.autcon.2012.02.008
- Becerik-Gerber, B.; Kensek, K. 2010. Building information modeling in architecture, engineering, and construction: emerging research directions and trends, Journal of Professional Issues in Engineering Education and Practice136(3): 139–147. http://dx.doi.org/10.1061/(ASCE)EI.1943-5541.0000023
- Becerik-Gerber, B.; Rice, S. 2010. The perceived value of building information modeling in the US building industry, ITCON15: 185–201 [online], [cited 20 May 2011]. Available from Internet: http://www.itcon.org
- Chan, W. T.; Chen, C.; Messner, J. I.; Chua, D. K. H. 2005. Interface management for China's build-operate-transfer projects, Journal of Construction Engineering and Management131(6): 645–655. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:6(645)
- Chau, K.; Anson, M.; Zhang, J. 2004. Four-dimensional visualization of construction scheduling and site utilization, Journal of Construction Engineering and Management130(4): 598–606. http://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:4(598)
- Chen, Q.; Reichard, G.; Beliveau, Y. 2008. Multiperspective approach to exploring comprehensive cause factors for interface issues, Journal of Construction Engineering and Management134(6): 432–441. http://dx.doi.org/10.1061/(ASCE)0733-9364(2008)134:6(432)
- Chen, Q.; Reichard, G.; Beliveau, Y. 2010. Object model framework for interface modeling and IT-oriented interface management, Journal of Construction Engineering and Management136(2): 187–198. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000120
- Chen, Q; Reichard, G.; Beliveau, Y. 2007. Interface management – a facilitator of lean construction and agile project management, in Proc. of the Fifteenth Annual Conference of the International Group for Lean Construction (IGLC-15), 21–25 July 2007, Michigan, 57–66.
- Chua, D. K. H.; Godinot, M. 2006. Use of a WBS matrix to improve interface management in projects, Journal of Construction Engineering and Management132(1): 67–79. http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:1(67)
- Clough, R. H.; Sears, G. A.; Sears, S. K. 2000. Construction project management. 4th ed. New York: Wiley. 360 p.
- CRC for Construction Innovation 2010. Adopting BIM for facilities management: solutions for managing the Sydney opera house [online], [cited 28 March 2010]. Available from Internet: http://eprints.qut.edu.au/27582/1/27582.pdf20078
- Design Web Format Wikipedia [online], [accessed 1 March 2012]. Available from Internet: http://en.wikipedia.org/wiki/Design_Web_Format
- Ding, L. Y.; Zhou, Y.; Luo, H. B. Wu, X. G. 2012. Using nD technology to develop an integrated construction management system for city rail transit construction, Automation in Construction21(7): 64–73. http://dx.doi.org/10.1016/j.autcon.2011.05.013
- Dossick, C. S.; Neff, G. 2010. Organizational divisions in BIMenabled commercial construction, Journal of Construction Engineering and Management136(4): 459–467. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000109
- Eastman, C.; Teicholz, P.; Sacks, R.; Liston, K. 2008. BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. Hoboken, NJ: Wiley. 640 p. http://dx.doi.org/10.1002/9780470261309
- Eddy, K.; Bradley, N. 2008. Green BIM: successful sustainable design with building information modeling. Hoboken, NJ: Wiley. 241 p.
- Elbeltagi, E.; Dawood, M. 2011. Integrated visualized time control system for repetitive construction projects, Automation in Construction20(7): 940–953. http://dx.doi.org/10.1016/j.autcon.2011.03.012
- Evans, G. N., et al. 1997. Organizing for improved construction interfaces, Innovation in Civil and Construction Engineering49: 207–212. http://dx.doi.org/10.4203/ccp.49.6.5
- Fox, S.; Hietanen, J. 2007. Interorganizational use of building information models: potential for automational informational and transformational effects, Construction Management and Economics25(3): 289–296. http://dx.doi.org/10.1080/01446190600892995
- Fu, C.; Aouad, G.; Lee, A.; Ponting, A.; Wu, S. 2006. IFC model viewer to support nD model application, Automation in Construction15(2): 178–185. http://dx.doi.org/10.1016/j.autcon.2005.04.002
- Goedert, J. D.; Meadati, A. G. F. 2008. Integrating construction process documentation into building information modeling, Journal of Construction Engineering and Management134(7): 509–516. http://dx.doi.org/10.1061/(ASCE)0733-9364(2008)134:7(509)
- Golparvar-Fard, M.; Peña-Mora, F.; Arboleda, C. A.; Lee, S. H. 2009. Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs, Journal of Computing in Civil Engineering11: 391–404. http://dx.doi.org/10.1061/(ASCE)0887-3801(2009)23:6(391)
- Gould, F.; Joyce, N. E. 2008. Construction project management. 3rd ed. Prentice Hall. 357 p.
- Hajdasz, M. 2008. Visualizing simulated monolithic construction processes, Journal of Civil Engineering and Management14(4): 295–306. http://dx.doi.org/10.3846/1392-3730.2008.14.29
- Hardin, B. 2009. BIM and construction management: proventools, methods, and workflows. New Jersey: John Wiley & Sons. 364 p.
- Hartmann, T.; Meerveld, H. V.; Vossebeld, N.; Adriaanse, A. 2012. Aligning building information model tools and construction management methods, Automation in Construction22: 605–613. http://dx.doi.org/10.1016/j.autcon.2011.12.011
- Healy, P. 1997. Interfaces project management: getting the job done on time and in budget. Butterworth-Heinemann, Port Melbourne, Vic. 299 p.
- Isikdag, U.; Underwood, J. 2010. Two design patterns for facilitating building information model-based synchronous collaboration, Automation in Construction19(5): 544–553. http://dx.doi.org/10.1016/j.autcon.2009.11.006
- Jardim-Goncalves, R.; Grilo, A. 2010. SOA4BIM: putting the building and construction industry in the Single European Information Space, Automation in Construction19(4): 388–397. http://dx.doi.org/10.1016/j.autcon.2009.11.009
- Jeong, Y. S.; Eastman, C. M.; Kaner, R. S. 2009. Benchmark test for BIM data exchanges of precast concrete, Automation in Construction18(4): 469–484. http://dx.doi.org/10.1016/j.autcon.2008.11.001
- Jung, Y.; Joo, M. 2011. Building information modelling (BIM) framework for practical implementation, Automation in Construction20(2): 126–133. http://dx.doi.org/10.1016/j.autcon.2010.09.010
- Kaner, I.; Sacks, R.; Kassian, W.; Quitt, T. 2008. Case studies of BIM adoption for precast concrete design by midsized structural engineering firms, ITCON13: 303–323 [online], [cited 21 June 2011]. Available from Internet: http://www.itcon.org
- Klein, L.; Li, N.; Becerik-Gerber, B. 2012. Imaged-based verification of as-built documentation of operational buildings, Automation in Construction21(1): 161–171.
- Laan, J.; Wildenburg, L.; Kleunen, P. 2000. Dynamic interface management in transport infrastructure project, in Proc. of2ndEuropean Systems Engineering Conference, September 2000, Munich, Germany, .
- Lee, G.; Park, H. K.; Won, J. 2012a. D3 city project – economic impact of BIM-assisted design validation, Automation in Construction22: 577–586. http://dx.doi.org/10.1016/j.autcon.2011.12.003
- Lee, S. I.; Bae, J. S.; Cho, Y. S. 2012b. Efficiency analysis of set-based design with structural building information modeling (S-BIM) on high-rise building structures, Automation in Construction23: 20–32. http://dx.doi.org/10.1016/j.autcon.2011.12.008
- Lee, J. K.; Lee, J.; Jeong, Y.-S.; Sheward, H.; Sanguinetti, P.; Abdelmohsen, S.; Eastman, C. M. 2012c. Development of space database for automated building design review systems, Automation in Construction24: 203–212. http://dx.doi.org/10.1016/j.autcon.2012.03.002
- Leite, F.; Akcamete, A.; Akinci, B.; Atasoy, G.; Kiziltas, S. 2011. Analysis of modeling effort and impact of different levels of detail in building information models, Automation in Construction20(5): 601–609. http://dx.doi.org/10.1016/j.autcon.2010.11.027
- Li, G.; Ding, L.; Wang, J. 2006. Construction project control in virtual reality: a case study, Journal of Applied Science3(13): 2724–2732.
- Lin, Y.-C. 2009. Developing construction network-based interface management system, in Proc. of the 2009Construction Research Congress, 4–7 April 2009, Seattle Marriott Waterfront, USA, Seattle, 477–486.
- Liston, K. M.; Fischer, M.; Kunz, J. 1998. 4D annotator: a visual decision support tool for construction planners, Journal of Computing in Civil Engineering, 330–341.
- Ma, Z. Y.; Shen, Q. P.; Zhang, J. P. 2005. Application of 4D for dynamic site layout and management of construction projects, Automation in Construction14(3): 369–381. http://dx.doi.org/10.1016/j.autcon.2004.08.011
- Manning, R.; Messner, J. 2008. Case studies in BIM implementation for programming of healthcare facilities, ITCON13: 446–457 [online], [cited 27 March 2011]. Available from Internet: http://www.itcon.org
- Matta, C.; Kam, C. 2010. The GSA'sBIM Pilot Program [online]. Presentation by GSA PBS Office of the Chief Architect [cited 21 March 2010]. Available from Internet: http://bim.arch.gatech.edu/data/reference/gsaBIM.pdf
- Morris, M. D. 1983. Managing project interfaces-key points for project success, in Project management handbook. New York: Van Nostrand Reinhold, 407–446.
- Moum, A. 2010. Design team stories exploring interdisciplinary use of 3D object models in practice, Automation in Construction19(5): 554–569. http://dx.doi.org/10.1016/j.autcon.2009.11.007
- NBIMS. 2007. National building information modeling standard Part-1: Overview, Principles and Methodologies, US National Institute of Building Sciences Facilities Information Council, BIM Committee [online], [cited 19 Sep 2011]. Available from Internet: http://www.wbdg.org/pdfs/NBIMSv1_p1.pdf
- Pavitt, T. C.; Gibb, A. G. F. 2003. Interface management within construction: in particular, building façade, Journal of Construction Engineering and Management129(1): 8–15. http://dx.doi.org/10.1061/(ASCE)0733-9364(2003)129:1(8)
- Redmond, A.; Hore, A.; Alshawi, M.; West, R. 2012. Exploring how information exchanges can be enhanced through cloud BIM, Automation in Construction24: 175–183. http://dx.doi.org/10.1016/j.autcon.2012.02.003
- Ren, Y.; Skibniewski, M. J.; Jiang, S. 2012. Building information modeling integrated with electronic commerce material procurement and supplier performance management system, Journal of Civil Engineering and Management18(5): 642–654. http://dx.doi.org/10.3846/13923730.2012.719835
- Sacks, R.; Barak, R. 2010. Teaching building information modeling as an integral part of freshman year civil engineering education, Journal of Professional Issues in Engineering Education and Practice136(1): 30–38. http://dx.doi.org/10.1061/(ASCE)EI.1943-5541.0000003
- Sacks, R.; Kaner, I.; Eastman, C. M.; Jeong, Y. S. 2010. The rosewood experiment-building information modeling and interoperability for architecture precast facades, Automation in Construction19(4): 419–432. http://dx.doi.org/10.1016/j.autcon.2009.11.012
- Schlueter, A.; Thesseling, F. 2009. Building information model based energy/exergy performance assessment in early design stages, Automation in Construction18(2): 153–163. http://dx.doi.org/10.1016/j.autcon.2008.07.003
- Senthilkumar, V.; Varghese, K.; Chandran, A. 2010. A webbased system for design interface management of construction projects, Automation in Construction19(2): 197–212. http://dx.doi.org/10.1016/j.autcon.2009.10.007
- Shen, W.; Shen, Q.; Sun, Q. 2012. Building information modeling-based user activity simulation and evaluation method for improving designer-user communications, Automation in Construction21: 148–160. http://dx.doi.org/10.1016/j.autcon.2011.05.022
- Shen, Z.; Issa, R. 2010. Quantitative evaluation of the BIM assisted construction detailed cost estimates, ITCON15: 234–257 [online], [cited 22 May 2011]. Available from Internet: http://www.itcon.org
- Shokri, S.; Safa, M.; Haas, C. T.; Haas; R. C. G.; Maloney, K.; MacGillivray, S. 2012. Interface management model for mega capital projects, in Proc. of the 2012 Construction Research Congress, 21–23 May 2012, Purdue University, United States, Indiana, 447–456. http://dx.doi.org/10.1061/9780784412329.045
- Siao, F. C.; Lin, Y. C. 2012. Enhancing construction interface management using multilevel interface matrix, Journal of Civil Engineering and Management18(1): 133–144. http://dx.doi.org/10.3846/13923730.2012.657368
- Siao, F. C.; Shu, Y. C.; Lin, Y. C. 2009. Interface management practice in Taiwan construction project, in Proc. of the 28th International Symposium on Automation and Robotics in Construction, 2011, 29 June – 2 July 2011, Korea, Seoul, 947–952.
- Staub-French, S.; Khanzode, A. 2007. 3D and 4D modeling for design and construction coordination: issues and lessons learned, ITCON12: 381–407 [online], [cited 5 June 2011]. Available from Internet: http://www.itcon.org
- Stuckenbruck, L. C. 1983. Integration: the essential function of project management, in Cleland, D. I.; King, W. R. (Eds.). Project management handbook. New York: Van Nostrand Reinhold, 207–232.
- Succar, B. 2009. Building information modelling framework: a research and delivery foundation for industry stakeholders, Automation in Construction18(3): 357–375. http://dx.doi.org/10.1016/j.autcon.2008.10.003
- Tse, T. K.; Wong, K. A.; Wong, K. F. 2005. The utilisation of building information models in nD modelling: a study of data interfacing and adoption barriers, ITCON10: 85–110 [online], [cited 16 May 2011]. Available from Internet: http://www.itcon.org
- Underwood, J.; Isikdag, U. 2010. Handbook of research on building information modeling and construction informatics: concepts and technologies. IGI Global. 567 p.
- Vainiunas, P.; Popovas, V.; Jarmolajev, A. 2011. Non-linear 3D modelling of RC slab punching shear failure, Journal of Civil Engineering and Management10(4): 311–316. http://dx.doi.org/10.1080/13923730.2004.9636324
- Vanlande, R.; Nicolle, C.; Cruz, C. 2008. IFC and building lifecycle management, Automation in Construction134(7): 70–78. http://dx.doi.org/10.1016/j.autcon.2008.05.001
- Whyte, J.; Bouchlaghem, N.; Thorpe, A. 2002. IT implementation in the construction organization, Engineering, Construction and Architectural Management9(5–6): 371–377. http://dx.doi.org/10.1108/eb021231
- Whyte, J.; Bouchlaghem, N.; Thorpe, A.; McCaffer, R. 1999. A survey of CAD and virtual reality within the house building industry, Engineering, Construction and Architectural Management6(4): 371–379. http://dx.doi.org/10.1108/eb021125
- Xudong, Z.; Jie, T. 2007. Building information modeling based on intelligent parametric technology, Frontiers of Architecture and Civil Engineering in China1(3): 367–370. http://dx.doi.org/10.1007/s11709-007-0049-4
- Zhang, J. P.; Hu, Z. Z. 2011. BIMand 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies original research article, Automation in Construction20(2): 155–166. http://dx.doi.org/10.1016/j.autcon.2010.09.013
- Zhou, W.; Whyte, J.; Sacks, R. 2012. Construction safety and digital design: a review, Automation in Construction22: 102–111. http://dx.doi.org/10.1016/j.autcon.2011.07.005