References
- Alessandri, T.; Ford, D.; Lander, D.; Leggio, K.; Taylor, M. 2004. Managing risk and uncertainty in complex capital projects, The Quarterly review of economics and finance 44(5): 751–767. http://dx.doi.org/10.1016/j.qref.2004.05.010
- Barber, P.; Sheath, D.; Tomkins, C.; Graves, A. 2000. The cost of quality failures in major civil engineering projects, International Journal of Quality and Reliability Management 17(4/5): 479–492. http://dx.doi.org/10.1108/02656710010298544
- Burati, J. L.; Farrington, J. J.; Ledbetter, W. B. 1992. Causes of quality deviations in design and construction, Journal of Construction Engineering and Management 118(1): 34–49. http://dx.doi.org/10.1061/(ASCE)0733-9364(1992)118:1(34)
- Cooper, K. G. 1980. Naval shipyard production: a claim settled and a framework built, Interfaces 10(6): 30–36. http://dx.doi.org/10.1287/inte.10.6.20
- Cooper, K. G. 1993. The rework cycle: benchmarking for the project manager, Project Management Journal 24(1): 17–22.
- Dissanayake, G. M.; Fayek, A. R.; Campero, O.; Wolf, H. 2003. Measuring and classifying construction field rework: a pilot study, in Proceedings CSCE Annual Conference, 5th Construction Specialty Conference, 4–7 June, 2003, Moncton, Canada, 1–7.
- Fayek, A. R. 2004. Developing a standard methodology for measuring and classifying construction field rework, Canadian Journal of Civil Engineering 31(6): 1077–1089. http://dx.doi.org/10.1139/l04-068
- Flyvbjerg, B. 2006. Five misunderstandings about case-study research, Qualitative Inquiry 12(2): 219–245. http://dx.doi.org/10.1177/1077800405284363
- Hwang, B.; Thomas, S. R.; Haas, C. T.; Caldas, C. H. 2009. Measuring the impact of rework on construction cost performance, Journal of Construction Engineering and Management 135(3): 187–198. http://dx.doi.org/10.1061/(ASCE)0733-9364(2009)135:3(187)
- Jefatura de Estado 2007. Ley 30/2007 de Contratos del Sector Público, Madrid. 101 p.
- Kvale, S. 1996. Interviews: an introduction to qualitative research interviewing. Thousand Oaks: Sage. 326 p.
- Love, P. E. D.; Mandal, H. L. 1999. Determining the causal structure of rework influences in construction, Construction Management and Economics 17(4): 505–517. http://dx.doi.org/10.1080/014461999371420
- Love, P. E. D. 2002. Influence of project type and procurement method on rework costs in building construction projects, Journal of Construction Engineering and Management 128(1): 18–29. http://dx.doi.org/10.1061/(ASCE)0733-9364(2002)128:1(18)
- Love, P. E. D.; Edwards, D. J. 2004. Forensic project management: the underlying causes of rework in construction projects, Civil Engineering and Environmental Systems 21(3): 207–228. http://dx.doi.org/10.1080/10286600412331295955
- Love, P. E. D.; Edwards, D. J.; Irani, Z. 2008. Forensic project management: an exploratory examination of the causal behavior of design-induced error, IEEE Transactions in Engineering Management 55(2): 234–248. http://dx.doi.org/10.1109/TEM.2008.919677
- Love, P. E. D.; Davis, P. R.; Ellis, J. M.; Cheung, S. O. 2010a. A systemic view of dispute causation, International Journal of Managing Projects in Business 3(4): 661–680. http://dx.doi.org/10.1108/17538371011076109
- Love, P. E. D.; Edwards, D.; Watson, H.; Davis, P. 2010b. Rework in civil infrastructure projects: determination of cost predictors, Journal of Construction Engineering and Management 136(3): 275–282. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000136
- Love, P. E. D.; Davis, P. R.; Cheung, S. O.; Irani, Z. 2011. Causal discovery and inference of project disputes, IEEE Transactions on Engineering Management 58(3): 400–411. http://dx.doi.org/10.1109/TEM.2010.2048907
- Love, P. E. D.; Edwards, D. J.; Irani, Z.; Goh, Y. M. 2011. Dynamics of rework in complex offshore hydrocarbon projects, Journal of Construction Engineering and Management 137(12): 1060–1070. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000377
- Love, P. E. D.; Edwards, D. J.; Irani, Z. 2012a. Moving beyond optimism bias and strategic misrepresentation: an explanation for social infrastructure project cost overruns, IEEE Transactions on Engineering Management 59(3): 560–571. http://dx.doi.org/10.1109/TEM.2011.2163628
- Love, P. E. D.; Wang, X.; Sing, C-P.; Tiong, R. 2012b. Probability of project cost overruns in Australian construction and engineering projects, Journal of Construction Engineering and Management (in Press).
- Lyneis, J. M.; Cooper, K. G.; Els, S. 2001. Strategic management of complex projects: a case study using system dynamics, System Dynamics Review 17(3): 237–260. http://dx.doi.org/10.1002/sdr.213
- Montes, G. M. 2007. Work risk-prevention procedures in highway management and maintenance contracts, Human Factors and Ergonomics in Manufacturing & Service Industries 17(3): 229–244. http://dx.doi.org/10.1002/hfm.20061
- Morse, J.; Richards, L. 2002. Readme first for a user's guide to qualitative methods. London: Sage Publications. 262 p.
- Ministerio de Fomento. 2011. Anuario Estadístico. Madrid: Dirección General de Carreteras del Ministerio de Fomento. 472 p.
- Palaneeswaran, E.; Love, P. E. D.; Kumaraswamy, M. M.; Ng, T. S. T. 2008. Mapping rework causes and effects using artificial neural networks, Building Research and Information 36(5): 450–465. http://dx.doi.org/10.1080/09613210802128269
- Ragin, C. C. 1994. Constructing social research: the unity and diversity of method. Thousand Oaks, Calif: Pine Forge Press. 194 p.
- Rodrigues, A.; Bowers, J. 1996. The role of system dynamics in project management, International Journal of Project Management 14(4): 213–220. http://dx.doi.org/10.1016/0263-7863(95)00075-5
- Rogge, D. F.; Cogliser, C.; Alaman, H.; McCormack, S. 2001. An investigation of field rework in industrial construction. Construction Industry Institute, University of Texas at Austin, Austin, Texas.
- Silverman, D. 2001. Interpreting qualitative data. London: Sage. 325 p.
- Williams, T.; Eden, C.; Ackermann, F.; Tait, A. 1995. Vicious circles of parallelism, International Journal of Project Management 13(3): 151–155. http://dx.doi.org/10.1016/0263-7863(95)00034-N
- Williamson, O. 1979. Transaction cost economics: the governance of contractual relations, The Journal of Law and Economics 22(2): 233–261. http://dx.doi.org/10.1086/466942
- Wolstenholme, E. 1990. System enquiry: a system dynamics approach. New York: John Wiley & Sons, Inc. 238 p.
- Yin, R. K. 1984. Case study research: design and methods. Newbury Park: Sage Publications. 160 p.
- Zhang, D.; Haas, C.; Goodrum, P.; Caldas, C.; Granger, R. 2012. Construction small-projects rework reduction for capital facilities, Journal of Construction Engineering and Management 138(12): 1377–1385. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000552
- Znaniecki, F. 1934. The method of sociology. New York: Farrar and Rinehart. 338 p.