References
- Abdallah, H.; Emara, H. M.; Dorrah, H. T.; Bahgat, A. 2009. Using Ant Colony Optimization algorithm for solving project management problems, Expert Systems with Applications 36(6): 10004–10015. http://dx.doi.org/10.1016/j.eswa.2008.12.064 doi: 10.1016/j.eswa.2008.12.064
- Blum, C. 2005. Ant colony optimization: introduction and recent trends, Physics of Life Reviews 2(4): 353–373. http://dx.doi.org/10.1016/j.plrev.2005.10.001 doi: 10.1016/j.plrev.2005.10.001
- Blum, C.; Dorigo, M. 2004. The hyper-cube framework for ant colony optimization, IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics 34(2): 1161–1172. http://dx.doi.org/10.1109/TSMCB.2003.821450 doi: 10.1109/TSMCB.2003.821450
- Bonabeau, E.; Dorigo, M.; Theraulaz, G. 2000. Inspiration for optimization from social insect behavior, Nature 406(6791): 39–42. http://dx.doi.org/10.1038/35017500 doi: 10.1038/35017500
- Bożejko, W.; Hejducki, Z.; Wodecki, M. 2012. Applying metaheuristic strategies in construction projects management, Journal of Civil Engineering and Management 18(5): 621–630. http://dx.doi.org/10.3846/13923730.2012.719837 doi: 10.3846/13923730.2012.719837
- Christodoulou, S. 2009. Construction imitating ants: resourceunconstrained scheduling with artificial ants, Automation in Construction 18(3): 285–293. http://dx.doi.org/10.1016/j.autcon.2008.09.005 doi: 10.1016/j.autcon.2008.09.005
- Cordon, O.; Herrera, F.; Stutzle, T. 2002. A review on the ant colony optimization metaheuristic: basis, models, and new trends, Matyhware & Soft Computing 9: 1–35.
- Dorigo, M.; Blum, C. 2005. Ant colony optimization theory: a survey, Theoretical Computer Science 344(2): 243–278. http://dx.doi.org/10.1016/j.tcs.2005.05.020 doi: 10.1016/j.tcs.2005.05.020
- Dorigo, M.; Socha, K. 2007. An introduction to ant colony optimization. NY: CRC Press. 34 p.
- Dorigo, M.; Birattari, M.; Stutzle, T. 2006. Ant colony optimization, Computational Intelligence Magazine 1(4): 28–39. http://dx.doi.org/10.1109/MCI.2006.329691 doi: 10.1109/MCI.2006.329691
- Dorigo, M.; Bonabeau, E.; Theraulaz, G. 2000. Ant algorithms and stigmergy, Future Generation Computer Systems 16(8): 851–871. http://dx.doi.org/10.1016/S0167-739X(00)00042-X doi: 10.1016/S0167-739X(00)00042-X
- Duan, Q.; Liao, T. W. 2010. Improved ant colony optimization algorithms for determining project critical paths, Automation in Construction 19(6): 676–693. http://dx.doi.org/10.1016/j.autcon.2010.02.012 doi: 10.1016/j.autcon.2010.02.012
- Hennink, M.; Hutter, I.; Bailey, A. 2010. Qualitative research methods. NY: SAGE Publications. 28 p.
- Hoseini, P.; Shayesteh, M. G. 2013. Efficient contrast enhancement of images using hybrid ant colony optimisation, genetic algorithm, and simulated annealing, Digital Signal Processing 23(3): 879–893. http://dx.doi.org/10.1016/j.dsp.2012.12.011 doi: 10.1016/j.dsp.2012.12.011
- Junior, L. S.; Nedjah, N.; de Macedo Mourelle, L. 2013. Routing for applications in NoC using ACO-based algorithms, Applied Soft Computing 13(5): 2224–2231. http://dx.doi.org/10.1016/j.asoc.2013.01.009 doi: 10.1016/j.asoc.2013.01.009
- Kloppenborg, T. J. 2009. Contemporary project management: organize, plan, perform. 2nd ed. Ohio: South Western Educational Publishing. 13 p.
- Lam, K. C.; Ning, X.; Ng, T. 2007. The application of the ant colony optimization algorithm to the construction site layout planning problem, Construction Management and Economics 25(4): 359–374. http://dx.doi.org/10.1080/01446190600972870 doi: 10.1080/01446190600972870
- Mateos, C.; Pacini, E.; Garino, C. G. 2013. An ACO-inspired algorithm for minimizing weighted flowtime in cloudbased parameter sweep experiments, Advances in Engineering Software 56: 38–50. http://dx.doi.org/10.1016/j.advengsoft.2012.11.011 doi: 10.1016/j.advengsoft.2012.11.011
- Miller, P. 2010. Smart swarm. London: Collins. 22 p.
- Ng, S. T.; Zhang, Y. 2008. Optimizing construction time and cost using ant colony optimization approach, Journal of Construction Engineering and Management 134(9): 721–728. http://dx.doi.org/10.1061/(ASCE)0733-9364(2008)134:9(721) doi: 10.1061/(ASCE)0733-9364(2008)134:9(721)
- Ning, X.; Lam, K. C. 2013. Cost–safety trade-off in unequalarea construction site layout planning, Automation in Construction 32: 96–103. http://dx.doi.org/10.1016/j.autcon.2013.01.011 doi: 10.1016/j.autcon.2013.01.011
- Oloufa, A. A.; Hosni, Y. A.; Fayez, M.; Axelsson, P. 2004. Using DSM for modeling information flow in construction design projects, Civil Engineering and Environment Sytems 21(2): 105–125. http://dx.doi.org/10.1080/10286600310001638474 doi: 10.1080/10286600310001638474
- Parpinelli, R. S.; Lopes, H. S.; Freitas, A. A. 2002. Data mining with an ant colony optimization algorithm, IEEE Transactions on Evolutionary Computation 6(4): 321–332. http://dx.doi.org/10.1109/TEVC.2002.802452 doi: 10.1109/TEVC.2002.802452
- Shankar, N. R.; Rao, P. P. B.; Siresha, S.; Madhuri, K. U. 2011. Critical path method in a project network using ant colony optimization, International Journal of Computational Intelligence Research 7(1): 7–16.
- Srour, I. M.; Abdul-Malak, M. A. U.; Yassine, A. A.; Ramadan, M. 2013. A methodology for scheduling overlapped design activities based on dependency information, Automation in Construction 29:1–11. http://dx.doi.org/10.1016/j.autcon.2012.08.001 doi: 10.1016/j.autcon.2012.08.001
- Stutzle, T.; Hoos, H. H. 2000. MAX–MIN Ant system, Future Generation Computer Systems 16(8): 889–914. http://dx.doi.org/10.1016/S0167-739X(00)00043-1 doi: 10.1016/S0167-739X(00)00043-1
- Thiruvady, D.; Singh, G.; Ernst, A. T.; Meyer, B. 2013. Constraint-based ACO for a shared resource constrained scheduling problem, International Journal of Production Economics 141(1): 230–242. http://dx.doi.org/10.1016/j.ijpe.2012.06.012 doi: 10.1016/j.ijpe.2012.06.012
- Tzortzopoulos, P.; Cooper, R. 2007. Design management from a contractor’s perspective: the need for clarity, Architectural Engineering and Design Management 3(1): 17–28.
- Zhang, Y.; Ng, S. T. 2012. An ant colony system based decision support system for construction time-cost optimization, Journal of Civil Engineering and Management 18(4): 580–589. http://dx.doi.org/10.3846/13923730.2012.704164 doi: 10.3846/13923730.2012.704164