References
- Abdelgawad, M.; Fayek, A. 2010. Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP, Journal of Construction Engineering and Management 136(9): 1028–1036. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000210
- Abdelgawad, M.; Fayek, A. 2011. Fuzzy reliability analyzer: quantitative assessment of risk events in the construction industry using fuzzy fault-tree analysis, Journal of Construction Engineering and Management 137(4): 294–302. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000285
- Al-Abdul Wahhab, H. I.; Asi, I. M. 1994. Optimization of roller compacted concrete for local application, Transportation Research Record 1458: 1–7.
- Ardeshir, A.; Mohseni, N.; Behzadian, K.; Errington, M. 2014. Selection of a bridge construction site using fuzzy Analytical Hierarchy Process in geographic information system, Arabian Journal for Science and Engineering 39(6): 4405–4420. http://dx.doi.org/10.1007/s13369-014-1070-2
- Ashley, D. B.; Diekmann, J. E.; Molenaar, K. R. 2006. Guide to risk assessment and allocation for highway construction management. Report No. FHWA-PL-06-032, October 2006. Federal Highway Administration, US Department of Transportation.
- Carbone, T. D.; Tippett, D. D. 2004. Project risk management using the project risk FMEA, Engineering Management Journal 14(4): 28–35. http://dx.doi.org/10.1080/10429247.2004.11415263
- Cooper, D. F.; Grey, S.; Raymond, G.; Walker, P. 2005. Project risk management guidelines: managing risk in large projects and complex procurements. New York: Wiley. 400 p.
- Creedy, G.; Skitmore, M.; Wong, J. 2010. Evaluation of risk factors leading to cost overrun in delivery of highway construction projects, Journal of Construction Engineering and Management 136(5): 528–537. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000160
- Diab, M. F.; Varma, A.; Nassar, K. 2012. Using risk assessment to improve highway construction project performance, in Proceedings of the 48th ASC Annual International Conference, 11–14 April 2012, Birmingham City University, Birmingham, UK. 8 p.
- Fan, M.; Lin, N. P.; Sheu, C. 2008. Choosing a project risk-handling strategy: an analytical model, International Journal of Production Economics 112(2): 700–713. http://dx.doi.org/10.1016/j.ijpe.2007.06.006
- Jazebi, F.; Rashidi, A. 2013. An automated procedure for selecting project managers in construction firms, Journal of Civil Engineering and Management 19(1): 97–106. http://dx.doi.org/10.3846/13923730.2012.738707
- Jouandou, R. 2010. Dealing with uncertainty: selecting a risk analysis tool on the basic project characteristics and phases: Master thesis. Department of Civil, Environmental and Architectural Engineering, University of Colorado, USA.
- Mahamid, I. 2011. Risk matrix for factors affecting time delay in road construction projects: owner’s perspective, Engineering, Construction and Architectural Management 18(6): 609–617. http://dx.doi.org/10.1108/09699981111180917
- Maher, M. L. J.; Smith, A. D. 2006. Risk-based cost and schedule estimation for large transportation projects, in Annual European Transport Conference, 18–20 September 2006, Strasbourg, France. 14 p.
- Nassar, K.; Nassar, W.; Hegab, M. 2005. Evaluating cost overruns of asphalt paving project using statistical process control methods, Journal of Construction Engineering and Management 131(11): 1173–1178. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:11(1173)
- Nývlt, O.; Prívara, S.; Ferkl, L. 2011. Probabilistic risk assessment of highway tunnels, Tunnelling and Underground Space Technology 26(6): 71–82. http://dx.doi.org/10.1016/j.tust.2010.06.010
- Perera, B. A. K. S.; Dhanasinghe, I.; Rameezdeen, R. 2009. Risk management in road construction: the case of Sri Lanka, International Journal of Strategic Property Management 13(2): 87–102. http://dx.doi.org/10.3846/1648-715X.2009.13.87-102
- Project Management Institute (PMI). 2008. A guide to the project management body of knowledge: PMBOK guide. 459 p.
- Rashidi, A.; Jazebi, F.; Brilakis, I. 2010. Neurofuzzy genetic system for selection of construction project managers, Journal of Construction Engineering and Management 137(1): 17–29. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000200
- Saaty, T. L. 1982. Decision making for leaders: the analytical hierarchy process for decision in a complex world. Belmont, CA, USA: Lifetime Learning. 323 p.
- Sant’Anna, A. P. 2012. Probabilistic priority numbers for failure modes and effects analysis, International Journal of Quality & Reliability Management 29(3): 349–362. http://dx.doi.org/10.1108/02656711211216171
- Seyedhosseini, S. M.; Noori, S.; Hatefi, M. A. 2009. An integrated methodology for assessment and selection of the project risk response actions, Risk Analysis 29(5): 752–763. http://dx.doi.org/10.1111/j.1539-6924.2008.01187.x
- Torfi, F.; Rashidi, A. 2011. Selection of project managers in construction firms using analytic hierarchy process (AHP) and fuzzy Topsis: a case study, Journal of Construction in Developing Countries 16(1): 69–89.
- Uff, J. (Ed.). 1995. Risk, management and procurement in construction. London: Centre of Construction Law and Management. 470 p.
- U.S. Department of Defence. 1980. Procedures for performing a failure mode effects and criticality analysis. MILSTD-1929A: Military standard, Washington, D.C.
- Wang, M.; Chou, H. 2003. Risk allocation and risk handling of highway projects in Taiwan, Journal of Management in Engineering 19(2): 60–68. http://dx.doi.org/10.1061/(ASCE)0742-597X(2003)19:2(60)
- Wilson, C. R.; Molenaar, K. R. 2009. A risk-based approach to contingency estimation in highway project development, in Proceedings of Construction Research Congress, 5–7 April 2009, Seattle, Washington, United States, 786–795.
- Zavadskas, E. K.; Turskis, Z.; Tamošaitiene, J. 2010. Risk assessment of construction projects, Journal of Civil Engineering and Management 16(1): 33–46. http://dx.doi.org/10.3846/jcem.2010.03