References
- Abedgeno, M. P.; Ogunlana, S. O. 2006. Good project governance for proper risk allocation in public-private partnership in Indonesia, International Journal of Project Management 24: 622–634. https://doi.org/10.1016/j.ijproman.2006.07.010
- Akcay, E. C. 2014. Using Monte Carlo simulation and multiagent systems to estimate financial feasibility of HEPP projects tendered on a BOT basis: A case study from Turkey: PhD Thesis. Middle East Technical University.
- Al-Bahar, J.; Crandall, K. 1990. Systematic risk management approach for construction projects, Journal of Construction Engineering Management 116: 533–546. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:3(533)
- Beeston, D. 1986. Combining risks in estimating, Construction Management and Economics 4: 75–79. https://doi.org/10.1080/01446198600000005
- Bing, L.; Akintoye, A.; Edwards, P. J.; Hardcastle, C. 2005. The allocation of risk in PPP/PFI construction projects in the UK, International Journal of Project Management 23(1): 25–35. https://doi.org/10.1016/j.ijproman.2004.04.006
- Blank, L.; Tarquin, A. 2012. Engineering economy. 7th ed. McGraw-Hill, USA.
- Chan, A. P. C.; Yeung, J. F. Y.; Yu, C. C. P.; Wang, S. Q.; Ke, Y. 2011. Empirical study of risk assessment and allocation of public-private partnership projects in China, Journal of Management in Engineering 27(3): 136–148. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000049
- Flanagan, R.; Norman, G. 1993. Risk management and construction. Victoria: Blackwell Science Pty Ltd., Australia.
- Ghorbani, A.; Ravanshadnia, M.; Nobakht, M. B. 2014. A survey of risks in public private partnership highway projects in Iran, in ICCREM 2014@ sSmart Construction and Management in the Context of New Technology, ASCE, 482–492.
- Ibrahim, A. D.; Price, A. D. F.; Dainty, A. R. J. 2006. The analysis and allocation of risks in public private partnerships in infrastructure projects in Nigeria, Journal of Financial Management of Property and Construction 11(3): 149–163. https://doi.org/10.1108/13664380680001086
- International Energy Agency (IEA). 2007. Renewables in global energy supply, fact sheet. Paris: OECD/IEA.
- James, A. 2013. Three ways to increase hydropower efficiency and revenues. Renewable Energy World.
- Jin, X. H.; Zhang, G. 2011. Modelling optimal risk allocation in PPP projects using artificial neural networks, International Journal of Project Management 29: 591–603. https://doi.org/10.1016/j.ijproman.2010.07.011
- Karim, N. A. A. 2011. Risk allocation in Public-Private Partnership (PPP) project: A review on risk factors, International Journal of Sustainable Construction Engineering & Technology 2(2): 8–16.
- Ke, Y.; Wang, S.; Chan, A. P. C.; Lam, P. T. I. 2010. Preferred risk allocation in China’s Public Private Partnership (PPP) projects, Journal of Project Management 28: 482–492. https://doi.org/10.1016/j.ijproman.2009.08.007
- Lee, R.; Shen, L. Y. 1998. Overview of Chinese government policies to attract BOT investment, J. Hong Kong Surveyor 9(1): 48–52.
- Li, B.; Akintoye, A. 2008. An overview of public-private partnership, in Public-private partnerships: Managing risks and opportunities, 1–30.
- Lianyu, C.; Tiong, R. L. K. 2005. Minimum feasible tariff model for BOT water supply projects in Malaysia, Construction Management and Economics 23: 255–263. https://doi.org/10.1080/0144619042000287778
- Liou, F. M.; Huang, C. P. 2008. Automated approach to negotiations of BOT contracts with the consideration of project risk, Journal of Construction Engineering Management 134(1): 18–24. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(18)
- Liu, J.; Love, P. E.; Smith, J.; Regan, M.; Davis, P. R. 2014. Life cycle critical success factors for public-private partnership infrastructure projects, Journal of Management in Engineering 31(5). http://doi.org/10.1061/(ASCE)ME.1943-5479.0000307
- Liu, T.; Wang, Y.; Wilkinson, S. 2016. Identifying critical factors affecting the effectiveness and efficiency of tendering processes in Public–Private Partnerships (PPPs): A comparative analysis of Australia and China, International Journal of Project Management 34(4): 701–716. https://doi.org/10.1016/j.ijproman.2016.01.004
- Malini, E. 1999. Build operate transfer municipal bridge projects in China, Journal of Management in Engineering 15(4): 51–58. https://doi.org/10.1061/(ASCE)0742-597X(1999)15:4(51)
- Medda, F. 2007. A game theory approach for the allocation of risks in transport public private partnerships, International Journal of Project Management 25(3): 213–218. https://doi.org/10.1016/j.ijproman.2006.06.003
- Ng, A.; Loosemore, M. 2007. Risk allocation in the private provision of public infrastructure, International Journal of Project Management 25(1): 66–76. https://doi.org/10.1016/j.ijproman.2006.06.005
- Ng, T. S.; Xie, J. Z.; Cheung, Y. K.; Jefferies, M. 2007. A simulation model for optimizing the concession period of public private partnerships schemes, International Journal of Project Management 25(8): 791–798. https://doi.org/10.1016/j.ijproman.2007.05.004
- Osei-Kyei, R.; Chan, A. 2015. Review of studies on the critical success factors for Public–Private Partnership (PPP) projects from 1990 to 2013, International Journal of Project Management 33(6): 1335–1346. https://doi.org/10.1016/j.ijproman.2015.02.008
- Ozdogan, I. D.; Birgonul, M. T. 2000. A decision support framework for project sponsors in the planning stage of Build-Operate-Transfer (BOT) projects, Construction Management and Economics 18(3): 343–353. https://doi.org/10.1080/014461900370708
- PMBOK. 2011. Project management body of knowledge. Project Management Institute.
- Pouliquen, L. Y. 1970. Risk analysis in project appraisal. World Bank Staff Occasional Papers No 11. London: John Hopkins Press Ltd.
- Republic of Turkey Ministry of Energy and Natural Resources (RTMENR). 2017. Hydraulics [online], [cited 10 January 2017]. Available from Internet: http://www.enerji.gov.tr/en-US/Pages/Hydraulics.
- Shao, Y.; Yuan, J.; Li, Q. 2016. Identification of the residual value risk factors for road PPP projects in China: Questionnaire survey and analysis, in Proceedings of the 20th International Symposium on Advancement of Construction Management and Real Estate, 2016, 379–389.
- Shen, L. N.; Li, H.; Li, Q. M. 2002. Alternative concession model for build operate transfer contract projects, Journal of Construction Engineering and Management 128(4): 326–330. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(326)
- Shen, L. Y.; Bao, H. J.; Wu, Y. Z.; Lu, W. S. 2007. Using bargaining game theory for negotiating concession period for BOT-type contract, Journal of Construction Engineering Management 133(5): 385–392. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:5(385)
- Shen, L. Y.; Platten, A.; Deng, X. 2006. Role of public private partnership to manage risk in public sector project in Hong Kong, International Journal of Project Management 24: 587–594. https://doi.org/10.1016/j.ijproman.2006.07.006
- Shen, L. Y.; Wu, Y. Z. 2005. Risk concession model for build operate transfer contract projects, Journal of Construction Engineering and Management 131(2): 211–220. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:2(211)
- Shen, L.; Lee, K. H.; Zhang, Z. 1996. Application of BOT system for infrastructure projects in China, Journal of Construction Engineering and Management 122(4): 319–324. https://doi.org/10.1061/(ASCE)0733-9364(1996)122:4(319)
- Singh, L. B.; Kalidindi, S. N. 2006. Traffic revenue risk management through Annuity Model of PPP road projects in India, International Journal of Project Management 24: 605–613. https://doi.org/10.1016/j.ijproman.2006.07.008
- Smith, N. J. 1999. Managing risk in construction projects. Blackwell Science.
- Song, J.; Song, D.; Zhang, D. 2015. Modeling the concession period and subsidy for BOT waste-to-energy incineration projects, Journal of Construction Engineering and Management 141(10). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001005
- Syncopation. 2017. What constitutes a good tornado diagram? [online], [cited 5 January 2017]. Available from Internet: https://www.syncopation.com/blog/what-constitutes-good-tornado-diagram
- Tang, L.; Shen, G.; Skitmore, M.; Wang, H. 2015. Procurement-related critical factors for briefing in public-private partnership projects: Case of Hong Kong, Journal of Management in Engineering 31(6). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000352
- TCA. 2016. Turkish contractors association [online], [cited 7 Decemeber 2016]. Available from Internet: http://www.tmb.org.tr
- Wang, S. Q.; Tiong, R. L. K.; Ting, S. K.; Ashley, D. 2000. Evaluation and management of foreign exchange and revenue risks in China’s BOT projects, Construction Management and Economics 18: 197–207. https://doi.org/10.1080/014461900370825
- Wibowo, A.; Mohamed, S. 2010. Risk criticality and allocation in privatised water supply projects in Indonesia, International Journal of Project Management 28: 504–513. https://doi.org/10.1016/j.ijproman.2009.08.003
- Xenidis, Y.; Angelides, D. 2005. The financial risks in build-operate-transfer projects, Construction Management and Economics 23(4): 431–441. https://doi.org/10.1080/01446190500041552
- Xing, W.; Wu, F. F. 2001. A game-theoretical model of private power production, International Journal of Electrical Power & Energy Systems 23(3): 213–218. https://doi.org/10.1016/S0142-0615(00)00059-4
- Xu, Y.; Hu, C.; Chan, A. P. C. 2009. Risk factors for running Public Private Partnerships (PPP) – An empirical comparison between government and private sector, in International Conference on Management and Service Science (MASS’09), 2009, Wuhan, China.
- Ye, B. S.; Tiong, R. L. K. 2000. NPV-at-risk method in infrastructure project investment evaluation, Journal of Construction Engineering Management 126(3): 227–233. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:3(227)
- Yuan, J. F.; Deng, X. P.; Li, Q. M. 2008. Critical risks identification of Public Private Partnerships in China and the analysis on questionnaire survey, in 4th International Conference on Wireless Communications, Networking and Mobile Computing (WiCOM’08), 2008, Dalian, China. https://doi.org/10.1109/wicom.2008.2453
- Zayed, T. M.; Chang, L. M. 2002. Prototype model for buildoperate-transfer risk assessment, Journal of Management in Engineering 18(1): 7–16. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:1(7)
- Zhang, X. 2005. Paving the way for public–private partnerships in infrastructure development, Journal of Construction Engineering and Management 131(1): 71–80. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:1(71)
- Zhang, X. Q.; Abourizk, S. M. 2006. Determining a reasonable concession period for private sector provision of public works and services, Canadian Journal of Civil Engineering 33(5): 622–631. https://doi.org/10.1139/l06-010