References
- Alarcon, L. F.; Ashley, D. B.; Hanily, A. S. D.; Molenaar, K. R.; Ungo, R. 2010. Risk planning and management for the Panama Canal expansion program, Journal of Construction Engineering and Management 137(10): 762–771. http://doi.org/10.1061/(ASCE)CO.1943-7862.0000317
- Ale, B.; Van Gulijk, C.; Hanea, A.; Hanea, D.; Hudson, P.; Lin, P. H.; Sillem, S. 2014. Towards BBN based risk modelling of process plants, Safety Science 69: 48–56. http://doi.org/10.1016/j.ssci.2013.12.007
- Alireza, V.; Mohammadreza, M.; Zin, R. M.; Yahaya, N.; Noor, N. M. 2013. An enhanced multi-objective optimization approach for risk allocation in public–private partnership projects: a case study of Malaysia, Canadian Journal of Civil Engineering 41(2): 164–177. https://doi.org/10.1139/cjce-2013-0342
- Ashley, D. B.; Teicholz, P. M. 1977. Pre-estimate cash flow analysis, Journal of the Construction Division 103: 369–379.
- Berdicevsky, S. 1978. Erection cost flow analysis in public projects: MSc thesis. Technion-Israel Institute of Technology, Haifa, Israel.
- Berny, J.; Howes, R. 1982. Project management control using real-time budgeting and forecasting models, Construction Papers 2(1): 19–40.
- Betts, M.; Gunner, J. 1993. Financial management of construction projects. Longman Singapore Publishers Ltd.
- Bromilow, F. J.; Henderson, J. A. 1977. Procedures for reckoning the performance of building contracts. 2nd ed. CSIRO, Division of Building Research Special Report, Highett, Australia.
- Cárdenas, I. C.; Al-Jibouri, S. S.; Halman, J. I.; Tol, F. A. 2014. Modeling risk-related knowledge in tunneling projects, Risk Analysis 34(2): 323–339. https://doi.org/10.1111/risa.12094
- Chanas, S.; Kamburowski, J. 1981. The use of fuzzy variables in PERT, Fuzzy sets and Systems 5(1): 11–19. https://doi.org/10.1016/0165-0114(81)90030-0
- Cheng, M. Y.; Tsai, H. C.; Sudjono, E. 2010. Evolutionary fuzzy hybrid neural network for project cash flow control, Engineering Applications of Artificial Intelligence 23(4): 604–613. http://doi.org/10.1016/j.engappai.2009.10.003
- Choudhry, R. M.; Aslam, M. A.; Hinze, J. W.; Arain, F. M. 2014. Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines, Journal of Construction Engineering and Management 140(7), 04014020. http://doi.org/10.1061/(ASCE)CO.1943-7862.0000857
- Christian, J. T. 2004. Geotechnical engineering reliability: How well do we know what we are doing?, Journal of Geotechnical and Geoenvironmental Engineering 130(10): 985–1003. http://doi.org/10.1061/(ASCE)1090-0241(2004)130:10(985)
- Cui, Q.; Hastak, M.; Halpin, D. 2010. Systems analysis of project cash flow management strategies, Construction Management and Economics 28(4): 361–376. http://doi.org/10.1080/01446191003702484
- De Marco, A. 2011. Project management for facility constructions: A guide for engineers and architects. Germany: Springer Science & Business Media.
- Dikmen, I.; Birgonul, M. T.; Han, S. 2007. Using fuzzy risk assessment to rate cost overrun risk in international construction projects, International Journal of Project Management 25(5): 494–505. http://doi.org/10.1016/j.ijproman.2006.12.002
- El razek, M. A.; Hosny, H. e. D.; El Beheri, A. 2014. Risk factors in construction projects cash-flow analysis, International Journal of Computer Science Issues 11(1): 199–215.
- Eshtehardian, E.; Khodaverdi, S. 2016. A Multiply Connected Belief Network approach for schedule risk analysis of metropolitan construction projects, Civil Engineering and Environmental Systems 33(3): 227–246. http://doi.org/10.1080/10286608.2016.1184492
- Fenton, N.; Neil, M. 2012. Risk assessment and decision analysis with Bayesian networks. USA: CRC Press.
- Fondahl, J. W.; Bacarreza, R. R. 1972. Construction contract markup related to forecasted cash flow. Stanford: Department of Civil Engineering, Stanford University.
- Ghoddousi, P. 2006. Planning and control of civil engineering projects. Tehran: Iran University of Science and Technology Press.
- Hudson, K. W. 1978. D. H. S. S. expenditure forecasting method, Chartered Surveyor: Building and Quantity Surveying Quarterly 5(3): 42–45.
- Hwee, N. G.; Tiong, R. L. 2002. Model on cash flow forecasting and risk analysis for contracting firms, International Journal of Project Management 20(5): 351–363. http://doi.org/10.1016/S0263-7863(01)00037-0
- Jannadi, O. A.; Almishari, S. 2003. Risk assessment in construction, Journal of Construction Engineering and Management 129(5): 492–500. http://doi.org/10.1061/(ASCE)0733-9364(2003)129:5(492)
- Jarkas, A. M.; Haupt, T. C. 2015. Major construction risk factors considered by general contractors in Qatar, Journal of Engineering, Design and Technology 13(1): 165–194. http://doi.org/10.1108/JEDT-03-2014-0012
- Jarrah, R.; Kulkarni, D., O’Connor, J. T. 2007. Cash flow projections for selected TxDoT highway projects, Journal of Construction Engineering and Management 133(3): 235–241. http://doi.org/10.1061/(ASCE)0733-9364(2007)133:3(235)
- Jensen, F. V.; Nielson, T. D. 2007. Bayesian networks and decision graphs. USA: Springer.
- Kaka, A. P. 1996. Towards more flexible and accurate cash flow forecasting, Construction Management and Economics 14(1): 35–44. http://doi.org/10.1080/01446199600000005
- Kaka, A. P.; Price, A. D. F. 1991. Net cash flow models: Are they reliable?, Construction Management and Economics 9(3): 291–308. http://doi.org/10.1080/01446199100000023
- Kenley, R. 2003. Financing construction: Cash flows and cash farming. London: Routledge.
- Kenley, R.; Wilson, O. D. 1989. A construction project net cash flow model, Construction Management and Economics 7: 3–18.
- Khosrowshahi, F. 1991. Simulation of expenditure patterns of construction projects, Construction Management and Economics 9: 113–132.
- Kim, S. Y.; Van Tuan, N.; Ogunlana, S. O. 2009. Quantifying schedule risk in construction projects using Bayesian belief networks, International Journal of Project Management 27(1): 39–50. http://doi.org/10.1016/j.ijproman.2008.03.003
- Mahamid, I. 2013. Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective, Construction Economics and Building 13(2): 45–53. http://doi.org/10.5130/AJCEB.v13i2.3194
- Maravas, A.; Pantouvakis, J. P. 2012. Project cash flow analysis in the presence of uncertainty in activity duration and cost, International Journal of Project Management 30(3): 374–384. http://doi.org/10.1016/j.ijproman.2011.08.005
- McCabe, B.; AbouRizk, S. M.; Goebel, R. 1998. Belief networks for construction performance diagnostics, Journal of Computing in Civil Engineering 12(2): 93–100. http://doi.org/10.1061/(ASCE)0887-3801(1998)12:2(93)
- Miskawi, Z. 1989. An S-curve equation for project control, Construction Management and Economics 7: 115–124.
- Namazi, M.; Shokrolahi, A.; Maharluie, M. S. 2016. Detecting and ranking cash flow risk factors via artificial neural networks technique, Journal of Business Research 69(5): 1801–1806. https://doi.org/10.1016/j.jbusres.2015.10.059
- Nasir, D.; McCabe, B.; Hartono, L. 2003. Evaluating risk in construction-schedule model (ERIC-S): construction schedule risk model, Journal of Construction Engineering and Management 129(5): 518–527. http://doi.org/10.1061/(ASCE)0733-9364(2003)129:5(518)
- Navon, R. 1996. Company-level cash-flow management, Journal of Construction Engineering and Management 122(1): 22–29. http://doi.org/10.1061/(ASCE)0733-9364(1996)122:1(22)
- Norsys Software Corporation. 2010. Netica version 4.16. Available from Internet: http://www.norsys.com
- Paek, J. H.; Lee, Y. W.; Ock, J. H. 1993. Pricing construction risk: fuzzy set application, Journal of Construction Engineering and Management 119(4): 743–756. http://doi.org/10.1061/(ASCE)0733-9364(1993)119:4(743)
- Park, H. K.; Han, S. H.; Russell, J. S. 2005. Cash flow forecasting model for general contractors using moving weights of cost categories, Journal of Management in Engineering 21(4): 164–172. http://doi.org/10.1061/(ASCE)0742-597X(2005)21:4(164)
- Peer, S. 1982. Application of cost-flow forecasting models, Journal of the Construction Division, Proceedings of the American Society of Civil Engineers 108(CO2): 226–231.
- Poh, Y. P.; Tah, J. H. M. 2006. Integrated duration–cost influence network for modelling risk impacts on construction tasks, Construction Management and Economics 24(8): 861–868. http://doi.org/10.1080/01446190600658891
- Prade, H. 1979. Using fuzzy set theory in a scheduling problem: a case study, Fuzzy Sets and Systems 2(2): 153–165. https://doi.org/10.1016/0165-0114(79)90022-8
- Russell, J. S. 1991. Contractor failure: analysis, Journal of Performance of Constructed Facilities 5(3): 163–180. http://doi.org/10.1061/(ASCE)0887-3828(1991)5:3(163)
- Sii, H. S.; Ruxton, T.; Wang, J. 2001. A fuzzy-logic-based approach to qualitative safety modelling for marine systems, Reliability Engineering & System Safety 73(1): 19–34. http://doi.org/10.1016/S0951-8320(01)00023-0
- Son, J.; Mack, M.; Mattila, K. G. 2006. Nonlinear cash flow optimization model, Canadian Journal of Civil Engineering 33(11): 1450–1454. http://doi.org/10.1139/l06-086
- Sousa, R. L.; Einstein, H. H. 2012. Risk analysis during tunnel construction using Bayesian Networks: Porto Metro case study, Tunnelling and Underground Space Technology 27(1): 86–100. http://doi.org/10.1016/j.tust.2011.07.003
- Tah, J. H. M.; Carr, V. 2000. A proposal for construction project risk assessment using fuzzy logic, Construction Management and Economics 18(4): 491–500. http://doi.org/10.1080/01446190050024905
- Touran, A.; Atgun, M. Bhurisith, I. 2004. Analysis of the United States Department of Transportation prompt pay provisions, Journal of Construction Engineering and Management 130(5): 719–725. http://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(719)
- Tu, J. V. 1996. Advantages and disadvantages of using artificial neural networks versus logistic regression for predicting medical outcomes, Journal of Clinical Epidemiology 49(11): 1225–1231. https://doi.org/10.1016/S0895-4356(96)00002-9
- Tucker, S. N. 1986. Formulating construction cash flow curves using a reliability theory analogy, Construction Management and Economics 4: 179–188.
- Tucker, S. N. 1988. A single alternative formula for the Department of Health and Social Security S-curves, Construction Management and Economics 6: 13–23.
- Uusitalo, L. 2007. Advantages and challenges of Bayesian networks in environmental modelling, Ecological Modelling 203(3): 312–318. http://doi.org/10.1016/j.ecolmodel.2006.11.033
- Wang, Y. M.; Elhag, T. M. 2007. A comparison of neural network, evidential reasoning and multiple regression analysis in modelling bridge risks, Expert Systems with Applications 32(2): 336–348. http://doi.org/10.1016/j.eswa.2005.11.029
- Wu, W. W. 2010. Linking Bayesian networks and PLS path modeling for causal analysis, Expert Systems with Applications 37(1): 134–139. http://doi.org/10.1016/j.eswa.2009.05.021
- Yildiz, A. E.; Dikmen, I.; Birgonul, M. T.; Ercoskun, K.; Alten, S. 2014. A knowledge-based risk mapping tool for cost estimation of international construction projects, Automation in Construction 43: 144–155. http://doi.org/10.1016/j.autcon.2014.03.010
- Yu, M. C.; Dang, V. L.; Yeh, H. C. 2017. Measuring cash flow and overdraft for fuzzy project networks with overlapping activities, Journal of Civil Engineering and Management 23(4): 487–498. http://doi.org/10.3846/13923730.2016.1210215
- Zammori, F. A.; Braglia, M.; Frosolini, M. 2009. A fuzzy multicriteria approach for critical path definition, International Journal of Project Management 27(3): 278–291. http://doi.org/10.1016/j.ijproman.2008.03.006
- Zhao, X.; Hwang, B. G.; Low, S. P. 2015. Enterprise risk management in international construction operations. Singapore: Springer.