References
- Alibabaei, A.; Aghdasi, M.; Zarei, B.; Stewart, G. 2010. The role of culture in business process management initiatives, Australian Journal of Basic and Applied Sciences 7(4): 2143–2154.
- Ambastha, A.; Momaya, K. 2004. Competitiveness of firms: review of theory, frameworks, and models, Singapore Management Review 26(1): 45–61.
- Andjelkovic Pesic, M. 2009. Business process management maturity model and Six Sigma: an integrated approach for easier networking [online], [cited 25 August 2012]. International Conference on Economics and Management of Networks (EMNet 2009), 3–5 September 2009, Sarajevo, Bosnia and Herzegovina. Available from Internet: https://emnet.univie.ac.at/uploads/media/Andjelkovic-Pesic_01.pdf
- Arsanjani, A.; Bharade, N.; Borgenstrand, M.; Schume, P.; Wood, K. J.; Zheltonogov, V. 2015. Business process management design guide using IBM business process manager [online], [cited 11 January 2016], International Business Machines Corporation. Available from Internet: http://www.redbooks.ibm.com/abstracts/sg248282.html
- Arzu Akyuz, G.; Erman Erkan, T. 2010. Supply chain performance measurement: a literature review, International Journal of Production Research 48(17): 5137–5155. http://dx.doi.org/10.1080/00207540903089536
- Boskovic, G.; Radosavljevic, M. 2015. Analysis of factors and effects of product design quality, Economic Themes 53(4): 495–513. http://dx.doi.org/10.1515/ethemes-2015-0028
- Bowersox, D. J.; Closs, D. J.; Stank, T. P. 2000. Ten mega trends that will revolutionize supply chain logistics, Journal of Business Logistics 21(2): 1–16.
- Chopra, S.; Meindl, P. 2009. Supply chain management – strategy, planning and operations. New York: Prentice Hall.
- Curtis, B.; Alden, J. 2007. The business process maturity model: what, why and how, A BPTrends Column 2: 1–4.
- Dasic, P. 2012. Application of polynomial regression models for approximation of time series, Journal of Economic and Management Based on New Technologies 1(2): 81–160.
- De Bruin, T.; Freeze, R.; Kaulkarni, U.; Rosemann, M. 2005. Understanding the main phases of developing a maturity assessment model, in 16th Australasian Conference on Information Systems (ACIS 2005), 30 November – 2 December, 2005, Sydney, Australia.
- De Bruin, T. 2007. Insights into the evolution of BPM in organizations, in 18th Australasian Conference on Information Systems (ACIS 2007), 5–7 December, 2007, Toowoomba, Australia.
- De Oliveira, M. P. V.; Ladeira, M. B.; McCormack, K. P. 2011. The supply chain process management maturity model – SCPM3, Chapter 13 in D. Önkal, E. Aktas (Eds.). Supply chain management–pathways for research and practice, Rijeka, Croatia: InTech. http://dx.doi.org/10.5772/18961
- Everitt, B.; Hothorn, T. 2011. An introduction to applied multivariate analysis with R. New York, NY: Springer. http://dx.doi.org/10.1007/978-1-4419-9650-3
- Fawcett, S. E.; Magnan, G. M. 2002. The rhetoric and reality of supply chain integration, International Journal of Physical Distribution and Logistics Management 32(5): 339–361. http://dx.doi.org/10.1108/09600030210436222
- Fisher, M. 2004. The business process maturity model: a practical approach for identifying opportunities for optimization, BPTrends 9: 1–7.
- Forslund, H.; Jonsson, P. 2009. Obstacles to supply chain integration of the performance management process in buyer-supplier dyads: the buyers’ perspective, International Journal of Operations & Production Management 29(1): 77–95. http://dx.doi.org/10.1108/01443570910925370
- Garcia, H.; Giachetti, R. 2010. Using experts to develop a supply chain maturity model in Mexico, Supply Chain Management: An International Journal 15(6): 415–424. doi: 10.1108/13598541011080400
- Garcia, H. 2008. A capability maturity model to assess supply chain performance. Doctoral dissertation, Florida International University, Miami, Florida.
- Gulledge, Jr, T. R.; Sommer, R. A. 2002. Business process management: public sector implications, Business Process Management Journal 8(4): 364–376. http://dx.doi.org/10.1108/14637150210435017
- Hammer, M. 2007. The process audit, Harvard Business Review 85(4): 1–17.
- Hasson, F.; Keeney, S.; McKenna, H. 2000. Research guidelines for the Delphi survey technique, Journal of Advanced Nursing 32(4): 1008–1015. http://dx.doi.org/10.1046/j.1365-2648.2000.01567.x
- Huffner, T. 2007. The BPM maturity model – towards a framework for assessing the business process management maturity of organisations: Master thesis. University of Karlsruhe, Norderstedt, Germany.
- Humphrey, W. 1988. Characterizing the software process: a maturity framework, IEEE Software 2(5): 73–79. http://dx.doi.org/10.1109/52.2014
- Hung, R. Y. Y. 2006. Business process management as competitive advantage: a review and empirical study, Total Quality Management & Business Excellence 17(1): 21–40. http://dx.doi.org/10.1080/14783360500249836
- Jaklic, J.; Trkman, P.; Groynik, A.; Stemberger, M. 2006. Enhancing lean supply chain maturity with business process management, Journal of Information and Organizational Sciences 30(2): 205–223.
- Janjic, V.; Todorovic, M.; Jovanovic, D. 2015. A comparative analysis of modern performance measurement and management models of companies, Economic Themes 53(2): 303–318. http://dx.doi.org/10.1515/ethemes-2015-0017
- Kothari, C. R. 2003. Research methodology: methods and techniques. New Delhi: Wishwa Prakashan.
- Landeta, J. 2006. Current validity of the Delphi method in social sciences, Technological Forecasting and Social Change 73(5): 467–482. http://dx.doi.org/10.1016/j.techfore.2005.09.002
- Lee, J.; Lee, D.; Kang, S. 2007. An overview of the business process maturity model (BPMM), Chapter 42 in K. C. Chang, W. Wang, L. Chen, C. A. Ellis, C. H. Hsu, A. C. Tsoi, H. Wang, X. Lin, Y. Yang, J. Xu (Eds.). Advances in Web and Network Technologies, and Information Management, Berlin, Germany: Springer. http://dx.doi.org/10.1007/978-3-540-72909-9_42
- Lindemulder, M. J. 2015. Development of a continuous improvement maturity model assessment instrument [online], [cited 15 December 2015]. Available from Internet: http://essay.utwente.nl/67322/1/Lindemulder_BA_BMS.pdf
- Lockamy, A.; McCormack, K. 2004. The development of a supply chain management process maturity model using the concepts of business process orientation, Supply Chain Management: an International Journal 9(4): 272–278. http://dx.doi.org/10.1108/13598540410550019
- Maull, S.; Tranfield, D.; Maull, W. 2003. Factors characterising the maturity of BPR programmes, International Journal of Operations & Production Management 23(6): 596–624. http://dx.doi.org/10.1108/01443570310476645
- McCormack, K.; Johnson, W. C. 2002. Supply chain networks and business process orientation: advanced strategies and best practices. Miami, Florida: CRC Press. http://dx.doi.org/10.1201/9781420000344
- McCormack, K.; Ladeira, M. B.; de Oliveira, M. P. V. 2008. Supply chain maturity and performance in Brazil, Supply Chain Management: an International Journal 13(4): 272–282. http://dx.doi.org/10.1108/13598540810882161
- McCormack, K. et al. 2009. A global investigation of key turning points in business process maturity, Business Process Management Journal 15(5): 792–815. http://dx.doi.org/10.1108/14637150910987946
- Netland, T. H.; Alfnes, E.; Fauske, H. 2007. How mature is your supply chain? A supply chain maturity assessment test, in 14th International EurOMA Conference Managing Operations in an Expanding Europe (EurOMA 2007), 17–20 June, 2007, Ankara, Turkey.
- Neubauer, T. 2009. An empirical study about the status of business process management, Business Process Management Journal 15(2): 166–183. http://dx.doi.org/10.1108/14637150910949434
- Palmberg, K. 2010. Experiences of implementing process management: a multiple-case study, Business Process Management Journal 16(1): 93–113. http://dx.doi.org/10.1108/14637151011017967
- Radosavljevic, M. 2015. Process orientation as a basis for increasing supply chain management maturity, Economic Themes 53(3): 407–423. http://dx.doi.org/10.1515/ethemes-2015-0023
- Röglinger, M.; Pöppelbuß, J.; Becker, J. 2012. Maturity models in business process management, Business Process Management Journal 18(2): 328–346. doi: 10.1108/14637151211225225
- Rosemann, M.; De Bruin, T. 2005. Application of a holistic model for determining BPM maturity, BPTrends 2: 1–21.
- Rosemann, M.; Vom Brocke, J. 2015. The six core elements of business process management, Chapter 5 in M. Rosemann, J. Vom Brocke (Eds.). Handbook on business process management 1, Berlin, Germany: Springer. http://dx.doi.org/10.1007/978-3-642-45100-3_5
- Sommerville, I.; Ransom, J. 2005. An empirical study of industrial requirements engineering process assessment and improvement, ACM Transactions on Software Engineering and Methodology 14(1): 85–117. http://dx.doi.org/10.1145/1044834.1044837
- Van Looy, A.; De Backer, M.; Poels, G. 2011. Defining business process maturity: a journey towards excellence, Total Quality Management & Business Excellence 22(11): 1119–1137. doi: 10.1080/14783363.2011.624779
- Vaidyanathan, K.; Howell, G. 2007. Construction supply chain maturity model–conceptual frame-work, in 15th IGLC Conference Lean Construction: A New Paradigm for Managing Capital Projects, 15 July, 2007, Michigan, USA.
- Van Landeghem, R.; Persoons, K. 2001. Benchmarking of logistical operations based on a causal model, International Journal of Operations & Production Management 21(1/2): 254–267. http://dx.doi.org/10.1108/01443570110358576
- Wu, Z.; Christensen, D.; Li, M.; Wang, Q. 2006. A survey of CMM/CMMI implementation in China, Chapter 41 in M. Li, B. Boehm, L. Osterweil (Eds.). Unifying the software process spectrum, Berlin, Germany: Springer. http://dx.doi.org/10.1007/11608035_41
- Zairi, M.; Ahmed, P. K. 1999. Benchmarking maturity as we approach the millennium?, Total Quality Management 10(4–5): 810–816. http://dx.doi.org/10.1080/0954412997848