REFERENCES
- Ahmad, I. 1990. Decision-support system for modeling bid/no-bid decision problem, Journal of Construction Engineering and Management 116(4): 595–608. http://dx.doi.org/10.1061/(ASCE)0733-9364(1990)116:4(595)
- Ahmad, I.; Minkarah, I. 1988. Questionnaire survey on bidding in construction, Journal of Management in Engineering 4(3): 229–243. http://dx.doi.org/10.1061/(ASCE)9742-597X(1988)4:3(229)
- Bageis, A. S.; Fortune, C. 2009. Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors, Construction Management and Economics 27(1): 53–71. http://dx.doi.org/10.1080/01446190802596220
- Banaitienė, N.; Banaitis, A. 2006. Analysis of criteria for contractors’ qualification evaluation, Technological and Economic Development of Economy 12(4): 276–282. http://dx.doi.org/10.1080/13928619.2006.9637754
- Brauers, W. K. M.; Zavadskas, E. K.; Turskis, Z.; Vilutienė, T. 2008. Multi-objective contractor's ranking by applying the MOORA method, Journal of Business Economics and Management 9(4): 245–255. http://dx.doi.org/10.3846/1611-1699.2008.9.245-255
- Cheng, E.; Li, H. 2004. Contractor selection using the analytic network process, Construction Management and Economics 22(10): 1021–1032. http://dx.doi.org/10.1080/0144619042000202852
- Chua, D. K. H.; Li, D. 2000. Key factors in bid reasoning model, Journal of Construction Engineering and Management 126(5): 349–357. http://dx.doi.org/10.1061/(ASCE)0733-9364(2000)126:5(349)
- Chua, D. K. H.; Li, D.; Chan, W. T. 2001. Case-based reasoning approach in bid decision making, Journal of Construction Engineering and Management 127(1): 35–45. http://dx.doi.org/10.1061/(ASCE)0733-9364(2001)127:1(35)
- Dikmen, I.; Birgonul, M. T.; Gur, A. K. 2007. A case-based decision support tool for bid mark-up estimation of international construction projects, Automation in Construction 17(1): 30–44. http://dx.doi.org/10.1016/j.autcon.2007.02.009
- Egemen, M.; Mohamed, A. 2008. SCBMD: a knowledge-based system software for strategically correct bid/no bid and mark-up size decisions, Automation in Construction 17(7): 864–872. http://dx.doi.org/10.1016/j.autcon.2008.02.013
- Elazouni, A. M. 2006. Classifying construction contractors using unsupervised-learning neural networks, Journal of Construction Engineering and Management 132(12): 1242–1253. http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:12(1242)
- El-Sayeg, S. M. 2009. Multi-criteria decision support model for selecting the appropriate construction management at risk firm, Construction Management and Economics 27(4): 385–398. http://dx.doi.org/10.1080/01446190902759009
- Fayek, A. 1998. Competitive bidding strategy model and software system for bid preparation, Journal of Construction Engineering and Management 124(1): 1–10. http://dx.doi.org/10.1061/(ASCE)0733-9364(1998)124:1(1)
- Friedman, L. 1956. A competitive-bidding strategy, Operations Research 4(1): 104–112.
- Goetschel, R.; Voxman, W. 1983. Topological properties of fuzzy numbers, Fuzzy Sets and Systems 10(1-3): 87–99. http://dx.doi.org/10.1016/S0165-0114(83)80107-9
- Han, S. H.; Diekmann, J. E. 2001. Making a risk-based bid decision for overseas construction projects, Construction Management and Economics 19(8): 765–776. http://dx.doi.org/10.1080/01446190110072860
- Hatush, Z.; Skitmore, M. 1997. Evaluating contractor prequalification data: selection criteria and project success factors, Construction Management and Economics 15(2): 129–147. http://dx.doi.org/10.1080/01446199700000002
- Jaselskis, E. J.; Russell, J. S. 1991. An efficiently structured approach for selection of most promising construction contractors, Project Management Journal 12(4): 31–39.
- Jennings, P.; Holt, G. D. 1998. Prequalification and multi-criteria selection: a measure of contractors’ opinions, Construction Management and Economics 16(6): 651–660. http://dx.doi.org/10.1080/014461998371944
- Kaufmann, A.; Gupta, M. M. 1991. Introduction to fuzzy arithmetic theory and application. New York: Van Nostrand Reinhold.
- Klir, G. J.; Folger, T. A. 1988. Fuzzy sets, uncertainty and information. Englewood Cliffs, N.J.: Prentice-Hall.
- Kosecki, A.; Plebankiewicz, E. 2000. Factors influencing bid decisions of Polish construction firms, in Conference on Processes of construction, Gliwice-Kokotek, Poland, 93–100.
- Lam, K. C.; Hu, T.; Ng, S. T. 2005. Using the principal component analysis method as a tool in contractor pre-qualification, Construction Management and Economics 23(7): 673–684. http://dx.doi.org/10.1080/01446190500041263
- Lam, K. C.; Hu, T.; Ng, S. T.; Skitmore, M.; Cheung, S. O. 2001. A fuzzy neural network approach for contractor prequalification, Construction Management and Economics 19(2): 175–188. http://dx.doi.org/10.1080/01446190150505108
- Leśniak, A.; Plebankiewicz, E. 2013. The modeling of the decision-making process concerning participation in the construction bidding, Journal of Management in Engineering. http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000237
- Li, H.; Love, P. E. D. 1999. Combining rule-based expert systems and artificial neural networks for mark-up estimation, Construction Management and Economics 17(2): 169–176. http://dx.doi.org/10.1080/014461999371664
- Lin, C. T.; Chen, Y. T. 2004. Bid/no-bid decision-making – a fuzzy linguistic approach, International Journal of Project Management 22(7): 585–593. http://dx.doi.org/10.1016/j.ijproman.2004.01.005
- Lowe, D. J.; Parvar, J. 2004. A logistic regression approach to modelling the contractor's decision to bid, Construction Management and Economics 22(6): 643–653. http://dx.doi.org/10.1080/01446190310001649056
- Mitkus, S.; Trinkūnienė, E. 2008. Reasoned decisions in construction contracts evaluation, Technological and Economic Development of Economy 14(3): 402–416. http://dx.doi.org/10.3846/1392-8619.2008.14.402-416
- Nguyen, V. U. 1985. Tender evaluation by fuzzy sets, Journal of Construction Engineering and Management 111(3): 231–243. http://dx.doi.org/10.1061/(ASCE)0733-9364(1985)111:3(231)
- Plebankiewicz, E. 2009. Contractor prequalification model using fuzzy sets, Journal of Civil Engineering and Management 15(4): 377–385. http://dx.doi.org/10.3846/1392-3730.2009.15.377-385
- Plebankiewicz, E. 2010. Construction contractor pre-qualification from Polish clients’ perspective, Journal of Civil Engineering and Management 16(1): 57–64. http://dx.doi.org/10.3846/jcem.2010.05
- Plebankiewicz, E.; Leśniak, A. 2011. Ocena i wybór wykonawcy robót budowlanych przez inwestorów publicznych [Evaluation and choice of building contractors by public investors], Zeszyty Naukowe Politechniki Rzeszowskiej, 265–272.
- Plebankiewicz, E.; Leśniak, A. 2013. Overhead costs and profit calculation by Polish contractors, Technological and Economic Development of Economy 19(1): 141–161.
- Radziszewska-Zielina, E. 2011. Fuzzy control of the partnering relations of a construction enterprise, Journal of Civil Engineering and Management 17(1): 5–15. http://dx.doi.org/10.3846/13923730.2011.554172
- Saaty, T. L. 1977. A scaling method for priorities in hierarchical structures, Journal of Mathematical Psychology 15(3): 234–281. http://dx.doi.org/10.1016/0022-2496(77)90033-5
- Shash, A. A. 1993. Factors considered in tendering decisions by top UK contractors, Construction Management and Economics 11(2): 111–118. http://dx.doi.org/10.1080/01446199300000004
- Singh, D.; Tiong, R. L. K. 2005. A fuzzy decision frame-work for contractor selection, Journal of Construction Engineering and Management 131(1): 62–70. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:1(62)
- Wanous, M.; Boussabaine, A. H.; Lewis, J. 2000. To bid or not to bid: a parametric solution, Construction Management and Economics 18(4): 457–466. http://dx.doi.org/10.1080/01446190050024879
- Wanous, M.; Boussabaine, A. H.; Lewis, J. 2003. A neural network bid/no bid model: the case for contractors in Syria, Construction Management and Economics 21(7): 737–744. http://dx.doi.org/10.1080/0144619032000093323