REFERENCES
- corp 2011a. Australian Economic Indicators, March 2011. Available at: http://www.abs.gov.au/AUS-STATS/[email protected]/DetailsPage/1350.0Mar%20 2011?OpenDocument [accessed 28 February 2011].
- corp 2011b. 8731.0 – Building Approvals, Australia, August 2011. Available at: http://www.abs.gov.au/ausstats/[email protected]/mf/8731.0 [accessed 4 October 2011].
- Agarwal, M.; Walsh, S.; Wang, J.; Whalley, J.; yan, C. 2013. Expected worsening or improving financial instability and the 2008 financial crisis, The North American Journal of Economics and Finance 26: 92–105. http://dx.doi.org/10.1016/j.najef.2013.07.002 doi: 10.1016/j.najef.2013.07.002
- Aragón-Correa, J. A.; Hurtado-Torres, N.; Sharma, S.; García-Morales, V. J. 2008. Environmental strategy and performance in small firms: a resource-based perspective, Journal of Environmental Management 86(1): 88–103. http://dx.doi.org/10.1016/j.jenvman.2006.11.022 doi: 10.1016/j.jenvman.2006.11.022
- Bakar, A. H. A.; yusof, M. N.; Awang, A.; Adamy, A. 2011. Survival strategies of construction companies in Malaysia during two periods of recession, International Journal of Academic Research 3(4): 481–486.
- Bassioni, H. A.; Hassan, T. M.; Price, A. D. F. 2008. Evaluation and analysis of criteria and sub-criteria of a construction excellence model, Engineering, Construction and Architectural Management 15(1): 21–41. http://dx.doi.org/10.1108/09699980810842043 doi: 10.1108/09699980810842043
- Betts, M.; Ofori, G. 1992. Strategic planning for competitive advantage in construction, Construction Management and Economics 10(6): 511–532. http://dx.doi.org/10.1080/01446199200000049 doi: 10.1080/01446199200000049
- Blismas, N. G.; Dainty, A. R. J. 2003. Computer-aided qualitative data analysis: panacea or paradox?, Building Research & Information 31(6): 455–463. http://dx.doi.org/10.1080/0961321031000108816 doi: 10.1080/0961321031000108816
- Brandenburg, S. G.; Haas, C. T.; Byrom, K. 2006. Strategic management of human resources in construction, Journal of Management in Engineering 22(2): 89–96. http://dx.doi.org/10.1061/(ASCE)0742-597X(2006)22:2(89) doi: 10.1061/(ASCE)0742-597X(2006)22:2(89)
- Bryde, D. J.; Volm, J. M. 2009. Perceptions of owners in German construction projects: congruence with project risk theory, Construction Management and Economics 27(11): 1059–1071. http://dx.doi.org/10.1080/01446190903222403 doi: 10.1080/01446190903222403
- Carrillo, P.; Heavey, I. 2000. UK contractors’ acquisitions strategy for Central and Eastern Europe, Engineering, Construction and Architectural Management 7(3): 322–328.
- Chan, J. K. W.; Tam, C. M.; Cheung, R. K. C. 2005. Construction firms at the crossroads in Hong Kong: going insolvency or seeking opportunity; Engineering, Construction and Architectural Management 12(2): 111–124. http://dx.doi.org/10.1108/09699980510584476 doi: 10.1108/09699980510584476
- Chen, L.; Fong, P. S. 2012. Visualizing evolution of knowledge management capability in construction firms, Journal of Construction Engineering and Management 139(7): 839–851. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000649 doi: 10.1061/(ASCE)CO.1943-7862.0000649
- Chiang, Y. H.; Cheng, E. W. L. 2011. Revealing bank lending decisions for contractors in Hong Kong, International Journal of Project Management 29(2): 137–145. http://dx.doi.org/10.1016/j.ijproman.2010.02.003 doi: 10.1016/j.ijproman.2010.02.003
- Chinowsky, P. S.; Meredith, J. E. 2000. Strategic management in construction, Journal of Construction Engineering and Management 126(1): 1–9. http://dx.doi.org/10.1061/(ASCE)0733-9364(2000)126:1(1) doi: 10.1061/(ASCE)0733-9364(2000)126:1(1)
- Chor, D.; Manova, K. 2012. Off the cliff and back? Credit conditions and international trade during the global financial crisis, Journal of International Economics 87(1): 117–133. http://dx.doi.org/10.1016/j.jinteco.2011.04.001 doi: 10.1016/j.jinteco.2011.04.001
- CIOB 2009. The impact of the global financial crisis on the construction industry. January 2009.
- Corden, W. M. 2012. Global imbalances and the paradox of thrift, Oxford Review of Economic Policy 28(3): 431–443. http://dx.doi.org/10.1093/oxrep/grs027 doi: 10.1093/oxrep/grs027
- Crotty, J. 2009. Structural causes of the global financial crisis: a critical assessment of the new financial architecture, Cambridge Journal of Economics 33: 563–580. http://dx.doi.org/10.1093/cje/bep023 doi: 10.1093/cje/bep023
- Dainty, A. R. J.; Bagilhole, B. M.; Neale, R. H. 2000. Computer aided analysis of qualitative data in construction management research, Building Research & Information 28(4): 226–233. http://dx.doi.org/10.1080/09613210050073689 doi: 10.1080/09613210050073689
- Dainty, A. R. J.; Bryman, A.; Price, A. D. F.; Greasley, K.; Soetanto, R.; King, N. 2005. Project affinity: the role of emotional attachment in construction projects, Construction Management and Economics 23(3): 241–244. http://dx.doi.org/10.1080/01446190500040596 doi: 10.1080/01446190500040596
- Fratzscher, M. 2012. Capital flows, push versus pull factors and the global financial crisis, Journal of International Economics 88(2): 341–356. http://dx.doi.org/10.1016/j.jinteco.2012.05.003 doi: 10.1016/j.jinteco.2012.05.003
- Gendron, Y. 2013. Learning from mistakes: can the Global Financial Crisis translate into social progress?, Journal of Sustainable Finance & Investment 3(4): 333–343. http://dx.doi.org/10.1080/20430795.2013.823854 doi: 10.1080/20430795.2013.823854
- Ghemawat, P. 2002. Competition and business strategy in historical perspective, Business History Review 76(1): 37–74. http://dx.doi.org/10.2307/4127751 doi: 10.2307/4127751
- Gibson, G. E.; Davis-Blake, A.; Dickson, K.; Mentel, B. 2003. Workforce demographics among engineering professionals – crisis ahead, ASCE Journal of Management in Engineering 19(4): 173–182. http://dx.doi.org/10.1061/(ASCE)0742-597X(2003)19:4(173) doi: 10.1061/(ASCE)0742-597X(2003)19:4(173)
- Grove, R. W. 1988. An analysis of the constant comparative method, Qualitative Studies in Education 1(3): 273– 279. http://dx.doi.org/10.1080/0951839900030105a doi: 10.1080/0951839900030105a
- HIA 2010. HIA-Cordell Information Construction 100 2009/10. October 2010. HIA Economics Group.
- Holt, G. D.; Edwards, D. J. 2012. Innovation or business survival? A preliminary, qualitative study of UK construction plant supply chains, Construction Innovation: Information, Process, Management 12(1): 99–122. doi: 10.1108/14714171211197526
- Holt, G. D.; Edwards, D. J. 2013. Analysis of United Kingdom off-highway construction machinery market and its consumers using new-sales data, Journal of Construction Engineering and Management 139(5): 529–537. http://dx.doi.org/10.1080/0951839900030105a doi: 10.1061/(ASCE)CO.1943-7862.0000584
- Horta, I. M.; Camanho, A. S.; Moreira da Costa, J. 2012. Performance assessment of construction companies: a study of factors promoting financial soundness and innovation in the industry, International Journal of Production Economics 137(1): 84–93. http://dx.doi.org/10.1016/j.ijpe.2012.01.015 doi: 10.1016/j.ijpe.2012.01.015
- ILO 2008. ILO says global financial crisis to increase unemployment by 20 million. The International Labour Office. Available at: http://www.ilo.org/global/about-the-ilo/press-and-media-centre/press-releases/lang--en/WCMS_099529 [accessed 29 August 2010].
- IMF 2010. A Policy-Driven, Multispeed Recovery, World Economic Outlook Update. 26 January 2011. International Monetary Fund.
- Jin, Z.; Deng, F.; Li, H.; Skitmore, M. 2013. A practical framework for measuring the performance of international construction firms, Journal of Construction Engineering and Management 139(9): 1154–1167. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000718 doi: 10.1061/(ASCE)CO.1943-7862.0000718
- Jung, W.; Han, S. H.; Koo, B.; Jang, W. 2011. Which strategies are more effective for international contractors during boom and recession periods?, Journal of Management in Engineering 28(3): 281–290. http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000087 doi: 10.1061/(ASCE)ME.1943-5479.0000087
- Kamin, S. B.; DeMarco, L. P. 2012. How did a domestic housing slump turn into a global financial crisis?, Journal of International Money and Finance 31(1): 10–41. http://dx.doi.org/10.1016/j.jimonfin.2011.11.003 doi: 10.1016/j.jimonfin.2011.11.003
- Kennedy, S. 2009. Australia's response to the global financial crisis: a speech to the Australia Israel Leadership Forum, 24 June 2009, Australian Treasury, Canberra.
- Korkmaz, S.; Messner, J. I. 2008. Competitive positioning and continuity of construction firms in international markets, Journal of Management in Engineering 24(4): 207–216. http://dx.doi.org/10.1061/(ASCE)0742-597X(2008)24:4(207) doi: 10.1061/(ASCE)0742-597X(2008)24:4(207)
- Lim, B. T. H.; Oo, B. L.; Ling, F. 2010. The survival strategies of Singapore contractors in prolonged recession, Engineering Construction and Architectural Management 17(4): 387–403. http://dx.doi.org/10.1108/09699981011056583 doi: 10.1108/09699981011056583
- Lin, J. Y.; Treichel, V. 2012. The unexpected global financial crisis: researching its root causes: Policy Research Working Paper 5937. The World Bank.
- Ling, F.; Lim, S. H. 2010. Improving export performance of contractors from China, Engineering, Construction and Architectural Management 17(6): 581–597. http://dx.doi.org/10.1108/09699981011090206 doi: 10.1108/09699981011090206
- Loosemore, M.; Dainty, A. R. T.; Lingard, H. 2003. Human resource management in construction projects. London: Spon.
- Lu, W.; Ye, K.; Flanagan, R.; Jewell, C. 2014. nexus between contracting and construction professional service businesses: empirical evidence from international market, Journal of Construction Engineering and Management 140(2), 04013049. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000802 doi: 10.1061/(ASCE)CO.1943-7862.0000802
- Lu, Y.; Cui, Q.; Le, Y. 2013. Turning green to gold in the construction industry: fable or fact?, Journal of Construction Engineering and Management, 139(8): 1026–1036. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000676 doi: 10.1061/(ASCE)CO.1943-7862.0000676
- Manase, D. 2010. A review of the development and formulation of business strategy in the UK construction industry, in The Construction, Building and Real Estate Research Conference of the Royal Institution of Chartered Surveyors, 2–3 September 2010, Dauphine Université, Paris.
- MBA 2010. The national survey of building and construction – December quarter 2010. Master Builders Association.
- McGrath-Champ, S.; Rosewarne, S. 2009. Organizational change in Australian building and construction: rethinking a unilinear ‘leaning’ discourse, Construction Management and Economics 27(11): 1111–1128. http://dx.doi.org/10.1080/01446190903236361 doi: 10.1080/01446190903236361
- Ng, S. T.; Fan, R. Y. C.; Wong, J. M. W.; Chan, A. P. C.; Chiang, Y. H.; Lam, Patrick T. I.; Kumaraswamy, M. 2009. Coping with structural change in construction: experiences gained from advanced economies, Construction Management and Economics 27(2): 165–180. http://dx.doi.org/10.1080/01446190802699040 doi: 10.1080/01446190802699040
- Ofori, G.; Chan, S. L. 2000. Growth paths of construction enterprises in Singapore, 1980–98, Engineering, Construction and Architectural Management 7(3): 307–321.
- Oo, B. L.; Drew, D. S.; Lo, H. P. 2008. A comparison of contractors’ decision to bid behaviour according to different market environments, International Journal of Project Management 26(4): 439–447. http://dx.doi.org/10.1016/j.ijproman.2007.06.001 doi: 10.1016/j.ijproman.2007.06.001
- Oyedele, L. O. 2012. Analysis of architects’ demotivating factors in design firms, International Journal of Project Management 31(3): 342–354. http://dx.doi.org/10.1016/j.ijproman.2012.11.009 doi: 10.1016/j.ijproman.2012.11.009
- Rose, A. K.; Spiegel, M. M. 2011. Cross-country causes and consequences of the crisis: an update, European Economic Review 55(3): 309–324. http://dx.doi.org/10.1016/j.ijproman.2012.11.009 doi: 10.1016/j.euroecorev.2010.12.006
- Ryan, G. W.; Bernard, H. R. 2000. Data management and analysis methods, in n. K. Denzin, y. S. Lincoln (Eds.). Handbook of qualitative research. 2nd ed. Thousand Oaks, CA: Sage.
- Teerajetgul, W.; Chareonngam, C. 2008. Tacit knowledge utilization in Thai construction projects, Journal of Knowledge Management 12(1): 164–74. http://dx.doi.org/10.1016/j.ijproman.2012.11.009 doi: 10.1108/13673270810852467
- The Australian 2010. Lend Lease builds on %percnt1bn Valemus acquisition. Available at: http://www.theaustralian.com.au/archive/business-old/lend-lease-builds-on-1bn-valemus-acquisition/story-e6frg96x-1225974660993 [accessed March 2011].
- Ulubeyli, S.; Kazaz, A. 2009. A multiple criteria decision‐making approach to the selection of concrete pumps, Journal of Civil Engineering and Management 15(4): 369–376. http://dx.doi.org/10.3846/1392-3730.2009.15.369-376 doi: 10.3846/1392-3730.2009.15.369-376
- Waara, F. 2008. Mitigating contractual hazards in public procurement: a study of Swedish local authorities, Construction Management and Economics 26(2): 137–145. http://dx.doi.org/10.1080/01446190701793696 doi: 10.1080/01446190701793696
- Wong, J. M. W.; Ng, T.; Chan, A. P. C. 2010. Strategic planning for the sustainable development of the construction industry in Hong Kong, Habitat International 34(2): 256–253. http://dx.doi.org/10.1016/j.habitatint.2009.10.002 doi: 10.1016/j.habitatint.2009.10.002