References
- Aghdaie, M. H.; Hashemkhani Zolfani, S.; Zavadskas, E. K. 2013. Decision making in machine tool selection: An integrated approach with SWARA and COPRAS-G methods, Inzinerine Ekonomika – Engineering Economics 24(1): 5–17.
- Antucheviciene, J.; Zakarevicius, A.; Zavadskas, E. K. 2011. Measuring congruence ranking results applying particular MCDM methods, Informatica 22(3): 319–338.
- Arteta, B. M.; Giachetti, R. E. 2004. A measure of agility as the complexity of the enterprise system, Robotics and Computer-Integrated Manufacturing 20(6): 495–503. http://dx.doi.org/10.1016/j.rcim.2004.05.008 .
- Amin, S. H.; Razmi, J. 2009. An integrated fuzzy model for supplier management: A case study of ISP selection and evaluation, Expert Systems with Applications 36: 8639–8648. http://dx.doi.org/10.1016/j.eswa.2008.10.012 .
- Buyukozkan, G.; Cifci, G. 2011. A novel fuzzy multi-criteria decision framework for sustainable supplier selection with incomplete information, Computers in Industry 62(2): 164–174. http://dx.doi.org/10.1016/j.compind.2010.10.009 .
- Cagliano, R.; Caniato, F.; Spina, G. 2004. Lean, Agile and traditional supply: How do they impact manufacturing performance?, Journal of Purchasing and Supply Management 10: 151–164. http://dx.doi.org/10.1016/j.pursup.2004.11.001 .
- Fouladgar, M. M.; Yazdani-Chamzini, A.; Zavadskas, E. K.; Yakhchali, S. H.; Ghasempourabadi, M. H. 2012. Project portfolio selection using fuzzy AHP and VIKOR techniques, Transformations in Business & Economics 11(1–25): 213–231.
- Ginevicius, R. 2011. A new determining method for the criteria weights in multi-criteria evaluation, International Journal of Information Technology and Decision Making 10(6): 1067–1095. http://dx.doi.org/10.1142/S0219622011004713 .
- Grigoroudis, E.; Siskos, Y. 2002. Preference disaggregation for measuring and analysing customer satisfaction: the MUSA method, European Journal of Operational Research 143(1): 148–170. http://dx.doi.org/10.1016/S0377-2217(01)00332-0 .
- Hashemkhani Zolfani, S.; Chen, I. S.; Rezaeiniya, N.; Tamosaitiene, J. 2012. A hybrid MCDM model encompassing AHP and COPRAS-G method for selecting company supplier in Iran, Technological and Economic Development of Economy 18(3): 529–543. http://dx.doi.org/10.3846/20294913.2012.709472 .
- Hashemkhani Zolfani, S.; Zavadskas, E. K.; Turskis, Z. 2013a. Design of products with both international and local perspectives based on Yin-Yang balance theory and SWARA method, Ekonomska Istraživanja – Economic Research 26(2): 153–166.
- Hashemkhani Zolfani, S.; Esfahani, M. H.; Bitarafan, M.; Zavadskas, E. K.; Lale Arefi, S. 2013b. Developing a new hybrid MCDM method for selection of the optimal alternative of mechanical longitudinal ventilation of tunnel pollutants during automobile accidents, Transport 28(1): 89–96. http://dx.doi.org/10.3846/16484142.2013.782567 .
- Hashemkhani Zolfani, S.; Farrokhzad, M.; Turskis, Z. 2013c. Investigating on successful factors of online games based on explorer, E & M: Ekonomie a Management 16(2): 161–169.
- Hwang, C. L.; Yoon, K. 1981. Multiple attribute decision making methods and applications. Heidelberg: Springer Verlag. http://dx.doi.org/10.1007/978-3-642-48318-9
- Keršulienė, V.; Turskis, Z. 2011. Integrated fuzzy multiple criteria decision making model for architect selection, Technological and Economic Development of Economy 17(4): 645–666. http://dx.doi.org/10.3846/20294913.2011.635718 .
- Keršulienė, V.; Zavadskas, E. K.; Turskis, Z. 2010. Selection of rational dispute resolution method by applying new step-wise weight assessment ratio analysis (SWARA), Journal of Business Economics and Management 11(2): 243–258. http://dx.doi.org/10.3846/jbem.2010.12 .
- Li, X.; Wang, Q. 2007. Coordination mechanisms of supply chain systems, European Journal of Operational Research 179: 1–16. http://dx.doi.org/10.1016/j.ejor.2006.06.023 .
- Lin, T.; Chiu, H.; Tseung, Y. H. 2006. Agility evaluation using fuzzy logic, International Journal of Production Economic 101(2): 353–368. http://dx.doi.org/10.1016/j.ijpe.2005.01.011 .
- Liu, C. H.; Tzeng, G. H.; Lee, M. H. 2012. Improving tourism policy implementation – The use of hybrid MCDM models, Tourism Management 33(2): 413–426. http://dx.doi.org/10.1016/j.tourman.2011.05.002 .
- Luo, X.; Wu, C.; Rosenberg, D.; Barnes, D. 2009. Supplier selection in agile supply chains: An information-processing model and an illustration, Journal of Purchasing and Supply Management 15: 249–262. http://dx.doi.org/10.1016/j.pursup.2009.05.004 .
- Opricovic, S. 1998. Multi criteria optimization of civil engineering systems, Faculty of Civil Engineering 37(12): 1379–1383.
- Opricovic, S.; Tzeng, G. H. 2002. Multi-criteria planning of post earthquake sustainable reconstruction, Computer-Aided Civil and Infrastructure Engineering 17: 211–220. http://dx.doi.org/10.1111/1467-8667.00269 .
- Opricovic, S.; Tzeng, G. H. 2004. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS, European Journal of Operational Research 156(2): 445–455. http://dx.doi.org/10.1016/S0377-2217(03)00020-1 .
- Razmi, J.; Rafiei, H.; Hashemi, M. 2009. Designing a decision support system to evaluate and select suppliers using fuzzy analytic network process, Computers and Industrial Engineering 57: 1282–1290. http://dx.doi.org/10.1016/j.cie.2009.06.008 .
- Roy, B. 1968. Classementet Choix en Presence de Points de vue Multiples (la method Electre), Revue Francaised, Informatique et de Recherche Operationnelle 8(1): 57–75.
- Sari, B.; Sen, T.; Kilic, S. E. 2008. AHP model for the selection of partner companies in virtual enterprises, International Journal of Advanced Manufacturing Technology 38(3–4): 367–376. http://dx.doi.org/10.1007/s00170-007-1097-6 .
- Sarkar, A.; Mohapatra, P. K. J. 2006. Evaluation of supplier capability and performance: a method for supply base reduction, Journal of Purchasing and Supply Management 12(3): 148–163. http://dx.doi.org/10.1016/j.pursup.2006.08.003 .
- Shannon, C. E. 1948. The mathematical theory of communication, Bell System Technical Journal 27: 379–423. http://dx.doi.org/10.1002/j.1538-7305.1948.tb00917.x .
- Sharifi, H.; Zhang, Z. 1999. A methodology for achieving agility in manufacturing organizations: an introduction, International Journal of Production Economics 62(1–2): 7–22. http://dx.doi.org/10.1016/S0925-5273(98)00217-5 .
- Sušinskas, S.; Zavadskas, E. K.; Turskis, Z. 2011. Multiple criteria assessment of pile-columns alternatives, The Baltic Journal of Road and Bridge Engineering 6(3): 77–83. http://dx.doi.org/10.3846/bjrbe.2011.19 .
- Tam, M. C. Y.; Tummala, V. M. R. 2001. An application of the AHP in vendor selection of a telecommunications system, Omega – The International Journal of Management Science 29(2): 171–182.
- Tamošaitienė, J.; Šipalis, J.; Banaitis, A.; Gaudutis, E. 2013. Complex model for the assessment of the location of high-rise buildings in the city urban structure, International Journal of Strategic Property Management 17(1): 93–109. http://dx.doi.org/10.3846/1648715X.2013.781968 .
- Tamošaitienė, J.; Gaudutis, E. 2013. Complex assessment of structural systems used for high-rise buildings, Journal of Civil Engineering and Management 19(2): 305–317. http://dx.doi.org/10.3846/13923730.2013.772071 .
- Talluri, S.; Baker, R. C. 2002. A multi-phase mathematical programming approach for effective supply chain design, European Journal of Operational Research 141: 544–558. http://dx.doi.org/10.1016/S0377-2217(01)00277-6 .
- Tsourveloudis, N. C.; Valavanis, K. P. 2002. On the measurement of enterprise agility, Journal of Intelligent Robotic Systems 33(3): 329–342. http://dx.doi.org/10.1023/A:1015096909316 .
- Wang, Y. L.; Tzeng, G. H. 2012. Brand marketing for creating brand value based on a MCDM model combining DE MATEL with ANP and VIKOR methods, Expert Systems with Applications 39: 5600–5615. http://dx.doi.org/10.1016/j.eswa.2011.11.057 .
- Wu, H. Y.; Chen, J. K.; Chen, I. S.; Zhou, H. H. 2012. Ranking universities based on performance evaluation by a hybrid MCDM model, Measurement 45(5): 856–880. http://dx.doi.org/10.1016/j.measurement.2012.02.009 .
- Wu, C.; Barnes, D. 2011. A literature review of decision-making models and approaches for partner selection in agile supply chains, Journal of Purchasing and Supply Management 17: 256–274. http://dx.doi.org/10.1016/j.pursup.2011.09.002 .
- Wu, C.; Barnes, D.; Rosenberg, D.; Luo, X. X. 2009. An analytic network process-mixed integer multi-objective programming model for partner selection in agile supply chains, Production Planning and Control 20(3): 254–275. http://dx.doi.org/10.1080/09537280902856047 .
- Xia, W.; Wu, Z. 2007. Supplier selection with multiple criteria in volume discount environments, Omega 35: 494–504. http://dx.doi.org/10.1016/j.omega.2005.09.002 .
- Yigin, I. H.; Taşkin, H.; Cedimoglu, I. H.; Topal, B. 2007. Supplier selection: an expert system approach. Production Planning and Control 18(1): 16–24. http://dx.doi.org/10.1080/09537280600940655
- Yücenur, G. N.; Demirel, N. C. 2012. Group decision making process for insurance company selection problem with extended VIKOR method under fuzzy environment, Expert Systems with Applications 39(3): 3702–3707. http://dx.doi.org/10.1016/j.eswa.2011.09.065 .
- Zavadskas, E. K.; Kaklauskas, A. 1996. Determination of an efficient contractor by using the new method of multi criteria assessment, in Langford, D. A.; Retik, A. (Eds.). International Symposium for “The Organization and Management of Construction”. Shaping theory and practice. Vol. 2: Managing the Construction Project and Managing Risk. CIB W 65; London: E and FN SPON, 94–104.
- Zavadskas, E. K.; Turskis, Z. 2010. A new additive ratio assessment (ARAS) method in multicriteria decision-making, Technological and Economic Development of Economy 16(2): 159–172. http://dx.doi.org/10.3846/tede.2010.10 .
- Zavadskas, E. K.; Vainiunas, P.; Turskis, Z.; Tamosaitiene, J. 2012. Multiple criteria decision support system for assessment of projects managers in construction, International Journal of Information Technology and Decision Making 11(2): 501–520. http://dx.doi.org/10.1142/S0219622012400135 .
- Zavadskas, E. K.; Turskis, Z.; Tamošaitienė, J. 2011. Selection of construction enterprises management strategy based on the SWOT and multi-criteria analysis, Archives of Civil and Mechanical Engineering 11(4): 1063–1082. http://dx.doi.org/10.1016/S1644-9665(12)60096-X .
- Zavadskas, E. K.; Turskis, Z.; Ustinovichius, L.; Shevchenko, G. 2010. Attributes weights determining peculiarities in multiple attribute decision making methods, Inzinerine Ekonomika – Engineering Economics 21(1): 32–43.
- Zavadskas, E. K.; Kaklauskas, A.; Turskis, Z.; Tamosaitiene, J. 2009. Multi-attribute decision-making model by applying grey numbers, Informatica 20(2): 305–320.
- Zavadskas, E. K.; Kaklauskas, A.; Turskis, Z.; Tamosaitiene, J. 2008. Selection of the effective dwelling house walls by applying attributes values determined at intervals, Journal of Civil Engineering and Management 14(2): 85–93. http://dx.doi.org/10.3846/1392-3730.2008.14.3 .