47
Views
25
CrossRef citations to date
0
Altmetric
Original Articles

The dynamic aspects of a production scheduling problem

&
Pages 15-21 | Received 23 Oct 1978, Published online: 15 Mar 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (13)

Le Liu & Hong Zhou. (2015) Single-machine rescheduling with deterioration and learning effects against the maximum sequence disruption. International Journal of Systems Science 46:14, pages 2640-2658.
Read now
Christoph W. Pickardt & Jürgen Branke. (2012) Setup-oriented dispatching rules – a survey. International Journal of Production Research 50:20, pages 5823-5842.
Read now
Jürgen Branke & Dirk Christian Mattfeld. (2005) Anticipation and flexibility in dynamic scheduling. International Journal of Production Research 43:15, pages 3103-3129.
Read now
S. J. Mason, S. Jin & C. M. Wessels. (2004) Rescheduling strategies for minimizing total weighted tardiness in complex job shops. International Journal of Production Research 42:3, pages 613-628.
Read now
Tsung-Yuan Tseng & Rong-Kwei Li. (2000) 在需求不確定與及時化存貨生產環境下主生產排程再排程策略之硏究. Journal of the Chinese Institute of Industrial Engineers 17:6, pages 615-630.
Read now
PeiChann Chang & Ling-Huey Su. (1999) 動態零工工廠主動反應式排程修正法則之發展. Journal of the Chinese Institute of Industrial Engineers 16:3, pages 345-352.
Read now
Horng-Huei Wu & Rong-Kwei Li. (1997) 生產排程之重排程決策問題的文献探討舆分析. Journal of the Chinese Institute of Industrial Engineers 14:2, pages 147-158.
Read now
LAURAK. CHURCH & REHA UZSOY. (1992) Analysis of periodic and event-driven rescheduling policies in dynamic shops. International Journal of Computer Integrated Manufacturing 5:3, pages 153-163.
Read now
DAVIDM. DILTS. (1991) The sensitivity of set-up cost estimation on the problem of joint lot sizing and scheduling. International Journal of Production Research 29:1, pages 77-93.
Read now
MIN-FENG WANG & MATTHEW ROSENSHINE. (1983) Scheduling for a combination of made-to-stock and made-to-order jobs in a job shop. International Journal of Production Research 21:5, pages 607-616.
Read now
SUSHILK. GUPTA. (1982) n jobs and m machines job-shop problems with sequence-dependent set-up times. International Journal of Production Research 20:5, pages 643-656.
Read now
A. P. MUHLEMANN, A. G. LOCKETT & C.-K. FARN. (1982) Job shop scheduling heuristics and frequency of scheduling. International Journal of Production Research 20:2, pages 227-241.
Read now
D. DAS & W. B. DOWSLAND. (1981) A model to examine the effect of loading conditions on scheduling rules in a job shop environment. International Journal of Production Research 19:5, pages 577-587.
Read now

Articles from other publishers (12)

Jiaxin Fan, Damla Kizilay, Hande Oztop, Mehmet Fatih Tasgetiren & Liang Gao. (2019) A Variable Block Insertion Heuristic for Single Machine with Release Dates and Sequence Dependent Setup Times for Makespan Minimization. A Variable Block Insertion Heuristic for Single Machine with Release Dates and Sequence Dependent Setup Times for Makespan Minimization.
Mario C. Vélez-Gallego, Jairo Maya & Jairo R. Montoya-Torres. (2016) A beam search heuristic for scheduling a single machine with release dates and sequence dependent setup times to minimize the makespan. Computers & Operations Research 73, pages 132-140.
Crossref
Chung‐Hsing Yeh. (2005) Sequencing shop floor operations: a practical approach. Journal of Manufacturing Technology Management 16:5, pages 531-541.
Crossref
I Sabuncuoglu & M Bayız. (2000) Analysis of reactive scheduling problems in a job shop environment. European Journal of Operational Research 126:3, pages 567-586.
Crossref
Ali Allahverdi, Jatinder N.D Gupta & Tariq Aldowaisan. (1999) A review of scheduling research involving setup considerations. Omega 27:2, pages 219-239.
Crossref
Can Akkan. 1998. Beyond Manufacturing Resource Planning (MRP II). Beyond Manufacturing Resource Planning (MRP II) 255 278 .
Sidhartha R. Das & Basheer M. Khumawala. (1991) An efficient heuristic for scheduling batches of parts in a flexible flow system. International Journal of Flexible Manufacturing Systems 3:2, pages 121-147.
Crossref
R. Meenakshi Sundaram & Wen-shiom Lian. (1990) A computerized algorithm for scheduling dependent jobs with weights in a single machine. Computers & Industrial Engineering 19:1-4, pages 11-16.
Crossref
Stelios H. Zanakis, James R. Evans & Alkis A. Vazacopoulos. (1989) Heuristic methods and applications: A categorized survey. European Journal of Operational Research 43:1, pages 88-110.
Crossref
David M. Dilts & Kenneth D. Ramsing. (2007) Joint Lot Sizing and Scheduling of Multiple Items with Sequence‐Dependent Setup Costs. Decision Sciences 20:1, pages 120-133.
Crossref
R. Haupt. (1989) A survey of priority rule-based scheduling. OR Spektrum 11:1, pages 3-16.
Crossref
PJ O'Grady & C Harrison. (1988) Search based job scheduling and sequencing with setup times. Omega 16:6, pages 547-552.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.