35
Views
38
CrossRef citations to date
0
Altmetric
Original Articles

Optimal due-date assignment in a job shopFootnote

Pages 503-515 | Received 01 May 1985, Published online: 02 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (11)

Swapnil Bhalla, Erlend Alfnes & Hans-Henrik Hvolby. (2023) Tools and practices for tactical delivery date setting in engineer-to-order environments: a systematic literature review. International Journal of Production Research 61:7, pages 2339-2371.
Read now
S. Moses, H. Grant, L. Gruenwald & S. Pulat. (2004) Real-time due-date promising by build-to-order environments. International Journal of Production Research 42:20, pages 4353-4375.
Read now
SCOTTA. MOSES. (1999) Due date assignment using feedback control with reinforcement learning. IIE Transactions 31:10, pages 989-999.
Read now
STEPHENR. LAWRENCE. (1995) Estimating flowtimes and setting due-dates in complex production systems. IIE Transactions 27:5, pages 657-668.
Read now
S. T. ENNS. (1995) A dynamic forecasting model for job shop flowtime prediction and tardiness control. International Journal of Production Research 33:5, pages 1295-1312.
Read now
D. SUN & L. LIN. (1994) A dynamic job shop scheduling framework: a backward approach. International Journal of Production Research 32:4, pages 967-985.
Read now
S. T. ENNS. (1993) Job shop flowtime prediction and tardiness control using queueing analysis. International Journal of Production Research 31:9, pages 2045-2057.
Read now
T. C. E. CHENG. (1990) Analysis of material flow in a job shop with assembly operations. International Journal of Production Research 28:7, pages 1369-1383.
Read now
T. C. E. CHENG. (1988) DETERMINATION OF OPTIMAL TOTAL-WORK-CONTENT DUE-DATES FOR A SINGLE MACHINE SEQUENCING PROBLEM. Engineering Optimization 14:2, pages 121-125.
Read now
C. R. BECTOR, Y. P. GUPTA & M. C. GUPTA. (1988) Determination of an optimal common due date and optimal sequence in a single machine job shop. International Journal of Production Research 26:4, pages 613-628.
Read now

Articles from other publishers (27)

Halil Ibrahim Demir, Ozer Uygun, Ibrahim Cil, Mumtaz Ipek & Meral Sari. (2014) Process Planning and Scheduling with SLK Due-Date Assignment where Earliness, Tardiness and Due-Dates are Punished. Journal of Industrial and Intelligent Information 3:3.
Crossref
Donatella Corti, Alessandro Pozzetti & Marta Zorzini. (2006) A capacity-driven approach to establish reliable due dates in a MTO environment. International Journal of Production Economics 104:2, pages 536-554.
Crossref
H. Grant, S. Moses & D. Goldsmann. (2002) Using simulation to evaluate buffer adjustment methods in order promising. Using simulation to evaluate buffer adjustment methods in order promising.
Fred F Easton & Douglas R Moodie. (1999) Pricing and lead time decisions for make-to-order firms with contingent orders. European Journal of Operational Research 116:2, pages 305-318.
Crossref
Ming-Hung Lin & Li-Chen Fu. (1999) A new generation of evaluation tool for online design and scheduling in an advanced manufacturing system. A new generation of evaluation tool for online design and scheduling in an advanced manufacturing system.
S.T. Enns. (1998) Lead time selection and the behaviour of work flow in job shops. European Journal of Operational Research 109:1, pages 122-136.
Crossref
Linet Özdamar & Tülin Yazgaç. (1997) Capacity driven due date settings in make-to-order production systems. International Journal of Production Economics 49:1, pages 29-44.
Crossref
Chen Dewu, S. Li & Tang Guochun. (1997) Single machine scheduling with common due date assignment in a group technology environment. Mathematical and Computer Modelling 25:3, pages 81-90.
Crossref
Qi Hao, Zihou Yang, Dingwei Wang & Zheng Li. (1996) Common due-date determination and sequencing using tabu search. Computers & Operations Research 23:5, pages 409-417.
Crossref
Stephen R. Lawrence. (1994) Negotiating due-dates between customers and producers. International Journal of Production Economics 37:1, pages 127-138.
Crossref
T.C.E. Cheng. (1994) Optimal Due‐date Assignment in an Assembly Shop. International Journal of Operations & Production Management 14:2, pages 31-42.
Crossref
T. C. E. Cheng & H. G. Kahlbacher. (1993) Single-machine scheduling to minimize earliness and number of tardy jobs. Journal of Optimization Theory and Applications 77:3, pages 563-573.
Crossref
L.C. Hendry, P. Elings & D. Pegg. (1993) Production planning for an artists studio — A case study. European Journal of Operational Research 64:1, pages 12-20.
Crossref
Prabuddha De, Jay B. Ghosh & Charles E. Wells. (1992) Optimal due-date assignment and sequencing. European Journal of Operational Research 57:3, pages 323-331.
Crossref
T.C.E. Cheng. (1991) Optimal constant due-date determination and sequencing of n jobs on a single machine. International Journal of Production Economics 22:3, pages 259-261.
Crossref
T.C.E. Cheng. (1991) Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine. European Journal of Operational Research 51:3, pages 348-353.
Crossref
Prabuddha De, Jay B. Ghosh & Charles E. Wells. (2007) Optimal Delivery Time Quotation and Order Sequencing. Decision Sciences 22:2, pages 379-390.
Crossref
Farzad Mahmoodi, Kevin J. Dooley & Patrick J. Starr. (1990) An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system. Journal of Operations Management 9:4, pages 548-573.
Crossref
R Ramasesh. (1990) Dynamic job shop scheduling: A survey of simulation research. Omega 18:1, pages 43-57.
Crossref
L.C. Hendry & B.G. Kingsman. (1989) Production planning systems and their applicability to make-to-order companies. European Journal of Operational Research 40:1, pages 1-15.
Crossref
R. Haupt. (1989) A survey of priority rule-based scheduling. OR Spektrum 11:1, pages 3-16.
Crossref
T.C.E. Cheng. (1989) Optimal due-date assignment and sequencing in a single machine shop. Applied Mathematics Letters 2:1, pages 21-24.
Crossref
T.C.E. Cheng & M.C. Gupta. (1989) Survey of scheduling research involving due date determination decisions. European Journal of Operational Research 38:2, pages 156-166.
Crossref
T.C.E. Cheng. (1988) Optimal common due-date with limited completion time deviation. Computers & Operations Research 15:2, pages 91-96.
Crossref
Wing S. Chow, Sunderesh Heragu & Andrew Kusiak. 1988. Computer-Aided Production Management. Computer-Aided Production Management 135 148 .
T.C.E. Cheng. (1987) Optimal total-work-content-power due-date determination and sequencing. Computers & Mathematics with Applications 14:8, pages 579-582.
Crossref
T.C.E. Cheng. (1987) Optimal due-date determination and sequencing with random processing times. Mathematical Modelling 9:8, pages 573-576.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.