984
Views
26
CrossRef citations to date
0
Altmetric
Papers

Effects of the location-based management system on production rates and productivity

, &
Pages 608-624 | Received 16 Oct 2012, Accepted 06 Oct 2013, Published online: 05 Feb 2014

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (8)

Natalie M. Scala, Vincent Schiavone, Hylton Olivieri, Olli Seppänen, Thais da C. L. Alves, Min Liu & Ariovaldo Denis Granja. (2023) Comparative Analysis of Planning with the Critical Path Method, Last Planner System, and Location-Based Techniques in Brazil, Finland, and the United States. Engineering Management Journal 35:3, pages 237-256.
Read now
Marcello Braglia, Patrick Dallasega & Leonardo Marrazzini. (2022) Overall Construction Productivity: a new lean metric to identify construction losses and analyse their causes in Engineer-to-Order construction supply chains. Production Planning & Control 33:9-10, pages 925-942.
Read now
Joonas Lehtovaara, Olli Seppänen, Antti Peltokorpi, Pekka Kujansuu & Max Grönvall. (2021) How takt production contributes to construction production flow: a theoretical model. Construction Management and Economics 39:1, pages 73-95.
Read now
Russell Kenley. (2019) CME Forum: a response to “Construction flow index: a metric of production flow quality in construction”. Construction Management and Economics 37:2, pages 112-119.
Read now
Hylton Olivieri, Olli Seppänen & Ariovaldo Denis Granja. (2018) Improving workflow and resource usage in construction schedules through location-based management system (LBMS). Construction Management and Economics 36:2, pages 109-124.
Read now
Rafael Sacks, Olli Seppänen, Vitaliy Priven & Jonathan Savosnick. (2017) Construction flow index: a metric of production flow quality in construction. Construction Management and Economics 35:1-2, pages 45-63.
Read now
Sunil Sharma, V.K. Bansal & Raman Parti. (2016) Location-based highway construction planning using geographic information systems. International Journal of Construction Management 16:4, pages 299-314.
Read now

Articles from other publishers (18)

Moslem Sheikhkhoshkar, Hind Bril El-HaouziAlexis AubryFarook Hamzeh. (2023) Functionality as a Key Concept for Integrated Project Planning and Scheduling Methods. Journal of Construction Engineering and Management 149:7.
Crossref
Ningshuang Zeng, Xuling Ye, Yan Liu & Markus König. (2023) BIM-enabled Kanban system in construction logistics for real-time demand reporting and pull replenishment. Engineering, Construction and Architectural Management.
Crossref
Adel Francis & Edmond Miresco. 2023. Advances in Information Technology in Civil and Building Engineering. Advances in Information Technology in Civil and Building Engineering 53 61 .
Manuel Jungmann, Lucian Ungureanu, Timo Hartmann, Hector Posada & Rolando Chacon. (2022) Real-Time Activity Duration Extraction of Crane Works for Data-Driven Discrete Event Simulation. Real-Time Activity Duration Extraction of Crane Works for Data-Driven Discrete Event Simulation.
Malek Ghanem, Farook Hamzeh, Olli Seppänen, Lynn Shehab & Emile Zankoul. (2022) Pull planning versus push planning: Investigating impacts on crew performance from a location-based perspective. Frontiers in Built Environment 8.
Crossref
Alexander Schlachter, Mads Holten Rasmussen & Jan Karlshøj. (2022) Using Linked Building Data for managing temporary construction items. Automation in Construction 139, pages 104258.
Crossref
Bin Yang, Miaosi Dong, Congjun Wang, Boda Liu, Zhichen Wang & Binghan Zhang. (2021) IFC-Based 4D Construction Management Information Model of Prefabricated Buildings and Its Application in Graph Database. Applied Sciences 11:16, pages 7270.
Crossref
Jacob J. Lin & Mani Golparvar-Fard. (2021) Visual and Virtual Production Management System for Proactive Project Controls. Journal of Construction Engineering and Management 147:7.
Crossref
Jianyu Zhao, Ergo Pikas, Olli Seppänen & Antti Peltokorpi. (2021) Using Real-Time Indoor Resource Positioning to Track the Progress of Tasks in Construction Sites. Frontiers in Built Environment 7.
Crossref
Fabian Ardila & Adel Francis. (2020) Spatiotemporal Planning of Construction Projects: A Literature Review and Assessment of the State of the Art. Frontiers in Built Environment 6.
Crossref
Adel Francis. (2020) Chronographical Site-Spatial-Temporal Modeling of Construction Operations. Frontiers in Built Environment 6.
Crossref
Felix Schulze & Patrick Dallasega. (2020) Industry 4.0 Concepts and Lean Methods Mitigating Traditional Losses in Engineer-to-Order Manufacturing with Subsequent Assembly On-Site: A Framework. Procedia Manufacturing 51, pages 1363-1370.
Crossref
Jianyu Zhao, Olli Seppänen, Antti Peltokorpi, Behnam Badihi & Hylton Olivieri. (2019) Real-time resource tracking for analyzing value-adding time in construction. Automation in Construction 104, pages 52-65.
Crossref
Julia Ratajczak, Michael Riedl & Dominik Matt. (2019) BIM-based and AR Application Combined with Location-Based Management System for the Improvement of the Construction Performance. Buildings 9:5, pages 118.
Crossref
Alejandra M. Carmona, Ana I. Chaparro, Ricardo Velásquez, Juan Botero-Valencia, Luis Castano-Londono, David Marquez-Viloria & Ana M. Mesa. 2019. Advances in Informatics and Computing in Civil and Construction Engineering. Advances in Informatics and Computing in Civil and Construction Engineering 637 644 .
Olli Seppänen. 2018. Lean Construction – Das Managementhandbuch. Lean Construction – Das Managementhandbuch 179 198 .
Hylton Olivieri, Ariovaldo Denis Granja & Flávio Augusto Picchi. (2016) Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado. Ambiente Construído 16:1, pages 265-283.
Crossref
José Luis Ponz‐Tienda, Eugenio Pellicer, Javier Benlloch‐Marco & Carlos Andrés‐Romano. (2015) The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations. Computer-Aided Civil and Infrastructure Engineering 30:11, pages 872-891.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.