318
Views
66
CrossRef citations to date
0
Altmetric
ORIGINAL ARTICLES

Design of exponential control charts using a sequential sampling scheme

, &
Pages 1105-1116 | Received 01 Apr 2005, Accepted 01 Dec 2005, Published online: 23 Nov 2006

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (30)

Nirpeksh Kumar, Athanasios C. Rakitzis, Subha Chakraborti & Tribhuvan Singh. (2024) Statistical design of ATS-unbiased charts with runs rules for monitoring exponential time between events. Communications in Statistics - Theory and Methods 53:3, pages 815-833.
Read now
Eralp Dogu & Muhammad Noor-ul-Amin. (2023) Monitoring exponentially distributed time between events data: self-starting perspective. Communications in Statistics - Simulation and Computation 52:3, pages 1104-1118.
Read now
XueLong Hu, YuLong Qiao, PanPan Zhou, JianLan Zhong & Shu Wu. (2023) Modified one-sided EWMA charts for monitoring time between events. Communications in Statistics - Simulation and Computation 52:3, pages 1041-1056.
Read now
YuLong Qiao, JinSheng Sun, Philippe Castagliola & XueLong Hu. (2022) Optimal design of one-sided exponential EWMA charts based on median run length and expected median run length. Communications in Statistics - Theory and Methods 51:9, pages 2887-2907.
Read now
Nirpeksh Kumar, Subha Chakraborti & Philippe Castagliola. (2022) Phase II exponential charts for monitoring time between events data: performance analysis using exact conditional average time to signal distribution. Journal of Statistical Computation and Simulation 92:7, pages 1457-1486.
Read now
Fausto Galetto. (2022) Minitab T charts and quality decisions. Journal of Statistics and Management Systems 25:2, pages 315-345.
Read now
XueLong Hu, Philippe Castagliola, JianLan Zhong, AnAn Tang & YuLong Qiao. (2021) On the performance of the adaptive EWMA chart for monitoring time between events. Journal of Statistical Computation and Simulation 91:6, pages 1175-1211.
Read now
Sajid Ali. (2020) A predictive Bayesian approach to EWMA and CUSUM charts for time-between-events monitoring. Journal of Statistical Computation and Simulation 90:16, pages 3025-3050.
Read now
Nirpeksh Kumar. (2020) Conditional analysis of Phase II exponential chart for monitoring times to an event. Quality Technology & Quantitative Management 17:3, pages 285-306.
Read now
Saddam Akber Abbasi, Qurat-Ul-Ain Khaliq, M. Hafidz Omar & Muhammad Riaz. (2020) On designing a sequential based EWMA structure for efficient process monitoring. Journal of Taibah University for Science 14:1, pages 177-191.
Read now
Yuan Cheng, Lirong Sun & Baocai Guo. (2018) Phase II synthetic exponential charts and effect of parameter estimation. Quality Technology & Quantitative Management 15:1, pages 125-142.
Read now
Manuel Cabral Morais. (2017) ARL-unbiased geometric and CCC control charts. Sequential Analysis 36:4, pages 513-527.
Read now
Cai Wen Zhang, Zhisheng Ye & Min Xie. (2017) Monitoring the shape parameter of a Weibull renewal process. IISE Transactions 49:8, pages 800-813.
Read now
N. Kumar, S. Chakraborti & A. C. Rakitzis. (2017) Improved Shewhart-Type Charts for Monitoring Times Between Events. Journal of Quality Technology 49:3, pages 278-296.
Read now
Muhammad Aslam, Nasrullah Khan & Chi-Hyuck Jun. (2017) Designing of a control chart using belief statistic for exponential distribution. Communications in Statistics - Simulation and Computation 46:5, pages 3781-3793.
Read now
Nirpeksh Kumar & Subha Chakraborti. (2017) Bayesian Monitoring of Times Between Events: The Shewhart t-Chart. Journal of Quality Technology 49:2, pages 136-154.
Read now
Nirpeksh Kumar & Chien-Tai Lin. (2017) Testing for multiple upper and lower outliers in an exponential sample. Journal of Statistical Computation and Simulation 87:5, pages 870-881.
Read now
Baocai Guo & Bing Xing Wang. (2016) The variable sampling interval S2 chart with known or unknown in-control variance. International Journal of Production Research 54:11, pages 3365-3379.
Read now
Athanasios C. Rakitzis. (2016) Monitoring exponential data using two-sided control charts with runs rules. Journal of Statistical Computation and Simulation 86:1, pages 149-159.
Read now
Jun Yang, Huan Yu, Yuan Cheng & Min Xie. (2015) Design of exponential control charts based on average time to signal using a sequential sampling scheme. International Journal of Production Research 53:7, pages 2131-2145.
Read now
Baocai Guo, Bing Xing Wang & Min Xie. (2014) ARL-unbiased control charts for the monitoring of exponentially distributed characteristics based on type-II censored samples. Journal of Statistical Computation and Simulation 84:12, pages 2734-2747.
Read now
Haydar Demirhan & Canan Hamurkaroglu. (2014) Bayesian X̄ control limits for exponentially distributed measurements. Journal of Statistical Computation and Simulation 84:3, pages 628-643.
Read now
Eduardo Santiago & Joel Smith. (2013) Control Charts Based on the Exponential Distribution: Adapting Runs Rules for the t Chart. Quality Engineering 25:2, pages 85-96.
Read now
Cai Wen Zhang, Min Xie & Tongdan Jin. (2012) An improved self-starting cumulative count of conforming chart for monitoring high-quality processes under group inspection. International Journal of Production Research 50:23, pages 7026-7043.
Read now
Chuen-Sheng Cheng & Pei-Wen Chen. (2011) An ARL-unbiased design of time-between-events control charts with runs rules. Journal of Statistical Computation and Simulation 81:7, pages 857-871.
Read now
Pei-Wen Chen & Chuen-Sheng Cheng. (2011) On Statistical Design of the Cumulative Quantity Control Chart for Monitoring High Yield Processes. Communications in Statistics - Theory and Methods 40:11, pages 1911-1928.
Read now
S. Chakraborti, S. W. Human & M. A. Graham. (2008) Phase I Statistical Process Control Charts: An Overview and Some Results. Quality Engineering 21:1, pages 52-62.
Read now
C. W. Zhang, M. Xie, J. Y. Liu & T. N. Goh. (2007) A control chart for the Gamma distribution as a model of time between events. International Journal of Production Research 45:23, pages 5649-5666.
Read now
Thomas G. Yeung, C. Richard Cassady & Kellie Schneider. (2007) Simultaneous optimization of [Xbar] control chart and age-based preventive maintenance policies under an economic objective. IIE Transactions 40:2, pages 147-159.
Read now

Articles from other publishers (36)

Subhabrata Chakraborti, Nirpeksh Kumar, Athanasios C. Rakitzis & Ross S. Sparks. 2014. Wiley StatsRef: Statistics Reference Online. Wiley StatsRef: Statistics Reference Online 1 13 .
Yu-Ching Chang. (2022) A design parameter-free geometric Kullback-Leibler information control chart for monitoring Bernoulli processes. Computers & Industrial Engineering 169, pages 108150.
Crossref
FuPeng Xie, Philippe Castagliola, JinSheng Sun, AnAn Tang & XueLong Hu. (2022) A one-sided adaptive truncated exponentially weighted moving average scheme for time between events. Computers & Industrial Engineering 168, pages 108052.
Crossref
Yu‐Ching Chang & Yi‐Cheng Wu. (2021) A parameter‐free exponential control chart based on Kullback‐Leibler information for time‐between‐events monitoring. Quality and Reliability Engineering International 38:2, pages 733-756.
Crossref
Sajid Ali. (2021) Time‐between‐events monitoring using nonhomogeneous Poisson process with power law intensity. Quality and Reliability Engineering International 37:8, pages 3157-3178.
Crossref
Zhi Lin Chong, Amitava Mukherjee & Marco Marozzi. (2020) Simultaneous monitoring of origin and scale of a shifted exponential process with unknown and estimated parameters. Quality and Reliability Engineering International 37:1, pages 242-261.
Crossref
Vasileios Alevizakos & Christos Koukouvinos. (2020) Monitoring reliability for a gamma distribution with a double progressive mean control chart. Quality and Reliability Engineering International 37:1, pages 199-218.
Crossref
Nirpeksh Kumar & Sonam Jaiswal. (2020) Use of median‐based estimator to construct Phase II exponential chart. Quality and Reliability Engineering International 36:6, pages 2044-2056.
Crossref
Sajid Ali & Ismail Shah. (2020) Monitoring Regularly Maintained Systems Based on the Renewal Process with Generalized Exponential Distribution of Time between Events. Journal of Testing and Evaluation 48:5, pages 20180044.
Crossref
Sajid Ali. (2019) A predictive Bayesian approach to sequential time‐between‐events monitoring. Quality and Reliability Engineering International 36:1, pages 365-387.
Crossref
Nirpeksh Kumar, Amita Baranwal & Subha Chakraborti. (2019) Shewhart‐type Phase II control charts for monitoring times to an event with a guaranteed in‐control and good out‐of‐control performance. Quality and Reliability Engineering International 36:1, pages 231-246.
Crossref
Sajid Ali, Ismail Shah, Lichen Wang & Zhen Yue. (2020) A Comparison of Shewhart-Type Time-Between-Events Control Charts Based on the Renewal Process. IEEE Access 8, pages 113683-113701.
Crossref
Sofia Paulino, Manuel Cabral Morais & Sven Knoth. (2016) On ARL-unbiased c-charts for INAR(1) Poisson counts. Statistical Papers 60:4, pages 1021-1038.
Crossref
Jhon Edinson Hinestroza Ramirez & Nelfi Gertrudis González Álvarez. (2019) Carta de control T de ARL insesgado con parámetro estimado. Revista de la Facultad de Ciencias 8:2, pages 6-38.
Crossref
Nirpeksh Kumar & Amita Baranwal. (2019) Design and implementation of q th quantile‐unbiased t r ‐chart for monitoring times between events . Quality and Reliability Engineering International 35:4, pages 1061-1080.
Crossref
Wissal Jilani, Najla Fourati, Chouki Zerrouki, Olivier Gallot-Lavallée & Hajer Guermazi. (2018) Optical, Dielectric Properties and Energy Storage Efficiency of ZnO/Epoxy Nanocomposites. Journal of Inorganic and Organometallic Polymers and Materials 29:2, pages 456-464.
Crossref
Shuo Huang, Amitava Mukherjee & Jun Yang. (2018) Two CUSUM schemes for simultaneous monitoring of parameters of a shifted exponential time to events. Quality and Reliability Engineering International 34:6, pages 1158-1173.
Crossref
Kim Phuc Tran & Sven Knoth. (2018) Steady-state ARL analysis of ARL-unbiased EWMA-RZ control chart monitoring the ratio of two normal variables. Quality and Reliability Engineering International 34:3, pages 377-390.
Crossref
Sajid Ali. (2017) Time-between-events control charts for an exponentiated class of distributions of the renewal process. Quality and Reliability Engineering International 33:8, pages 2625-2651.
Crossref
Baocai Guo & Bing Xing Wang. (2017) The Design of the S 2 Control Charts Based on Conditional Performance via Exact Methods . Quality and Reliability Engineering International 33:7, pages 1567-1575.
Crossref
Shuo Huang, Jun Yang & Min Xie. (2017) A Study of Control Chart for Monitoring Exponentially Distributed Characteristics Based On Type-II Censored Samples. Quality and Reliability Engineering International 33:7, pages 1513-1526.
Crossref
Sofia Paulino, Manuel Cabral Morais & Sven Knoth. (2016) An ARL-unbiased c-chart. Quality and Reliability Engineering International 32:8, pages 2847-2858.
Crossref
Sajid Ali, Antonio Pievatolo & Rainer Göb. (2016) An Overview of Control Charts for High‐quality Processes. Quality and Reliability Engineering International 32:7, pages 2171-2189.
Crossref
Manuel Cabral Morais. (2016) An ARL-Unbiased n p -Chart . Economic Quality Control 31:1, pages 11-21.
Crossref
Sajid Ali & Antonio Pievatolo. (2016) High quality process monitoring using a class of inter-arrival time distributions of the renewal process. Computers & Industrial Engineering 94, pages 45-62.
Crossref
Jun Yang, Huan Yu, Yuan Cheng & Min Xie. (2016) Design of Gamma Charts Based on Average Time to Signal. Quality and Reliability Engineering International 32:3, pages 1041-1058.
Crossref
Bao-cai Guo & Bing-xing Wang. (2015) Control charts for the Pareto distribution. Applied Mathematics-A Journal of Chinese Universities 30:4, pages 379-396.
Crossref
Peipei Deng, Thong Ngee Goh, Yuan Cheng & Min Xie. (2015) Circle Chart for the Monitoring of Maxima in Periodic Processes. Quality and Reliability Engineering International 31:8, pages 1437-1447.
Crossref
Tingting Huang, Shanggang Wang & Ketai He. (2015) Quality control for fused deposition modeling based additive manufacturing: Current research and future trends. Quality control for fused deposition modeling based additive manufacturing: Current research and future trends.
Baocai Guo, Bing Xing Wang & Yuan Cheng. (2015) Optimal design of a synthetic chart for monitoring process dispersion with unknown in-control variance. Computers & Industrial Engineering 88, pages 78-87.
Crossref
Baocai Guo, Bing Xing Wang & Min Xie. (2014) A study of process monitoring based on inverse Gaussian distribution. Computers & Industrial Engineering 76, pages 49-59.
Crossref
Sajid Ali & Muhammad Riaz. (2014) Cumulative quantity control chart for the mixture of inverse Rayleigh process. Computers & Industrial Engineering 73, pages 11-20.
Crossref
James J. Cochran, Louis A. CoxJr.Jr., Pinar Keskinocak, Jeffrey P. Kharoufeh & J. Cole SmithBaris Surucu & Hakan S. Sazak. 2011. Wiley Encyclopedia of Operations Research and Management Science. Wiley Encyclopedia of Operations Research and Management Science 1 11 .
Mohammad Saber Fallah Nezhad & Seyed Taghi Akhavan Niaki. (2010) A new monitoring design for uni-variate statistical quality control charts. Information Sciences 180:6, pages 1051-1059.
Crossref
Barış Sürücü & Hakan S. Sazak. (2009) Monitoring reliability for a three-parameter Weibull distribution. Reliability Engineering & System Safety 94:2, pages 503-508.
Crossref
Chao Zhang & Gary Stevens. (2008) The Dielectric Response of Polar and Non-Polar Nanodielectrics. IEEE Transactions on Dielectrics and Electrical Insulation 15:2, pages 606-617.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.