19
Views
12
CrossRef citations to date
0
Altmetric
Original Articles

Cyclic Assembly Schedules

&
Pages 346-353 | Received 01 May 1984, Published online: 09 Jul 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (4)

Gerard M. Campbell. (1996) Cyclic Assembly Schedules for Dynamic Demands. IIE Transactions 28:8, pages 643-652.
Read now
D. KIM & V. A. MABERT. (1995) Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems. International Journal of Production Research 33:7, pages 2007-2021.
Read now
B. Toklu & J. M. Wilson. (1992) A heuristic for multi-level lot-sizing problems with a bottleneck. International Journal of Production Research 30:4, pages 787-798.
Read now
SOUMEN GHOSH & ROGERJ. GAGNON. (1989) A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research 27:4, pages 637-670.
Read now

Articles from other publishers (8)

Zied Bahroun & Jean-Pierre Campagne. (2010) Medium Term Production Management for Cyclic Deliveries. Journal of Mathematical Modelling and Algorithms 9:4, pages 311-342.
Crossref
DaeSoo Kim & Vincent A Mabert. (2000) Cycle scheduling for discrete shipping and dynamic demands. Computers & Industrial Engineering 38:2, pages 215-233.
Crossref
M. Moy & D.B. Stewart. (2000) An engineering approach to determining sampling rates for switches and sensors in real-time systems. An engineering approach to determining sampling rates for switches and sensors in real-time systems.
Reza Eftekharzadeh. (1993) A Comprehensive Review of Production Lot‐sizing. International Journal of Physical Distribution & Logistics Management 23:1, pages 30-44.
Crossref
Gerard M. Campbell. (2007) Master Production Scheduling Under Rolling Planning Horizons with Fixed Order Intervals. Decision Sciences 23:2, pages 312-331.
Crossref
SOUMEN GHOSH & ROGER J. GAGNON. 1991. Manufacturing and Automation Systems: Techniques and Technologies, Part 2 of 5. Manufacturing and Automation Systems: Techniques and Technologies, Part 2 of 5 355 405 .
R.J. Gagnon & S. Ghosh. (1991) Assembly line research: Historical roots, research life cycles and future directions. Omega 19:5, pages 381-399.
Crossref
P. Serafini & W. Ukovich. (1989) A Periodic Job Shop Model. IFAC Proceedings Volumes 22:14, pages 89-94.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.