57
Views
17
CrossRef citations to date
0
Altmetric
Original Articles

SINGLE-STAGE, MULTI-PRODUCT PRODUCTION/INVENTORY SYSTEMS WITH BACKORDERS

&
Pages 52-61 | Received 01 May 1991, Published online: 31 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (10)

Han Wu, Gerald Evans & Ki-Hwan Bae. (2016) Production control in a complex production system using approximate dynamic programming. International Journal of Production Research 54:8, pages 2419-2432.
Read now
Daniel Adelman & Christiane Barz. (2014) A price-directed heuristic for the economic lot scheduling problem. IIE Transactions 46:12, pages 1343-1356.
Read now
Nils Löhndorf & Stefan Minner. (2013) Simulation optimization for the stochastic economic lot scheduling problem. IIE Transactions 45:7, pages 796-810.
Read now
N Sanajian, H Abouee-Mehrizi & B Balcıog̃lu. (2010) Scheduling policies in the M/G/1 make-to-stock queue. Journal of the Operational Research Society 61:1, pages 115-123.
Read now
GeorgN. Krieg & Heinrich Kuhn. (2008) Performance evaluation of two-stage multi-product kanban systems. IIE Transactions 40:3, pages 265-283.
Read now
CigdemZ. Gurgur & Tayfur Altiok. (2008) Decentralized multi-product multi-stage systems with backorders. IIE Transactions 40:3, pages 238-251.
Read now
GEORGN. KRIEG & HEINRICH KUHN. (2002) A decomposition method for multi-product kanban systems with setup times and lost sales. IIE Transactions 34:7, pages 613-625.
Read now
TAYFUR ALTIOK & GOANG AN SHIUE. (2000) Pull-type manufacturing systems with multiple product types. IIE Transactions 32:2, pages 115-124.
Read now
SAIFALLAH BENJAAFAR & DIWAKAR GUPTA. (1999) Workload allocation in multi-product, multi-facility production systems with setup times. IIE Transactions 31:4, pages 339-352.
Read now
TAYFUR ALTIOK & RAGHAV RANJAN. (1995) Multi-stage, pull-type production/inventory systems. IIE Transactions 27:2, pages 190-200.
Read now

Articles from other publishers (7)

E.M.M. Winands, I.J.B.F. Adan & G.J. van Houtum. (2011) The stochastic economic lot scheduling problem: A survey. European Journal of Operational Research 210:1, pages 1-9.
Crossref
Santiago Lopez de Haro, Stanley B. Gershwin & Donald B. Rosenfield. (2009) Schedule evaluation in unstable manufacturing environments. International Journal of Production Economics 121:1, pages 183-194.
Crossref
Nima Sanajian & Barış Balcıog˜lu. (2009) The impact of production time variability on make-to-stock queue performance. European Journal of Operational Research 194:3, pages 847-855.
Crossref
B.N. Khoury, N.E. Abboud & M.M. Tannous. (2001) The common cycle approach to the ELSP problem with insufficient capacity. International Journal of Production Economics 73:2, pages 189-199.
Crossref
W.E. Wilhelm & Pradip Som. (1998) Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system. European Journal of Operational Research 108:1, pages 74-93.
Crossref
Shimon Y. Nof, Wilbert E. Wilhelm & Hans-Jürgen WarneckeShimon Y. Nof, Wilbert E. Wilhelm & Hans-Jürgen Warnecke. 1997. Industrial Assembly. Industrial Assembly 259 311 .
Tayfur AltiokTayfur Altiok. 1997. Performance Analysis of Manufacturing Systems. Performance Analysis of Manufacturing Systems 273 351 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.