1,605
Views
85
CrossRef citations to date
0
Altmetric
Original Articles

Big data analytics for forecasting cycle time in semiconductor wafer fabrication system

&
Pages 7231-7244 | Received 02 Nov 2015, Accepted 24 Mar 2016, Published online: 22 Apr 2016

References

  • Backus, P., M. Janakiram, S. Mowzoon, and G. C. Runger. 2006. “Factory Cycle-time Prediction with a Data-mining Approach.” IEEE Transactions on Semiconductor Manufacturing 19 (2): 252–258.10.1109/TSM.2006.873400
  • Bolón-Canedo, V., N. Sánchez-Maroño, and A. Alonso-Betanzos. 2013. “A Review of Feature Selection Methods on Synthetic Data.” Knowledge and Information Systems 34 (3): 483–519.10.1007/s10115-012-0487-8
  • Cachon, G. P., and C. Terwiesch. 2006. “Matching Supply with Demand: An Introduction to Operations Management.” New York: McGraw-Hill.
  • Chang, P., and T. W. Liao. 2006. “Combining SOM and Fuzzy Rule Base for Flow Time Prediction in Semiconductor Manufacturing Factory.” Applied Soft Computing 6 (2): 198–206.10.1016/j.asoc.2004.12.004
  • Chang, P., J. Hieh, and T. W. Liao. 2005. “Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory.” Journal of Intelligent Manufacturing 16 (4): 549–557.10.1007/s10845-005-1663-4
  • Chaudhuri, A., B. K. Mohanty, and K. N. Singh. 2013. “Supply Chain Risk Assessment during New Product Development: A Group Decision Making Approach Using Numeric and Linguistic Data.” International Journal of Production Research 51 (10): 2790–2804.10.1080/00207543.2012.654922
  • Chen, T. 2011. “Applying the Hybrid Fuzzy C-means-back Propagation Network Approach to Forecast the Effective Cost per Die of a Semiconductor Product.” 61 (3): 752–759.
  • Chen, T. 2012. “Intelligent Scheduling Approaches for a Wafer Fabrication Factory.” Journal of Intelligent Manufacturing 23 (3): 897–911.10.1007/s10845-010-0445-9
  • Chen, T., and Y. Wang. 2013. “An Iterative Procedure for Optimizing the Performance of the Fuzzy-neural Job Cycle Time Estimation Approach in a Wafer Fabrication Factory.” Mathematical Problems in Engineering 2013 (8): 61–61.
  • Chen, T., and Y.-C. Wang. 2010. “Incorporating the FCM–BPN Approach with Nonlinear Programming for Internal Due Date Assignment in a Wafer Fabrication Plant.” Robotics and Computer Integrated Manufacturing 26 (1): 83–91.10.1016/j.rcim.2009.04.001
  • Cheng, H., Z. Qin, C. Feng, Y. Wang, and F. Li. 2011. “Conditional Mutual Information-based Feature Selection Analyzing for Synergy and Redundancy.” ETRI Journal 33 (2): 210–218.10.4218/etrij.11.0110.0237
  • Chien, C., C. Hsu, and C. Hsiao. 2012. “Manufacturing Intelligence to Forecast and Reduce Semiconductor Cycle Time.” Journal of Intelligent Manufacturing 23 (6): 2281–2294.10.1007/s10845-011-0572-y
  • Chung, S., and H. Huang. 2002. “Cycle Time Estimation for Wafer Fab with Engineering Lots.” IIE Transactions 34 (2): 105–118.
  • Cunningham, S. P., and J. G. Shanthikumar. 1996. “Empirical Results on the Relationship between Die Yield and Cycle Time in Semiconductor Wafer Fabrication.” IEEE Transactions on Semiconductor Manufacturing 9 (2): 273–277.10.1109/66.492822
  • Da Cunha, C., B. Agard, and A. Kusiak. 2006. “Data Mining for Improvement of Product Quality.” International Journal of Production Research 44 (18–19): 4027–4041.10.1080/00207540600678904
  • Ginsberg, J., M. H. Mohebbi, R. S. Patel, L. Brammer, M. S. Smolinski, and L. Brilliant. 2008. “Detecting Influenza Epidemics Using Search Engine Query Data.” Nature 457 (7232): 1012–1014.
  • Hsieh, L. Y., K. Chang, and C. Chien. 2013. “Efficient Development of Cycle Time Response Surfaces Using Progressive Simulation Metamodeling.” International Journal of Production Research 52 (10): 3097–3109.
  • Jiang, P., and X. S. Liu. 2015. “Big Data Mining Yields Novel Insights on Cancer.” Nature Genetics 47 (2): 103–104.10.1038/ng.3205
  • Li, L., Q. Chang, et al. 2009. “Data Driven Bottleneck Detection of Manufacturing Systems.” International Journal of Production Research 47 (18): 5019–5036.10.1080/00207540701881860
  • Lu, S. C., D. Ramaswamy, and P. R. Kumar. 1994. “Efficient Scheduling Policies to Reduce Mean and Variance of Cycle-time in Semiconductor Manufacturing Plants.” IEEE Transactions on Semiconductor Manufacturing 7 (3): 374–388.10.1109/66.311341
  • Manyika, J., M. Chui, et al. 2011. “Big Data: The Next Frontier for Innovation, Competition, and Productivity.” McKinsey Global Institute.
  • Marz, N., and J. Warren. 2015. Big Data: Principles and Best Practices of Scalable Realtime Data Systems. Greenwich, CT: Manning Publications.
  • Pearn, W. L., S. H. Chung, et al. 2007. “Due-date Assignment for Wafer Fabrication under Demand Variate Environment.” IEEE Transactions on Semiconductor Manufacturing 20 (2): 165–175.10.1109/TSM.2007.895215
  • Qin, W., J. Zhang, and Y. Sun. 2013. “Dynamic Dispatching for Interbay Material Handling by Using Modified Hungarian Algorithm and Fuzzy-logic-based Control.” The International Journal of Advanced Manufacturing Technology 67 (1–4): 295–309.10.1007/s00170-013-4775-6
  • Rossi, F., A. Lendasse, D. François, V. Wertz, and M. Verleysen. 2006. “Mutual Information for the Selection of Relevant Variables in Spectrometric Nonlinear Modelling.” Chemometrics and Intelligent Laboratory Systems 80 (2): 215–226.10.1016/j.chemolab.2005.06.010
  • R.Schelasin. (2011). “Using Static Capacity Modeling and Queuing Theory Equations to Predict Factory Cycle Time Performance in Semiconductor Manufacturing.” IEEE Proceedings of the 2011 Winter Simulation Conference (WSC), Phoenix, AZ, 2040–2049.
  • Sha, D. Y., and S. Y. Hsu. 2004. Due-date Assignment in Wafer Fabrication Using Artificial Neural Networks. 23: 768–775.
  • Sha, D. Y., R. L. Storch, C. H. Liu. 2007. “Development of a Regression-based Method with Case-based Tuning to Solve the Due Date Assignment Problem.” International Journal of Production Research 45 (1): 65–82.10.1080/00207540500507435
  • Shiue, Y. R. 2009. “Data-mining-Based Dynamic Dispatching Rule Selection Mechanism for Shop Floor Control Systems Using a Support Vector Machine Approach.” International Journal of Production Research 47 (13): 3669–3690.10.1080/00207540701846236
  • Tai, Y. T., W. L. Pearn, and J. H. Lee. 2012. “Cycle Time Estimation for Semiconductor Final Testing Processes with Weibull-distributed Waiting Time.” International Journal of Production Research 50 (2): 581–592.10.1080/00207543.2010.543938
  • Tirkel, I. 2013. “Forecasting Flow Time in Semiconductor Manufacturing Using Knowledge Discovery in Databases.” International Journal of Production Research 51 (18): 5536–5548.10.1080/00207543.2013.787168
  • Vergara, J. R., and P. A. Estévez. 2014. “A Review of Feature Selection Methods Based on Mutual Information.” Neural Computing and Applications 24 (1): 175–186.10.1007/s00521-013-1368-0
  • Wang, L., and J. M. Mendel. 1992. “Generating Fuzzy Rules by Learning from Examples.” IEEE Transactions on Systems, Man, and Cybernetics 22 (6): 1414–1427.10.1109/21.199466
  • Wein, L. M. 1988. “Scheduling Semiconductor Wafer Fabrication.” IEEE Transactions on Semiconductor Manufacturing 1 (3): 115–130.10.1109/66.4384
  • Yang, F., B. Ankenman, and B. L. Nelson. 2007. “Efficient Generation of Cycle Time-throughput Curves through Simulation and Metamodeling.” Naval Research Logistics 54 (1): 78–93.10.1002/(ISSN)1520-6750
  • Yang, F., B. E. Ankenman, and B. L. Nelson. 2008. “Estimating Cycle Time Percentile Curves for Manufacturing Systems via Simulation.” INFORMS Journal on Computing 20 (4): 628–643.10.1287/ijoc.1080.0272
  • Yen, C. H., and W. L. Pearn. 2009. “Select Better Suppliers Based on Manufacturing Precision for Processes with Multivariate Data.” International Journal of Production Research 47 (11): 2961–2974.10.1080/00207540701796985
  • Zhang, J., W. Qin, L. H. Wu, and W. B. Zhai. 2014. “Fuzzy Neural Network-based Rescheduling Decision Mechanism for Semiconductor Manufacturing.” Computers in Industry 65 (8): 1115–1125.10.1016/j.compind.2014.06.002

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.