References
- Arditi, D., Tokdemir, О., & Suh, К. (2001). Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(2), 90-103.
- Ballard, G., & Howell, G. (1997). Implementing lean construction: Stabilizing work flow. In L. Alarcon (Ed.), Lean construction (pp. 101-110). Rotterdam, The Netherlands: A. A. Balkema.
- Ballard, G., & Howell, G. (1998). Shielding production: Essential step in production control. Journal of Construction Engineering and Management, 124(1), 11-17.
- Bashford, H., Sawhney, A., Walsh, K., & Kot, К. (2003). Implications of even-flow production methodology for the U.S. housing industry. Journal of Construction Engineering and Management, 129(3), 330-337.
- Bessant, J., Caffyn, S., & Gallagher, M. (2001). An evolutionary model of continuous improvement behaviour. Technovation, 21, 67-77.
- Boer, H., Berger, A., Chapman, R., & Gertsen, F. (Eds.). (2000). CI changes: From suggestion box to organizational learning - Continuous improvement in Europe and Australia. Aldershot: Ashgate.
- Carlson, D. (Ed.). (1991). Automated builder: Dictionary/encyclopedia of industrialized housing. Carpinteria, CA: Automated Builder Magazine, Publications Division, CMN Associates, Inc.
- El-Rayes, K., Ramanathan, R.,& Moselhi, O. (2002). An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20, 201-210.
- Hickory Consortium. (2000, November). Milestone report: Quality modular building task force meeting results and the research agenda. Report to National Renewable Energy Laboratory, Deliverable 6.B.2b Task Order KAR-5-18413-06.
- Koskela, L. (1993). Lean production in construction. Proceedings of the 10thInternational Symposium on Automation and Robotics in Construction, Houston, TX, 47-54.
- Laraia, A., Moody, P., & Hall, R. (1999). The kaizen blitz: Accelerating breakthroughs in productivity and performance. San Francisco: Jossey-Bass.
- Mullens, M. (1998, December). Milestone report: Results of industrial engineering studies of the Epoch Corporation modular manufacturing facility. Report to National Renewable Energy Laboratory, Deliverable 2.C.1 Task Order KAR-5-18413-02.
- Mullens, M. (2002, August). Progress report: April 2001 - March 2002. Report to Industrialized Housing Partnership & Building America Program - U.S. Department of Energy, University of Central Florida Housing Constructability Lab, Orlando, FL.
- Mullens, M., & Kelley, M. (2002, May). Introducing revolutionary change in the modular housing construction process using a Kaizen Blitz [CD-ROM]. Industrial Engineering Research 2002 Conference Proceedings, Orlando, FL.
- Ohno, T. (1988). Toyota production system. Shelton, CT: Productivity Press.
- Pande, P., Neuman, R., & Cavanagh, R. (2000). The six sigma way: How GE, Motorola, and other top companies are honing their performance. New York: McGraw-Hill.
- Traynor, T. (2002). Total housing even in 2001 at 2.219 million. Automated Builder, 39, 19.
- Womack, J., & Jones, D. (1996). Lean thinking: Banish waste and create wealth in your corporation. New York: Simon & Schuster.