References
- Beukers, E., Bertolini, L., & Te Brömmelstroet, M. (2012). Why cost benefit analysis is perceived as a problematic tool for assessment of transport plans: A process perspective. Transport Research Part A, 46, 68–78. https://doi.org/10.1016/j.tra.2011.09.004
- Biatour, B., Kegels, C., Van Der Linden, J., & Verwerft, D. (2017). Public investment in Belgium. Current state and economic impact. Federal Planning Bureau.
- Bing, L., Akintoye, A., Edwards, P. J., & Hardcastle, C. (2005). The allocation of risk in PPP/PFI construction projects in the UK. International Journal of Project Management, 23(1), 25–35. https://doi.org/10.1016/j.ijproman.2004.04.006
- Black, F., & Scholes, M. (1973). The pricing of options and corporate liabilities. Journal of Political Economy, 81(3), 637–654. https://doi.org/10.1086/260062
- Bowe, M., & Lee, D. L. (2004). Project evaluation in the presence of multiple embedded real options: Evidence from the Taiwan high-speed rail project. Journal of Asian Economics, 15(1), 71–98. https://doi.org/10.1016/j.asieco.2003.12.001
- Brandão, L. E. T., Bastian-Pinto, C., Gomes, L. L., & Labes, M. (2012). Government supports in public–private partnership contracts: Metro Line 4 of the São Paulo subway system. Journal of Infrastructure Systems, 18(3), 218–225. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000095
- Bruzelius, N., Flyvbjerg, B., & Rothengatter, W. (2002). Big decisions, big risks. Improving accountability in mega projects. Transport Policy, 9(2), 143–154. https://doi.org/10.1016/S0967-070X(02)00014-8
- Buyukyoran, F., & Gundes, S. (2018). Optimized real options-based approach for government guarantees in PPP toll road projects. Construction Management and Economics, 36(4), 203–216. https://doi.org/10.1080/01446193.2017.1347267
- Cantarelli, C. C., Flyvbjerg, B., Van Wee, B., & Molin, E. J. E. (2010). Lock-in and its influence on the project performance of large-scale transportation infrastructure projects: Investigating the way in which lock-in can emerge and affect cost overruns. Environment and Planning B: Planning and Design, 37(5), 792–807. https://doi.org/10.1068/b36017
- Chakraborty, A., & McMillan, A. (2015). Scenario planning for Urban planners: Toward a practitioner’s guide. Journal of the American Planning Association, 81(1), 18–29. https://doi.org/10.1080/01944363.2015.1038576
- Cheah, C. Y. J., & Garvin, M. J. (2009). Application of real options in PPP infrastructure projects: Opportunities and challenges. In A. Akintoye & M. Beck (Eds.), Policy, finance & management for public-private partnerships (pp. 229–249). Wiley-Blackwell.
- Couto, G., Nunes, C., & Pimentel, P. (2015). High-speed rail transport valuation and conjecture shocks. The European Journal of Finance, 21(10–11), 791–805. https://doi.org/10.1080/1351847X.2012.665377
- De Neufville, R., Scholtes, S., & Wang, T. (2006). Real options by spreadsheet: Parking Garage case example. Journal of Infrastructure Systems, 12(2), 107–111. https://doi.org/10.1061/(ASCE)1076-0342(2006)12:2(107)
- Dixit, A. K., & Pindyck, R. S. (1994). Investment under uncertainty. Princeton University Press.
- Fawcett, W., Urquijo, R., Krieg, H., Hughes, M., Mikalsen, L., & Gutiérrez, O. R. R. (2015). Cost and environmental evaluation of flexible strategies for a highway construction project under traffic growth uncertainty. Journal of Infrastructure Systems, 21(3). https://doi.org/10.1061/(ASCE)IS.1943-555X.0000230
- Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6–19. https://doi.org/10.1002/pmj.21409
- Flyvbjerg, B. (Ed.). (2017). The Oxford handbook of megaproject management. Oxford University Press.
- Flyvbjerg, B., Garbuio, M., & Lovallo, D. (2009). Delusion and deception in large infrastructure projects: Two models for explaining and preventing executive disaster. California Management Review, 51(2), 170–194. https://doi.org/10.2307/41166485
- Flyvbjerg, B., Skamris Holm, M. K., & Buhl, S. L. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68(3), 279–295. https://doi.org/10.1080/01944360208976273
- Flyvbjerg, B., Skamris Holm, M. K., & Buhl, S. L. (2005). How (in)accurate are demand forecasts in public works projects?: The case of transportation. Journal of the American Planning Association, 71(2), 131–146. https://doi.org/10.1080/01944360508976688
- Ford, D. N., Lander, D. M., & Voyer, J. J. (2002). A real options approach to valuing strategic flexibility in uncertain construction projects. Construction Management and Economics, 20(4), 343–351. https://doi.org/10.1080/01446190210125572
- Garvin, M. J., & Ford, D. N. (2012). Real options in infrastructure projects: Theory, practice and prospects. Engineering Project Organization Journal, 2(1–2), 97–108. https://doi.org/10.1080/21573727.2011.632096
- Giezen, M. (2013). Adaptive and strategic capacity: Navigating megaprojects through uncertainty and complexity. Environment and Planning B: Planning and Design, 40(4), 723–741. https://doi.org/10.1068/b38184
- Giezen, M., Bertolini, L., & Salet, W. (2015). Adaptive capacity within a mega project: A case study on planning and decision-making in the face of complexity. European Planning Studies, 23(5), 999–1018. https://doi.org/10.1080/09654313.2014.916254
- Gil, N. (2017). A collective-action perspective on the planning of megaprojects. In B. Flyvbjerg (Ed.), The Oxford Handbook of megaproject management (pp. 259–286). Oxford University Press.
- Grimes, A. (2011, August 30 – September 2). Building bridges: Treating a new transport link as a real option. 51st Congress of the European Regional Science Association: ‘New Challenges for European Regions and Urban Areas in a Globalised World’, Barcelona, Spain.
- Hardcastle, C., & Boothroyd, K. (2003). Risks overview in public-private partnership. In A. Akintoye, M. Beck, & C. Hardcastle (Eds.), Public-private partnerships (pp. 31–57). Oxford: Blackwell Science.
- Herder, P. M., De Joode, J., Ligtvoet, A., Schenk, S., & Taneja, P. (2011). Buying real options – Valuing uncertainty in infrastructure planning. Futures, 43(9), 961–969. https://doi.org/10.1016/j.futures.2011.06.005
- Irimia-Di é guez, A., Sanchez-Cazorla, A., & Alfalla-Luque, R. (2014). Risk management in megaprojects. Procedia – Social and Behavioral Sciences, 119, 407–416. https://doi.org/10.1016/j.sbspro.2014.03.046
- Koppenjan, J., Veeneman, W., Van Der Voort, H., Ten Heuvelhof, E., & Leijten, M. (2011). Competing management approaches in large engineering projects: The Dutch Randstad Rail project. International Journal of Project Management, 29(6), 740–750. https://doi.org/10.1016/j.ijproman.2010.07.003
- Kozlova, M. (2017). Real option valuation in renewable energy literature: Research focus, trends and design. Renewable and Sustainable Energy Reviews, 80, 180–196. https://doi.org/10.1016/j.rser.2017.05.166
- Krane, H. P., Rolstadås, A., & Olsson, N. O. E. (2010). Categorizing risks in seven large projects—Which risks do the projects focus on?. Project Management Journal, 41(1), 81–86. https://doi.org/10.1002/pmj.20154
- Little, R. G. (2011). The emerging role of public-private partnerships in megaproject delivery. Public Works Management & Policy, 16(3), 240–249. https://doi.org/10.1177/1087724X11409244
- Martins, J., Marques, R. C., & Cruz, C. O. (2014). Maximizing the value for money of PPP arrangements through flexibility: An application to airports. Journal of Air Transport Management, 39, 72–80. https://doi.org/10.1016/j.jairtraman.2014.04.003
- Martins, J., Marques, R. C., & Cruz, C. O. (2015). Real options in infrastructure: Revisiting the literature. Journal of Infrastructure Systems, 21(1). https://doi.org/10.1061/(ASCE)IS.1943-555X.0000188
- Martins, J., Marques, R. C., Cruz, C. O., & Fonseca, Á. (2017). Flexibility in planning and development of a container terminal: An application of an American-style call option. Transportation Planning and Technology, 40(7), 828–840. https://doi.org/10.1080/03081060.2017.1340026
- Mirzadeh, I., & Birgisson, B. (2016). Evaluation of highway projects under government support mechanisms based on an option-pricing framework. Journal of Construction Engineering and Management, 142(4). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001079
- Myers, S. C. (1977). Determinants of corporate borrowing. Journal of Financial Economics, 5(2), 147–175. https://doi.org/10.1016/0304-405X(77)90015-0
- Nicolaisen, M. S. (2012). Forecasts: Fact or fiction? [PhD thesis]. Department of Development and Planning, Aalborg University.
- Petticrew, M., & Roberts, H. (2008). Systematic reviews in the social sciences: A practical guide. Wiley.
- PMI. (2008). Organizational project management maturity model: OPM3.
- Priemus, H. (2010). Mega-projects: Dealing with pitfalls. European Planning Studies, 18(7), 1023–1039. https://doi.org/10.1080/09654311003744159
- Priemus, H., Bosch-Rekveldt, M., & Giezen, M. (2013). Dealing with the complexity, uncertainties and risks of mega-projects: Redundancy, resilience and adaptivity. In H. Priemus & B. van Wee (Eds.), International handbook in mega-projects (pp. 83–110). Cheltenham: Edward Elgar.
- Priemus, H., Flyvbjerg, B., & Van Wee, B. (Eds.). (2008a). Decision-Making on mega-projects. Edward Elgar.
- Priemus, H., Flyvbjerg, B., & Van Wee, B. (2008b). Introduction: Scope of the book. In H. Priemus & B. Van Wee (Eds.), Decision-Making on megaprojects (pp. 1–20). Edward Elgar.
- Priemus, H., & Van Wee, B. (Eds.). (2013). International handbook on mega-projects. Edward Elgar.
- Simon, H. A. (1997). Administrative behavior: A study of decision-making processes in administrative organizations. Frees Press.
- Thijssen, J. J. J. (2015). A model for irreversible investment with construction and revenue uncertainty. Journal of Economic Dynamics and Control, 57, 250–266. https://doi.org/10.1016/j.jedc.2015.06.001
- Trigeorgis, L. (1996). Real options. Managerial flexibility and strategy in recourse allocation. MIT Press.
- Van Wee, B., & Rietveld, P. (2013). CBA, ex ante evaluation of mega-projects. In H. Priemus & B. Van Wee (Eds.), International handbook on mega-projects (pp. 269–290). Edward Elgar.
- Winch, G. (2017). Megaproject Stakeholder management. In B. Flyvbjerg (Ed.), The Oxford handbook of megaproject management (pp. 339–361). Oxford University Press.
- Wooldridge, S. C., Garvin, M. J., Cheah, C. Y. J., & Miller, J. B. (2002). Valuing flexibility in private toll road development: Analysis of the Dulles Greenway. The Journal of Structured Finance, 7(4), 25–36. https://doi.org/10.3905/jsf.2002.320264
- Xiong, W., & Zhang, X. (2016). The real option value of renegotiation in public-private partnerships. Journal of Construction Engineering and Management, 142. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001130
- Zhao, T., Sundararajan, S. K., & Tseng, C.-L. (2004). Highway development decision-making under uncertainty: A real options approach. Journal of Infrastructure Systems, 10(1), 23–32. https://doi.org/10.1061/(ASCE)1076-0342(2004)10:1(23)