581
Views
3
CrossRef citations to date
0
Altmetric
Pages 661-678 | Received 19 Aug 2020, Accepted 30 Mar 2021, Published online: 18 Apr 2021

References

  • Abdul-Rahman, H., C. Wang, and J. B. H. Yap. 2016. “Impacts of Design Changes on Construction Project Performance: Insights from a Literature Review.” Journal of Quantity Surveying & Construction Business 7 (1): 31–54.
  • Asamaoh, R. O., and K. Offei-Nyako. 2013. “Variation Determinants in Building Construction: Ghanaian Professionals’ Perspective.” Journal of Construction Engineering and Project Management 3 (4): 20–25.
  • Batty, M., and Y. Xie. 1997. “Possible Urban Automata.” Environment and Planning B: Planning and Design 24 (2): 175–192.
  • Behzadan, A. H., and V. R. Kamat. 2011. “Integrated Information Modelling and Visual Simulation of Engineering Operations Using Dynamic Augmented Reality Scene Graphs.” Journal of Information Technology in Construction (ITcon) 16 (17): 259–278.
  • Billinghurst, M., and H. Kato. 2002. “Collaborative Augmented Reality.” Communications of the ACM 45 (7): 64–70.
  • Busel, M. 2017. “The 6 Biggest Challenges Facing Augmented Reality.” https://haptic.al/augmented-realitys-biggest-threats-3f4726a3608.
  • Cardoso, S. F. L., Q. M. C. F. Mariano, and R. E. Zorzal. 2020. “A Survey of Industrial Augmented Reality.” Computers & Industrial Engineering 139: 106159.
  • Carmigniani, J., B. Furht, M. Anisetti, P. Ceravolo, E. Damiani, and M. Ivkovic. 2011. “Augmented Reality Technologies, Systems and Applications.” Multimedia Tools and Applications 51 (1): 341–377.
  • Chalhoub, J., and S. K. Ayer. 2018. “Using Mixed Reality for Electrical Construction Design Communication.” Automation in Construction 86: 1–10.
  • Cheng, E., H. Li, and P. Love. 2001. “Network Communication in the Construction Industry.” Corporate Communications: An International Journal 6 (2): 61–70.
  • Cumming, M. 2002. “A Bottom-Up Approach to Design Coordination.” Proceedings of the 6th International Conference in Design and Decision Support Systems in Architecture. Eindhoven University of Technology, Netherlands, 85–104.
  • Dainty, A., D. Moore, and M. Murray. 2006. Communication in Construction; Theory and Practice. Abingdon, OX: Taylor and Francis.
  • Daponte, P., L. De Vito, F. Picariello, and M. Riccio. 2014. “State of the Art and Future Developments of the Augmented Reality for Measurement Applications.” Measurement 57: 53–70.
  • Donsbach, W. 2006. “The Identity of Communication Research.” Journal of Communication 56 (3): 437–448.
  • Douglas, D. 2003. “Grounded Theories of Management: A Methodological Review.” Management Research News 26 (5): 44–52.
  • Duffy, H. B. 1997. “The ‘What’ and ‘How’ of Learning in Design.” IEEE Expert 12 (3): 71–76.
  • Dunston, P. S., and X. Wang. 2005. “Mixed Reality-Based Visualization Interfaces for Architecture, Engineering, and Construction Industry.” Journal of Construction Engineering and Management 131 (12): 1301–1309.
  • Elshafey, A., C. C. Saar, E. B. Aminudin, M. Gheisari, and A. Usmani. 2020. “Technology Acceptance Model for Augmented Reality and Building Information Modelling Integration in the Construction Industry.” Journal of Information Technology in Construction 25 (10): 161–172.
  • Etikan, I., S. A. Musa, and R. S. Alkassim. 2016. “Comparison of Convenience Sampling and Purposive Sampling.” American Journal of Theoretical and Applied Statistics 5 (1): 1–4.
  • Froese, T. M. 2005. “Impact of Emerging Information Technology on Information Management.” International Conference on Computing in Civil Engineering, 1–10.
  • Georgiou, M. 2020. “12 Tachnology Trends and Ideas for the Construction Industry in 2020 (with Examples).” https://www.imaginovation.net/blog/construction-industry-technology-trends/.
  • Gheisari, Masoud, Mohsen Foroughi Sabzevar, Pojui Chen, and Javier Irizzary. 2016. “Integrating BIM and Panorama to Create a Semi-Augmented-Reality Experience of a Construction Site.” International Journal of Construction Education and Research 12 (4): 303–316.
  • Gunarathna, C., R. J. Yang, and N. Fernando. 2018. “Conflicts and Management Styles in the Sri Lankan Commercial Building Sector. Engineering.” Engineering, Construction and Architectural Management 25 (2): 178–201.
  • Ham, N., S. Moon, J. U. Kim, and J. J. Kim. 2018. “Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project.” Journal of Construction Engineering and Management 144 (6): 05018006.
  • Hanna, A. S., R. Camlic, P. A. Peterson, and M. J. Lee. 2004. “Cumulative Effect of Project Changes for Electrical and Mechanical Construction.” Journal of Construction Engineering and Management 130 (6): 762–771.
  • Hill, A., J. Schiefer, J. Wilson, B. Davidson, M. Gandy, and B. MacIntyre. 2011. “Virtual Transparency: Introducing Parallax View into Video See-through AR.” 10th IEEE International Symposium on Mixed and Augmented Reality in Basel. Switzerland. 239–240. https://get.google. com/tango_developers.google.com/ar.
  • Hua, H., and B. Javidi. 2014. “A 3D Integral Imaging Optical see-through Head-Mounted Display.” Optics Express 22 (11): 13484–13491.
  • Hwang, B. G., and L. K. Low. 2012. “Construction Project Change Management in Singapore: Status, Importance and Impact.” International Journal of Project Management 30 (7): 817–826.
  • Hwang, B. G., and S. Yang. 2014. “Rework and Schedule Performance: A Profile of Incidence, Impact, Causes and Solutions. Engineering.” Engineering, Construction and Architectural Management 21 (2): 190–205.
  • Index AR Solutions. 2018. Augmented Reality for Construction. https://www.indexarsolutions.com/wpcontent/uploads/IndexAR_Construction_FINAL_web.pdf.
  • Jiao, Y., S. Zhang, Y. Li, Y. Wang, and B. Yang. 2013. “Towards Cloud Augmented Reality for Construction Application by BIM and SNS Integration.” Automation in Construction 33: 37–47.
  • Jibrin, A. M., N. Z. Muhammad, and Y. H. Labaran. 2020. “Evaluation of Factors Responsible for Variation Order in Civil Engineering Projects: A Clients’ Perspective (A Case Study in Kano State, Nigeria).” Evaluation 7 (5): 1373–1377.
  • Jin, J. 2017. New Poetics of Augmented Space: Reconceptualise Augmented Space Based on Fundamentals of Augmented Reality (AR). Nottingham: University of Nottingham. https://www.researchgate.net/publication/319472206_New_Poetics_of_Augmented_Space_Reconceptualise_Augmented_Space_based_on_Fundamentals_of_Augmented_Reality_AR.
  • Kalkofen, D., C. Sandor, S. White, and D. Schmalstieg. 2011. “Visualization Techniques for Augmented Reality.” In Handbook of Augmented Reality, edited by B. Furht, 65–98. NewYork, NY: Springer.
  • Keyton, J. 2011. “Communication and Organizational Culture.” In A Key to Understanding Work Experiences, edited by T. R. Armstrong. Thousand Oaks, CA: Sage.
  • Kivrak, S., and G. Arslan. 2018. “Advances in Informatics and Computing in Civil and Construction Engineering.” In Proceeding of the 35th CIB W78 2018 conference; IT in Design, Construction and management in Chicago, IL.
  • Krajacic. 2017. Use of IT Mobile Devices on Construction Sites. Accessed March 8, 2020. https://learninglegacy.crossrail.co.uk/article-author/igor-krajacic/.
  • Krevelen, D. W. V., and R. Poelman. 2010. “A Survey of Augmented Reality Technologies, Applications and Limitations.” The International Journal of Virtual Reality 9 (2): 1–20.
  • Larsen, J. K., G. Q. Shen, S. M. Lindhard, and T. D. Brunoe. 2015. “Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects.” Journal of Management in Engineering 32: 1.
  • Leite, F., B. Akinci, and J. Garrett. 2009. “Identification of Data Items Needed for Automatic Clash Detection in MEP Design Coordination. In Building A Sustainable Future.” Proceedings of the Construction Research Congress, Seattle, WA, USA, 5–7 April.
  • Li, X., W. Yi, H. L. Chi, X. Wang, and A. P. Chan. 2018. “A Critical Review of Virtual and Augmented Reality (VR/AR) Applications in Construction Safety.” Automation in Construction 86: 150–162.
  • Lin, T.-H., C. H. Liu, M. H. Tsai, and S. C. Kang. 2015. “Using Augmented Reality in a Multiscreen Environment for Construction Discussion.” Journal of Computing in Civil Engineering 29 (6). 04014088.
  • Ling, H. 2017. “Augmented Reality in Reality.” IEEE Multimedia 24 (3): 10–15. doi:10.1109/MMUL.2017.3051517.
  • Linowes, J., and K. Babilinski. 2017. Augmented Reality for Developers: Build Practical Augmented Reality Applications with Unity, ARCore, ARKit, and Vuforia. Birmingham, UK: Packt Publishing.
  • Love, P. E. D., D. J. Edwards, J. Smith, and D. H. T. Walker. 2009. “Divergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects.” Journal of Performance of Constructed Facilities 23: 480–488.
  • Machado, R. L., and C. Vilela. 2020. “Conceptual Framework for Integrating BIM and Augmented Reality.” Journal of Civil Engineering and Management 26 (1): 83–94. doi:10.3846/jcem.2019.11803.
  • Mckinsey. 2016. “Digital Australia: Seizing the opportunity from the Fourth Industrial Revolution.” https://www.mckinsey.com/featured-insights/asia-pacific/digital-australia-seizing-opportunity-from-the-fourth-industrial-revolution.
  • Mekni, M., and A. Lemieux. 2014. Augmented Reality: Applications, Challenges and Future Trends. Applied Computational Science, 205–214. http://www.wseas.us/e-library/conferences/2014/Malaysia/ACACOS/ACACOS-29.pdf.
  • Meza, S., Z. Turk, and M. Dolenc. 2014. “Component Based Engineering of a Mobile BIM-Based Augmented Reality System.” Automation in Construction 42: 1–12.
  • Microsoft HoloLens Specification. https://www.microsoft.com/en-us/hololens.
  • Muhammad, N. Z., A. Keyvanfar, M. Z. Abd-Majid, A. Shafaghat, A. M. Magana, and N. S. Dankaka. 2015. “Causes of Variation Order in Building and Civil Engineering Projects in Nigeria.” Journal Teknologi (Sciences & Engineering) 77 (16): 91–97.
  • Norouzi, N., M. Shabak, M. R. B. Embi, and T. H. Khan. 2015. “The Architect, the Client and Effective Communication in Architectural Design Practice.” Procedia - Social and Behavioral Sciences 172: 635–642.
  • Noruwa, B. I., A. O. Arewa, and C. Merschbrock. 2020. “Effects of Emerging Technologies in Minimising Variations in Construction Projects in the UK.” International Journal of Construction Management. doi:10.1080/15623599.2020.1772530.
  • Oesterreich, T., and F. Teuteberg. 2016. “Understanding the Implications of Digitization and Automation in the Context of Industry 4.0: A Triangulation Approach and Elements of a Research Agenda for the Construction Industry.” Computers in Industry 83: 121–139.
  • Olawale, Y. A., and M. Sun. 2010. “Cost and Time Control of Construction Projects: Inhibiting Factors and Mitigating Measures in Practice.” Construction Management and Economics 28 (5): 509–526.
  • Onyegiri, I., and C. Nwachukwu. 2011. “Information and Communication Technology in the Construction Industry.” IJCRB Journal 3 (1): 542–549.
  • Ozturk, G. B., D. Arditi, I. Yitman, and M. Yalcinkaya. 2016. “The Factors Affecting Collaborative Building Design.” Procedia Engineering 161: 797–803.
  • Park, C., D. Lee, O. Kwon, and X. Wang. 2013. “A Framework for Proactive Construction Defect Management Using BIM, Augmented Reality and Ontology-Based Data Collection Template.” Automation in Construction 33: 61–71.
  • Pereira, R. E., M. Gheisari, and B. Esmaeili. 2018. “Using Panoramic Augmented Reality to Develop a Virtual Safety Training Environment.” Construction Research Congress 2018. doi:10.1061/9780784481288.004.
  • Perera, B. A. K. S., B. J. Ekanayake, C. Jayalath, and G. R. H. Jayathilaka. 2019. “A Study on Variation-Specific Disputes That Arise in Road Projects in Sri Lanka: A Qualitative Approach.” International Journal of Construction Management. doi:10.1080/15623599.2019.1573478.
  • Priyadharshini, N., and S. S. Kumar. 2015. “Project Communication: Is Key to Productive Construction and It’s Research Needs in the Future of Construction Engineering and Management.” International Journal of Science, Technology & Management 4 (1): 1493–1499.
  • Saunders, B., J. Sim, T. Kingstone, S. Baker, J. Waterfield, B. Bartlam, H. Burroughs, and C. Jinks. 2018. “Saturation in Qualitative Research: Exploring Its Conceptualization and Operationalization.” Quality & Quantity 52 (4): 1893–1907.
  • Schmidt, R. F. 2013. Software Engineering: Architecture- Driven Software Development. Waltham: Elsevier.
  • Shakil, A. 2019. “A Review on Using Opportunities of Augmented Reality and Virtual Reality in Construction Project Management.” Organization, Technology and Management in Construction: An International Journal 11 (1): 1839–1852. doi:10.2478/otmcj-2018-0012.
  • Shanbari, H., N. Blinn, and R. Issa. 2016. “Using Augmented Reality Video in Enhancing Masonry and Roof Component Comprehension for Construction Management Students.” Engineering, Construction and Architectural Management 23 (6): 765–781.
  • Shen, W., X. Zhang, G. Q. Shen, and T. Fernando. 2013. “The User Pre-Occupancy Evaluation Method in Designer–Client Communication in Early Design Stage: A Case Study.” Automation in Construction 32: 112–124.
  • Shin, D. H., and P. S. Dunston. 2008. “Identification of Application Areas for Augmented Reality in Industrial Construction Based on Technology Suitability.” Automation in Construction 17 (7): 882–894.
  • Smith, S. 2016. “Will Augmented Reality in Construction Deliver on Its Promise?” Institution of Civil Engineers. https://www.ice.org.uk/knowledge-and-resources/briefing-sheet/augmented-reality-in-construction.
  • Sungkur, R. K., A. Panchoo, and N. K. Bhoyroo. 2016. “Augmented Reality, the Future of Contextual Mobile Learning.” Interactive Technology and Smart Education 13 (2): 123–146.
  • Sutton, J., and Z. Austin. 2015. “Qualitative Research: Data Collection, Analysis, and Management.” The Canadian Journal of Hospital Pharmacy 68 (3): 226–240.
  • Tai, S., Y. Wang, and C. Anumba. 2009. “A Survey on Communications in Large-Scale Construction Projects in China.” Engineering, Construction and Architectural Management 16 (2): 136–149.
  • Tipili, L. G., P. O. Ojeba, and M. S. Ilyasu. 2014. “Evaluating the Effects of Communication in Construction Project Delivery in Nigeria.” Global Journal of Environmental Science and Technology 2 (5): 048–054.
  • Tommelein, I. D., and S. Gholami. 2012. “Root Causes of Clashes in Building Information Models.” Proceedings of IGLC20: 20th Annual Conference of the International Group on Lean Construction, San Diego, CA, USA, July 18–20.
  • Unity.com. 2020. https://www.pluralsight.com/paths/unity-augmented-reality-development?aid=7010a000002LUv7AAG&promo=&utm_source=non_branded&utm_medium=digital_paid_search_google&utm_campaign=XYZ_APAC_Dynamic&utm_content=&gclid=CjwKCAiAp4KCBhB6EiwAxRxbpDE_LFiSetLQ7oa74MCQPEfwudGn1EiPKIf-QrkUASi8HLPTN_wEWRoCHhAQAvD_BwE.
  • Vakoms. 2017. “The Biggest Challenges for.” Upwork. https://www.upwork.com/hiring/for-clients/biggest-challenges-augmented-reality/.
  • Valitherm, A., and A. Rahman. 2014. “Communication Barrier in Malaysia Construction Sites.” International Journal of Education and Research 2 (1): 1–10.
  • Vasanthi, R., and A. Abubakar. 2011. “The Needs for Standardization of Document Towards an Efficient Communication in the Construction Industry.” World Applied Sciences Journal 13 (9): 1988–1995.
  • Wang, X. 2009. “Augmented Reality in Architecture and Design: Potentials and Challenges for Application.” International Journal of Architectural Computing 7 (2): 309–326.
  • Wang, X., M. Truijens, L. Hou, Y. Wang, and Y. Zhou. 2014. “Integrating Augmented Reality with Building Information Modeling: Onsite Construction Process Controlling for Liquefied Natural gas Industry.” Automation in Construction 40: 96–105.
  • Whyte, J., A. Stasis, and C. Lindkvist. 2016. “Managing Change in the Delivery of Complex Projects: Configuration Management, Asset Information and ‘Big Data’.” International Journal of Project Management 34 (2): 339–351.
  • Wong, J. K. W., J. X. Zhou, and A. P. C. Chan. 2018. “Exploring the Linkages Between the Adoption of BIM and Design Error Reduction.” International Journal of Sustainable Development and Planning 13 (1): 108–120.
  • Woodward, C., and M. Hakkarainen. 2011. “Mobile Mixed Reality System for Architectural and Construction Site Visualization. In Augmented Reality-Some Emerging Application Areas”; In Tech: Lyon, France.
  • Yap, J. B. H., H. A. Rahman, and C. Wang. 2017. “Design Change Dynamics in Building Project: From Literature Review to A Conceptual Framework Formulation.” Journal of Surveying, Construction and Property 8 (1): 13–33.
  • Yap, B. H. U., and M. Skitmore. 2018. “Investigating Design Changes in Malaysian Building Projects, Architectural Engineering and Design Management.” Architectural Engineering and Design Management 14 (3): 218–238.
  • Yuen, S. C., G. Yaoyuneyong, and E. Johnson. 2011. “Augmented Reality: An Overview and Five Directions for AR in Education.” Journal of Educational Technology Development and Exchange 4 (1): 119–140.
  • Zaher, M., D. Greenwood, and M. Marzouk. 2018. “Mobile Augmented Reality Applications for Construction Projects.” Construction Innovation 18 (2): 152–166.
  • Zamenopoulos, T., and K. Alexiou. 2005. “Linking Design and Complexity: A Review.” In Proceedings of the ECCS2005 Satellite Workshop: Embracing Complexity in Design – Paris, 91–102.
  • Zeng, S. X., G. X. Lou, and V. W. Tam. 2007. “Managing Information Flows for Quality Improvement of Projects.” Measuring Business Excellence 11 (3): 30–40.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.