50
Views
65
CrossRef citations to date
0
Altmetric
Original Articles

A framework for the study of due date management in job shops

&
Pages 685-695 | Received 01 Sep 1983, Published online: 30 Mar 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (21)

Swapnil Bhalla, Erlend Alfnes & Hans-Henrik Hvolby. (2023) Tools and practices for tactical delivery date setting in engineer-to-order environments: a systematic literature review. International Journal of Production Research 61:7, pages 2339-2371.
Read now
Douglas H. Grabenstetter & John M. Usher. (2014) Developing due dates in an engineer-to-order engineering environment. International Journal of Production Research 52:21, pages 6349-6361.
Read now
Yung-Chia Chang & Wen-Tso Huang. (2014) An enhanced model for SDBR in a random reentrant flow shop environment. International Journal of Production Research 52:6, pages 1808-1826.
Read now
Rui Zhang & Cheng Wu. (2012) A double-layered optimisation approach for the integrated due date assignment and scheduling problem. International Journal of Production Research 50:1, pages 5-22.
Read now
Matthias Thürer, Mark Stevenson & Cristovao Silva. (2011) Three decades of workload control research: a systematic review of the literature. International Journal of Production Research 49:23, pages 6905-6935.
Read now
Rahul Jagannath Patil. (2010) Due date management to improve customer satisfaction and profitability. International Journal of Logistics Research and Applications 13:4, pages 273-289.
Read now
Jose M. Framinan & Rainer Leisten. (2010) Available-to-promise (ATP) systems: a classification and framework for analysis. International Journal of Production Research 48:11, pages 3079-3103.
Read now
Kelli R. Robinson & Scott A. Moses. (2006) Effect of granularity of resource availability on the accuracy of due date assignment. International Journal of Production Research 44:24, pages 5391-5414.
Read now
S. Moses, H. Grant, L. Gruenwald & S. Pulat. (2004) Real-time due-date promising by build-to-order environments. International Journal of Production Research 42:20, pages 4353-4375.
Read now
SCOTTA. MOSES. (1999) Due date assignment using feedback control with reinforcement learning. IIE Transactions 31:10, pages 989-999.
Read now
V. B. GARGEYA & R. H. DEANE. (1996) Scheduling research in multiple resource constrained job shops: a review and critique. International Journal of Production Research 34:8, pages 2077-2097.
Read now
STEPHENR. LAWRENCE. (1995) Estimating flowtimes and setting due-dates in complex production systems. IIE Transactions 27:5, pages 657-668.
Read now
T. S. RAGHU & C. RAJENDRAN. (1995) Due-date setting methodologies based on simulated annealing—an experimental study in a real-life job shop. International Journal of Production Research 33:9, pages 2535-2554.
Read now
S. K. SIM, K. T. YEO & W. H. LEE. (1994) An expert neural network system for dynamic job shop scheduling. International Journal of Production Research 32:8, pages 1759-1773.
Read now
D. SUN & L. LIN. (1994) A dynamic job shop scheduling framework: a backward approach. International Journal of Production Research 32:4, pages 967-985.
Read now
T. C. E. CHENG. (1990) Analysis of material flow in a job shop with assembly operations. International Journal of Production Research 28:7, pages 1369-1383.
Read now
T. C. E. CHENG. (1989) ON A GENERALIZED OPTIMAL COMMON DUE-DATE ASSIGNMENT PROBLEM. Engineering Optimization 15:2, pages 113-119.
Read now
JOHNJ. KANET & DAVIDP. CHRISTY. (1989) Manufacturing systems with forbidden early shipment: Implications for setting manufacturing lead times. International Journal of Production Research 27:5, pages 783-792.
Read now
TIMOTHYD. FRY, MICHAELD. OLIFF, ELLIOTD. MINOR & G. KEONG LEONG. (1989) The effects of product structure and sequencing rule on assembly shop performance. International Journal of Production Research 27:4, pages 671-686.
Read now
D. McAREAVEY, J. HOEY & R. LEONARD. (1988) Designing the closed loop elements of a. material requirements planning system in a low volume, make-to-order company (with case study). International Journal of Production Research 26:7, pages 1141-1159.
Read now

Articles from other publishers (44)

Alexander Rokoss, Marius Syberg, Laura Tomidei, Christian Hülsing, Jochen Deuse & Matthias Schmidt. (2024) Case study on delivery time determination using a machine learning approach in small batch production companies. Journal of Intelligent Manufacturing.
Crossref
Helio Yochihiro Fuchigami & Bruno de Athayde Prata. (2023) Coronavirus Optimization Algorithms for Minimizing Earliness, Tardiness, and Anticipation of Due Dates in Permutation Flow Shop Scheduling. Arabian Journal for Science and Engineering 48:11, pages 15713-15745.
Crossref
Cristóvão Silva, Vera Ribeiro, Pedro Coelho, Vanessa Magalhães & Pedro Neto. (2017) Job Shop Flow Time Prediction using Neural Networks. Procedia Manufacturing 11, pages 1767-1773.
Crossref
Cenk ŞAHİN. (2016) Dinamik Teslim Zamanı Atama Problemi için Holonik Sistem Tasarımı. Çukurova Üniversitesi Mühendislik-Mimarlık Fakültesi Dergisi 31:1, pages 149-158.
Crossref
Hermela Solomon, Kassu Jilcha & Eshetie Berhan. 2015. Afro-European Conference for Industrial Advancement. Afro-European Conference for Industrial Advancement 283 292 .
Jiangtao Wang, Liwen Wang, Fei Ye, Xuejun Xu & Jianjun Yu. (2013) Order decision making based on different statement strategies under stochastic market demand. Journal of Systems Science and Systems Engineering 22:2, pages 171-190.
Crossref
V. Vinod & R. Sridharan. (2011) Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system. International Journal of Production Economics 129:1, pages 127-146.
Crossref
Adil Baykasoğlu & Mustafa Göçken. (2009) Gene expression programming based due date assignment in a simulated job shop. Expert Systems with Applications 36:10, pages 12143-12150.
Crossref
Adil Baykasoğlu, Mustafa Göçken & Zeynep D. Unutmaz. (2008) New approaches to due date assignment in job shops. European Journal of Operational Research 187:1, pages 31-45.
Crossref
M. Zorzini, D. Corti & A. Pozzetti. (2008) Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis. International Journal of Production Economics 112:2, pages 919-933.
Crossref
Donatella Corti, Alessandro Pozzetti & Marta Zorzini. (2006) A capacity-driven approach to establish reliable due dates in a MTO environment. International Journal of Production Economics 104:2, pages 536-554.
Crossref
Atakan Öztürk, Sinan Kayalıgil & Nur E. Özdemirel. (2006) Manufacturing lead time estimation using data mining. European Journal of Operational Research 173:2, pages 683-700.
Crossref
Bunthit Watanapa & Anulark Techanitisawad. (2005) Simultaneous price and due date settings for multiple customer classes. European Journal of Operational Research 166:2, pages 351-368.
Crossref
Susan A. Slotnick & Matthew J. Sobel. (2005) Manufacturing lead-time rules: Customer retention versus tardiness costs. European Journal of Operational Research 163:3, pages 825-856.
Crossref
C.T.Daniel Ng, T.C.Edwin Cheng, Mikhail Y. Kovalyov & S.S. Lam. (2003) Single machine scheduling with a variable common due date and resource-dependent processing times. Computers & Operations Research 30:8, pages 1173-1185.
Crossref
Scott Webster. (2007) Dynamic Pricing and Lead‐Time Policies for Make‐to‐Order Systems*. Decision Sciences 33:4, pages 579-600.
Crossref
D.P. Song, C. Hicks & C.F. Earl. (2002) Product due date assignment for complex assemblies. International Journal of Production Economics 76:3, pages 243-256.
Crossref
H. Grant, S. Moses & D. Goldsmann. (2002) Using simulation to evaluate buffer adjustment methods in order promising. Using simulation to evaluate buffer adjustment methods in order promising.
Emre A. Veral. (2001) Computer simulation of due-date setting in multi-machine job shops. Computers & Industrial Engineering 41:1, pages 77-94.
Crossref
Masaaki Ohba, Toshifumi Uetake & Hitoshi Tsubone. (2000) Logistics innovation in the film manufacturing industry. Integrated Manufacturing Systems 11:2, pages 121-127.
Crossref
Fred F Easton & Douglas R Moodie. (1999) Pricing and lead time decisions for make-to-order firms with contingent orders. European Journal of Operational Research 116:2, pages 305-318.
Crossref
A. Subash Babu. (1999) Strategies for enhancing agility of make‐to‐order manufacturing systems. International Journal of Agile Management Systems 1:1, pages 23-29.
Crossref
T.C.Edwin Cheng & Mikhail Y Kovalyov. (1999) Complexity of parallel machine scheduling with processing-plus-wait due dates to minimize maximum absolute lateness. European Journal of Operational Research 114:2, pages 403-410.
Crossref
Soroush H.M.. (1999) Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs. European Journal of Operational Research 113:2, pages 450-468.
Crossref
Chen Dewu, S. Li & Tang Guochun. (1997) Single machine scheduling with common due date assignment in a group technology environment. Mathematical and Computer Modelling 25:3, pages 81-90.
Crossref
T.C.Edwin Cheng & Mikhail Y. Kovalyov. (1996) Batch scheduling and common due-date assignment on a single machine. Discrete Applied Mathematics 70:3, pages 231-245.
Crossref
Stephen R. Lawrence. (1994) Negotiating due-dates between customers and producers. International Journal of Production Economics 37:1, pages 127-138.
Crossref
T.C.E. Cheng. (1994) Optimal Due‐date Assignment in an Assembly Shop. International Journal of Operations & Production Management 14:2, pages 31-42.
Crossref
Chung-Lun Li & T. C. E. Cheng. (1994) The parallel machine min-max weighted absolute lateness scheduling problem. Naval Research Logistics 41:1, pages 33-46.
Crossref
Prabuddha De, Jay B. Ghosh & Charles E. Wells. (1994) Due-date assignment and early/tardy scheduling on identical parallel machines. Naval Research Logistics 41:1, pages 17-32.
Crossref
T. C. E. Cheng & H. G. Kahlbacher. (1993) Single-machine scheduling to minimize earliness and number of tardy jobs. Journal of Optimization Theory and Applications 77:3, pages 563-573.
Crossref
Prabuddha De, Jay B. Ghosh & Charles E. Wells. (1993) Delivery time quotation and order processing with forbidden early shipments. Computers & Operations Research 20:4, pages 381-390.
Crossref
Imtiaz Ahmed & Warren W. Fisher. (2007) Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling*. Decision Sciences 23:3, pages 633-647.
Crossref
T.C.E. Cheng. (1992) Optimal single-machine sequencing and assignment of common due-dates. Computers & Industrial Engineering 22:2, pages 115-120.
Crossref
Prabuddha De, Jay B. Ghosh & Charles E. Wells. (1992) Optimal due-date assignment and sequencing. European Journal of Operational Research 57:3, pages 323-331.
Crossref
T.C.E. Cheng. (1991) Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine. European Journal of Operational Research 51:3, pages 348-353.
Crossref
Farzad Mahmoodi, Kevin J. Dooley & Patrick J. Starr. (2002) An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system. Journal of Operations Management 9:4, pages 548-573.
Crossref
S.W. McCarthy & K.D. Barber. (1990) Medium to short term finite capacity scheduling: A planning methodology for capacity constrained workshops. Engineering Costs and Production Economics 19:1-3, pages 189-199.
Crossref
T.C.E. Cheng. (1990) Dynamic programming approach to the single-machine sequencing problem with different due-dates. Computers & Mathematics with Applications 19:2, pages 1-7.
Crossref
L.C. Hendry & B.G. Kingsman. (1989) Production planning systems and their applicability to make-to-order companies. European Journal of Operational Research 40:1, pages 1-15.
Crossref
R. Haupt. (1989) A survey of priority rule-based scheduling. OR Spektrum 11:1, pages 3-16.
Crossref
Behnam Pourbabai. (1989) Effects of control strategies on the transient performance of an integrated manufacturing system. Robotics and Computer-Integrated Manufacturing 5:1, pages 83-89.
Crossref
T.C.E. Cheng & M.C. Gupta. (1989) Survey of scheduling research involving due date determination decisions. European Journal of Operational Research 38:2, pages 156-166.
Crossref
Behnam Pourbabai. 1989. CAD/CAM Robotics and Factories of the Future. CAD/CAM Robotics and Factories of the Future 385 389 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.