Younsoo Lee & Kyungsik Lee. (2023) Valid inequalities and extended formulations for lot-sizing and scheduling problem with sequence-dependent setups. European Journal of Operational Research 310:1, pages 201-216.
Crossref
Burcu KUBUR ÖZBEL & Adil BAYKASOĞLU. (2023) Dinamik parti büyüklüğü belirleme ve çizelgeleme problemi için bir matsezgisel geliştirilmesi ve uygulaması. Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi 39:1, pages 401-416.
Crossref
Seyda Topaloglu Yildiz, Sel Ozcan & Neslihan Cevik. (2023) Variable neighborhood search-based algorithms for the parallel machine capacitated lot-sizing and scheduling problem. Journal of Engineering Research, pages 100145.
Crossref
K. A. G. Araujo, E. G. Birgin, M. S. Kawamura & D. P. Ronconi. (2023) Relax-and-Fix Heuristics Applied to a Real-World Lot Sizing and Scheduling Problem in the Personal Care Consumer Goods Industry. Operations Research Forum 4:2.
Crossref
Yaliang Wang, Xinyu Fan, Chendi Ni, Kanghong Gao & Shousong Jin. (2022) Collaborative optimization of workshop layout and scheduling. Journal of Scheduling 26:1, pages 43-59.
Crossref
D. Leib, E. Finhold & T. Heller. 2023. Operations Research Proceedings 2022. Operations Research Proceedings 2022
567
572
.
A. Berthier, A. Yalaoui, H. Chehade, F. Yalaoui, L. Amodeo & C. Bouillot. (2022) Unrelated parallel machines scheduling with dependent setup times in textile industry. Computers & Industrial Engineering 174, pages 108736.
Crossref
J. Adan. (2022) A hybrid genetic algorithm for parallel machine scheduling with setup times. Journal of Intelligent Manufacturing 33:7, pages 2059-2073.
Crossref
Andrzej Gnatowski, Jarosław Rudy & Radosław Idzikowski. (2022) Scheduling Disjoint Setups in a Single-Server Permutation Flow Shop Manufacturing Process. Processes 10:9, pages 1837.
Crossref
Maedeh Bank, Mohammad Mahdavi Mazdeh, Mahdi Heydari & Ebrahim Teimoury. (2021) Coordinating lot sizing and integrated production and distribution scheduling with batch delivery and holding cost. Kybernetes 51:3, pages 1151-1179.
Crossref
Dominik Kress & David Müller. (2022) Semiconductor final-test scheduling under setup operator constraints. Computers & Operations Research 138, pages 105619.
Crossref
Desiree M. Carvalho & Mariá C.V. Nascimento. (2022) Hybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setup. European Journal of Operational Research 296:1, pages 158-173.
Crossref
Prita Meilanitasari & Seung-Jun Shin. (2021) A Review of Prediction and Optimization for Sequence-Driven Scheduling in Job Shop Flexible Manufacturing Systems. Processes 9:8, pages 1391.
Crossref
Hakeem‐Ur‐Rehman, Guohua Wan & Yang Zhan. (2019) Multi‐level, multi‐stage lot‐sizing and scheduling in the flexible flow shop with demand information updating. International Transactions in Operational Research 28:4, pages 2191-2217.
Crossref
Luciano P. Cota, Vitor N. Coelho, Frederico G. Guimarães & Marcone J. F. Souza. (2018) Bi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup times. International Transactions in Operational Research 28:2, pages 996-1017.
Crossref
Nathalie Klement, Mohamed Amine Abdeljaouad, Leonardo Porto & Cristóvão Silva. (2021) Lot-Sizing and Scheduling for the Plastic Injection Molding Industry—A Hybrid Optimization Approach. Applied Sciences 11:3, pages 1202.
Crossref
Victor C. B. Camargo, Bernardo Almada-Lobo & Franklina M. B. Toledo. (2021) INTEGRATED LOTSIZING, SCHEDULING AND BLENDING DECISIONS IN THE SPINNING INDUSTRY. Pesquisa Operacional 41:spe.
Crossref
Müjgan SAĞIR ÖZDEMİR & Hacer OKUL. (2020) SIRA BAĞIMLI HAZIRLIK SÜRELİ MELEZ ESNEK AKIŞ TİPİ ATÖLYELERDE ÇİZELGELEME PROBLEMİ İÇİN SINIRLI SAYIMLAMA VE MAKİNE GRUPLAMAYA DAYALI BİR YAKLAŞIMRESTRICTED ENUMERATION AND MACHINE GROUPING BASED APPROACH FOR HYBRID FLEXIBLE FLOW SHOP SCHEDULING PROBLEMS WITH SEQUENCE-DEPENDENT SETUP TIMES. Endüstri Mühendisliği 31:3, pages 337-352.
Crossref
Andreas Goerler, Eduardo Lalla-Ruiz & Stefan Voß. (2020) Late Acceptance Hill-Climbing Matheuristic for the General Lot Sizing and Scheduling Problem with Rich Constraints. Algorithms 13:6, pages 138.
Crossref
Seray Çakırgil, Eda Yücel & Gültekin Kuyzu. (2020) An integrated solution approach for multi-objective, multi-skill workforce scheduling and routing problems. Computers & Operations Research 118, pages 104908.
Crossref
Chen-Yang Cheng, Pourya Pourhejazy, Kuo-Ching Ying, Shu-Fen Li & Chieh-Wen Chang. (2020) Learning-Based Metaheuristic for Scheduling Unrelated Parallel Machines With Uncertain Setup Times. IEEE Access 8, pages 74065-74082.
Crossref
Simon Emde, Lukas Polten & Michel Gendreau. (2020) Logic-based benders decomposition for scheduling a batching machine. Computers & Operations Research 113, pages 104777.
Crossref
Nathalie Klement & Cristóvão Silva. 2020. Scheduling in Industry 4.0 and Cloud Manufacturing. Scheduling in Industry 4.0 and Cloud Manufacturing
167
192
.
Ali Ekici, Milad Elyasi, Okan Örsan Özener & Merve Burcu Sarıkaya. (2019) An application of unrelated parallel machine scheduling with sequence-dependent setups at Vestel Electronics. Computers & Operations Research 111, pages 130-140.
Crossref
Jingran Liang, Yuyan Wang, Zhi-Hai Zhang & Yiqi Sun. (2019) Energy efficient production planning and scheduling problem with processing technology selection. Computers & Industrial Engineering 132, pages 260-270.
Crossref
Shuo Chen, Regina Berretta, Alistair Clark & Pablo Moscato. 2019. Reference Module in Food Science. Reference Module in Food Science.
Douglas Alem, Eduardo Curcio, Pedro Amorim & Bernardo Almada-Lobo. (2018) A computational study of the general lot-sizing and scheduling model under demand uncertainty via robust and stochastic approaches. Computers & Operations Research 90, pages 125-141.
Crossref
Absalom E. Ezugwu & Francis Akutsah. (2018) An Improved Firefly Algorithm for the Unrelated Parallel Machines Scheduling Problem With Sequence-Dependent Setup Times. IEEE Access 6, pages 54459-54478.
Crossref
A. Sioud & C. Gagné. (2018) Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times. European Journal of Operational Research 264:1, pages 66-73.
Crossref
Cristovao Silva, Nathalie Klement & Olivier Gibaru. 2018. Closing the Gap Between Practice and Research in Industrial Engineering. Closing the Gap Between Practice and Research in Industrial Engineering
131
138
.
M. Diaz-Madroñero, J. Mula, B. Andres, R. Poler & S. Sanchis. 2018. Closing the Gap Between Practice and Research in Industrial Engineering. Closing the Gap Between Practice and Research in Industrial Engineering
121
129
.
Simon Thevenin, Nicolas Zufferey & Rémy Glardon. (2017) Model and metaheuristics for a scheduling problem integrating procurement, sale and distribution decisions. Annals of Operations Research 259:1-2, pages 437-460.
Crossref
Antonio Costa, Fulvio Antonio Cappadonna & Sergio Fichera. (2015) A hybrid genetic algorithm for minimizing makespan in a flow-shop sequence-dependent group scheduling problem. Journal of Intelligent Manufacturing 28:6, pages 1269-1283.
Crossref
Luciano Perdigao Cota, Frederico Gadelha Guimaraes, Fernando B. de Oliveira & Marcone J. Freitas Souza. (2017) An Adaptive Large Neighborhood Search with Learning Automata for the Unrelated Parallel Machine Scheduling Problem. An Adaptive Large Neighborhood Search with Learning Automata for the Unrelated Parallel Machine Scheduling Problem.
Lalida Deeratanasrikul & Shinji Mizuno. (2017) Multiple-stage multiple-machine capacitated lot-sizing and scheduling with sequence-dependent setup: A case study in the wheel industry. Journal of Industrial & Management Optimization 13:1, pages 413-428.
Crossref
Cristóvão Silva & Nathalie Klement. (2017) Solving a Multi-periods Job-shop Scheduling Problem using a Generic Decision Support Tool. Procedia Manufacturing 11, pages 1759-1766.
Crossref
Nathalie Klement, Cristóvão Silva & Olivier Gibaru. (2017) A Generic Decision Support Tool to Planning and Assignment Problems: Industrial Application & Industry 4.0. Procedia Manufacturing 11, pages 1684-1691.
Crossref
Karina Copil, Martin Wörbelauer, Herbert Meyr & Horst Tempelmeier. (2016) Simultaneous lotsizing and scheduling problems: a classification and review of models. OR Spectrum 39:1, pages 1-64.
Crossref
Xiujuan Xu, Yu Liu, Ruixin Ma & Quan Z. Sheng. 2017. Cooperative Design, Visualization, and Engineering. Cooperative Design, Visualization, and Engineering
236
243
.
Aymen Sioud & Caroline Gagne. (2016) An MBO algorithm for a flow shop problem with sequence-dependent setup times. An MBO algorithm for a flow shop problem with sequence-dependent setup times.
Janis S. Neufeld, Jatinder N.D. Gupta & Udo Buscher. (2016) A comprehensive review of flowshop group scheduling literature. Computers & Operations Research 70, pages 56-74.
Crossref
Pankaj Sharma & Ajai Jain. (2015) A review on job shop scheduling with setup times. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 230:3, pages 517-533.
Crossref
S. Afshin Mansouri, Emel Aktas & Umut Besikci. (2016) Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption. European Journal of Operational Research 248:3, pages 772-788.
Crossref
René van Bevern & Artem V. Pyatkin. 2016. Computer Science – Theory and Applications. Computer Science – Theory and Applications
73
87
.
Cheng-Dar Liou & Yi-Chih Hsieh. (2015) A hybrid algorithm for the multi-stage flow shop group scheduling with sequence-dependent setup and transportation times. International Journal of Production Economics 170, pages 258-267.
Crossref
Adam Fleischhacker, Bintong Chen, Hemant Kher, Mariano Mazal & Bob Pfender. (2015) Practice Summary: Capacity Planning in the Presence of Sequence-Dependent Setups at AstraZeneca Pharmaceuticals. Interfaces 45:4, pages 358-362.
Crossref
M. Karimi-Nasab & M. Modarres. (2015) Lot sizing and job shop scheduling with compressible process times: A cut and branch approach. Computers & Industrial Engineering 85, pages 196-205.
Crossref
Tamer F. Abdelmaguid. (2015) A neighborhood search function for flexible job shop scheduling with separable sequence-dependent setup times. Applied Mathematics and Computation 260, pages 188-203.
Crossref
Christian Almeder, Diego Klabjan, Renate Traxler & Bernardo Almada-Lobo. (2015) Lead time considerations for the multi-level capacitated lot-sizing problem. European Journal of Operational Research 241:3, pages 727-738.
Crossref
M. Karimi-Nasab, M. Modarres & S.M. Seyedhoseini. (2015) A self-adaptive PSO for joint lot sizing and job shop scheduling with compressible process times. Applied Soft Computing 27, pages 137-147.
Crossref
Geun-Cheol Lee, Jung Man Hong & Seong-Hoon Choi. (2015) Efficient Heuristic Algorithm for Scheduling Two-Stage Hybrid Flowshop with Sequence-Dependent Setup Times. Mathematical Problems in Engineering 2015, pages 1-10.
Crossref
Sergio Fichera, Antonio Costa & Fulvio Cappadonna. (2015) Scheduling Jobs Families with Learning Effect on the Setup. Advances in Operations Research 2015, pages 1-12.
Crossref
Luis Guimarães, Diego Klabjan & Bernardo Almada-Lobo. (2014) Modeling lotsizing and scheduling problems with sequence dependent setups. European Journal of Operational Research 239:3, pages 644-662.
Crossref
Christian Schoppmeyer, Subanatarajan Subbiah, Josè Manuel De La Fuente Valdès & Sebastian Engell. (2014) Dynamic Scheduling of Shuttle Robots in the Warehouse of a Polymer Plant Based on Dynamically Configured Timed Automata Models. Industrial & Engineering Chemistry Research 53:44, pages 17135-17154.
Crossref
Emre Cevikcan & M. Bulent Durmusoglu. (2014) An integrated job release and scheduling approach on parallel machines: An application in electric wire-harness industry. Computers & Industrial Engineering 76, pages 318-332.
Crossref
Christoph H. Glock, Eric H. Grosse & Jörg M. Ries. (2014) The lot sizing problem: A tertiary study. International Journal of Production Economics 155, pages 39-51.
Crossref
Antonio Costa, Fulvio Cappadonna & Sergio Fichera. (2014) A Hybrid Metaheuristic Approach for Minimizing the Total Flow Time in A Flow Shop Sequence Dependent Group Scheduling Problem. Algorithms 7:3, pages 376-396.
Crossref
P. Amorim, A. M. Costa & B. Almada-Lobo. (2013) Influence of consumer purchasing behaviour on the production planning of perishable food. OR Spectrum 36:3, pages 669-692.
Crossref
Hans-Otto Günther. (2014) The block planning approach for continuous time-based dynamic lot sizing and scheduling. Business Research 7:1, pages 51-76.
Crossref
Victor C.B. Camargo, Franklina M.B. Toledo & Bernardo Almada-Lobo. (2014) HOPS – Hamming-Oriented Partition Search for production planning in the spinning industry. European Journal of Operational Research 234:1, pages 266-277.
Crossref
Jean-Paul Arnaout, Rami Musa & Ghaith Rabadi. (2012) A two-stage Ant Colony optimization algorithm to minimize the makespan on unrelated parallel machines—part II: enhancements and experimentations. Journal of Intelligent Manufacturing 25:1, pages 43-53.
Crossref
Duygu Yilmaz Eroglu & H. Cenk Ozmutlu. (2014) MIP Models and Hybrid Algorithms for Simultaneous Job Splitting and Scheduling on Unrelated Parallel Machines. The Scientific World Journal 2014, pages 1-19.
Crossref
Harlem M. M. Villadiego, José Elías C. Arroyo & André Gustavo dos Santos. 2014. Evolutionary Computation in Combinatorial Optimisation. Evolutionary Computation in Combinatorial Optimisation
61
72
.
Aymen Sioud, Caroline Gagné & Marc Gravel. 2014. Swarm Intelligence Based Optimization. Swarm Intelligence Based Optimization
9
25
.
M. Karimi-Nasab & S.M. Seyedhoseini. (2013) Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approach. European Journal of Operational Research 231:3, pages 598-616.
Crossref
Luis Guimarães, Diego Klabjan & Bernardo Almada-Lobo. (2013) Pricing, relaxing and fixing under lot sizing and scheduling. European Journal of Operational Research 230:2, pages 399-411.
Crossref
Herbert Meyr & Matthias Mann. (2013) A decomposition approach for the General Lotsizing and Scheduling Problem for Parallel production Lines. European Journal of Operational Research 229:3, pages 718-731.
Crossref
I-Lin Wang, Yi-Chi Wang & Chih-Wei Chen. (2012) Scheduling unrelated parallel machines in semiconductor manufacturing by problem reduction and local search heuristics. Flexible Services and Manufacturing Journal 25:3, pages 343-366.
Crossref
Negin Dehghanian & S. Mahdi Homayouni. (2013) A fuzzy-genetic algorithm for a re-entrant job shop scheduling problem with sequence-dependent setup times. A fuzzy-genetic algorithm for a re-entrant job shop scheduling problem with sequence-dependent setup times.
Patroklos Georgiadis & Alexandra Politou. (2013) Dynamic Drum-Buffer-Rope approach for production planning and control in capacitated flow-shop manufacturing systems. Computers & Industrial Engineering 65:4, pages 689-703.
Crossref
Kseniya Schemeleva, Xavier Delorme, Alexandre Dolgui, Frédéric Grimaud & Mikhail Y. Kovalyov. (2013) Lot-sizing on a single imperfect machine: ILP models and FPTAS extensions. Computers & Industrial Engineering 65:4, pages 561-569.
Crossref
Arif A. Anwar & Zia Ul Haq. (2012) Genetic algorithms for the sequential irrigation scheduling problem. Irrigation Science 31:4, pages 815-829.
Crossref
Aymen Sioud, Marc Gravel & Caroline Gagne. (2013) A genetic algorithm for solving a hybrid flexible flowshop with sequence dependent setup times. A genetic algorithm for solving a hybrid flexible flowshop with sequence dependent setup times.
P. Amorim, T. Pinto-Varela, B. Almada-Lobo & A.P.F.D. Barbósa-Póvoa. (2013) Comparing models for lot-sizing and scheduling of single-stage continuous processes: Operations research and process systems engineering approaches. Computers & Chemical Engineering 52, pages 177-192.
Crossref
Bradley E. Anderson, James D. Blocher, Kurt M. Bretthauer & Munirpallam A. Venkataramanan. (2013) An efficient network-based formulation for sequence dependent setup scheduling on parallel identical machines. Mathematical and Computer Modelling 57:3-4, pages 483-493.
Crossref
F. Seeanner, B. Almada-Lobo & H. Meyr. (2013) Combining the principles of variable neighborhood decomposition search and the fix&optimize heuristic to solve multi-level lot-sizing and scheduling problems. Computers & Operations Research 40:1, pages 303-317.
Crossref
Florian Seeanner & Herbert Meyr. (2012) Multi-stage simultaneous lot-sizing and scheduling for flow line production. OR Spectrum 35:1, pages 33-73.
Crossref
K. Schemeleva, X. Delorme, A. Dolgui & F. Grimaud. (2012) Multi-product sequencing and lot-sizing under uncertainties: A memetic algorithm. Engineering Applications of Artificial Intelligence 25:8, pages 1598-1610.
Crossref
Songsong Liu, Nilay Shah & Lazaros G. Papageorgiou. (2012) Multiechelon supply chain planning with sequence‐dependent changeovers and price elasticity of demand under uncertainty. AIChE Journal 58:11, pages 3390-3403.
Crossref
A. Sioud, M. Gravel & C. Gagné. (2012) A hybrid genetic algorithm for the single machine scheduling problem with sequence-dependent setup times. Computers & Operations Research 39:10, pages 2415-2424.
Crossref
Mauricio Dieguez, Samuel Sepulveda & Carlos Cares. (2012) On Optimizing the Path to Information Security Compliance. On Optimizing the Path to Information Security Compliance.
Pilar I. Vidal-Carreras, Jose P. Garcia-Sabater & Jairo R. Coronado-Hernandez. (2012) Economic lot scheduling with deliberated and controlled coproduction. European Journal of Operational Research 219:2, pages 396-404.
Crossref
K. Schemeleva, X. Delorme, A. Dolgui, F. Grimaud & M.Y. Kovalyov. (2012) Production Lot Sizes on a Single Imperfect Machine: FPTAS vs ILP models. IFAC Proceedings Volumes 45:6, pages 590-595.
Crossref
Deisemara Ferreira, Alistair R. Clark, Bernardo Almada-Lobo & Reinaldo Morabito. (2012) Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production. International Journal of Production Economics 136:2, pages 255-265.
Crossref
Payman Jula & Ishai Kones. (2011) Scheduling a single machine to maintain a dynamic WIP profile in coordinated manufacturing chains. The International Journal of Advanced Manufacturing Technology 59:9-12, pages 1167-1179.
Crossref
Poorya Farahani, M. Grunow & H.-O. Günther. (2011) Integrated production and distribution planning for perishable food products. Flexible Services and Manufacturing Journal 24:1, pages 28-51.
Crossref
Kangbok Lee, Lei Lei & Michael Pinedo. (2012) Production scheduling with history‐dependent setup times. Naval Research Logistics (NRL) 59:1, pages 58-68.
Crossref
Xinchang Hao, Hao Wen Lin, Xili Chen & Tomohiro Murata. (2012) Cooperative Bayesian Optimization Algorithm: a Novel Approach to Multiple Resources Scheduling Problem. IEEJ Transactions on Electronics, Information and Systems 132:12, pages 2007-2018.
Crossref
Nabil Absi, Stéphane Dauzère-Pérès & Safia Kedad-Sidhoum. 2012. Just-in-Time Systems. Just-in-Time Systems
191
207
.
Ross J.W. James & Bernardo Almada-Lobo. (2011) Single and parallel machine capacitated lotsizing and scheduling: New iterative MIP-based neighborhood search heuristics. Computers & Operations Research 38:12, pages 1816-1825.
Crossref
Jan Christian Lang & Zuo-Jun Max Shen. (2011) Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions. European Journal of Operational Research 214:3, pages 595-605.
Crossref
Ik-Soo Shim, Hyeok-Chol Kim, Hyoung-Ho Doh & Dong-Ho Lee. (2011) A two-stage heuristic for single machine capacitated lot-sizing and scheduling with sequence-dependent setup costs. Computers & Industrial Engineering 61:4, pages 920-929.
Crossref
Nasser Salmasi, Rasaratnam Logendran & Mohammad Reza Skandari. (2011) Makespan minimization of a flowshop sequence-dependent group scheduling problem. The International Journal of Advanced Manufacturing Technology 56:5-8, pages 699-710.
Crossref
Wing-Kwan Yeung, Tsan-Ming Choi & T.C.E. Cheng. (2011) Supply chain scheduling and coordination with dual delivery modes and inventory storage cost. International Journal of Production Economics 132:2, pages 223-229.
Crossref
Mohammad Mohammadi & Niloofar Jafari. (2010) A new mathematical model for integrating lot sizing, loading, and scheduling decisions in flexible flow shops. The International Journal of Advanced Manufacturing Technology 55:5-8, pages 709-721.
Crossref
Umar M. Al-TurkiShaikh ArifusalamMohammed El-SeliamanMehmood Khan. (2011) Resource Allocation, Batching and Dispatching in a Stochastic Flexible Job Shop. Advanced Materials Research 264-265, pages 1758-1763.
Crossref
António Aroso Menezes, Alistair Clark & Bernardo Almada-Lobo. (2010) Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups. Journal of Scheduling 14:2, pages 209-219.
Crossref
J Pahl, S Voss & D L Woodruff. (2011) Discrete Lot-Sizing and Scheduling with Sequence-Dependent Setup Times and Costs Including Deterioration and Perishability Constraints. Discrete Lot-Sizing and Scheduling with Sequence-Dependent Setup Times and Costs Including Deterioration and Perishability Constraints.
Hubert Missbauer, Wolfgang Hauber & Werner Stadler. 2011. Planning Production and Inventories in the Extended Enterprise. Planning Production and Inventories in the Extended Enterprise
461
488
.
Jean-Paul Arnaout, Ghaith Rabadi & Rami Musa. (2009) A two-stage Ant Colony Optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times. Journal of Intelligent Manufacturing 21:6, pages 693-701.
Crossref
Charles Sung & Christos T. Maravelias. 2010. Process Systems Engineering. Process Systems Engineering
269
284
.
Mohammad Mohammadi. (2010) Integrating lotsizing, loading, and scheduling decisions in flexible flow shops. The International Journal of Advanced Manufacturing Technology 50:9-12, pages 1165-1174.
Crossref
B. Bilgen & H.-O. Günther. (2009) Integrated production and distribution planning in the fast moving consumer goods industry: a block planning application. OR Spectrum 32:4, pages 927-955.
Crossref
Kun Fan & Ren-qian Zhang. (2010) Notice of Retraction: An analysis of research in job shop scheduling problem (2000–2009). Notice of Retraction: An analysis of research in job shop scheduling problem (2000–2009).
M. Mohammadi, S. A. Torabi, S. M. T. Fatemi Ghomi & B. Karimi. (2009) A new algorithmic approach for capacitated lot-sizing problem in flow shops with sequence-dependent setups. The International Journal of Advanced Manufacturing Technology 49:1-4, pages 201-211.
Crossref
Geraldo R. Mateus, Martín G. Ravetti, Maurício C. de Souza & Taís M. Valeriano. (2009) Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration. Journal of Scheduling 13:3, pages 245-259.
Crossref
K. Shchamialiova, A. Dolgui & F. Grimaud. (2010) Solution Methods for a Multi-Product Lot-Sizing and Sequencing Problem in a Flow-shop. IFAC Proceedings Volumes 43:8, pages 244-249.
Crossref
Nasser Salmasi, Rasaratnam Logendran & Mohammad Reza Skandari. (2010) Total flow time minimization in a flowshop sequence-dependent group scheduling problem. Computers & Operations Research 37:1, pages 199-212.
Crossref
J. Christian LangJ. Christian Lang. 2010. Production and Inventory Management with Substitutions. Production and Inventory Management with Substitutions
9
79
.
A. Dolgui, F. Grimaud & K. Shchamialiova. 2010. Artificial Intelligence Techniques for Networked Manufacturing Enterprises Management. Artificial Intelligence Techniques for Networked Manufacturing Enterprises Management
181
220
.
C. Gicquel, N. Miègeville, M. Minoux & Y. Dallery. (2009) Discrete lot sizing and scheduling using product decomposition into attributes. Computers & Operations Research 36:9, pages 2690-2698.
Crossref
Jairo R. Montoya-Torres, Milton Soto-Ferrari, Fernando Gonzalez-Solano & Edgar H. Alfonso-Lizarazo. (2009) Machine scheduling with sequence-dependent setup times using a randomized search heuristic. Machine scheduling with sequence-dependent setup times using a randomized search heuristic.
Georgios M. Kopanos, José Miguel Laínez & Luis Puigjaner. (2009) An Efficient Mixed-Integer Linear Programming Scheduling Framework for Addressing Sequence-Dependent Setup Issues in Batch Plants. Industrial & Engineering Chemistry Research 48:13, pages 6346-6357.
Crossref
Tsung-Che Chiang & Li-Chen Fu. (2009) Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times. European Journal of Operational Research 196:1, pages 78-92.
Crossref
Uday K. Chakraborty. (2009) Minimizing total flow time in permutation flow shop scheduling with improved simulated annealing. Minimizing total flow time in permutation flow shop scheduling with improved simulated annealing.
Adeline T.H. Ang, Appa Iyer Sivakumar & Chao Qi. (2009) Criteria selection and analysis for single machine dynamic on-line scheduling with multiple objectives and sequence-dependent setups. Computers & Industrial Engineering 56:4, pages 1223-1231.
Crossref
S. Afshin Mansouri, S. Hamed Hendizadeh & Nasser Salmasi. (2008) Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times. The International Journal of Advanced Manufacturing Technology 40:11-12, pages 1216-1226.
Crossref
Alexandre Dolgui, Anton V. Eremeev, Mikhail Y. Kovalyov & Pavel M. Kuznetsov. (2009) Multi-product lot-sizing and scheduling on unrelated parallel machines to minimize makespan. IFAC Proceedings Volumes 42:4, pages 828-833.
Crossref
Hehua Zhang & Ming Gu. (2009) Modeling job shop scheduling with batches and setup times by timed Petri nets. Mathematical and Computer Modelling 49:1-2, pages 286-294.
Crossref
S. Marimuthu, S.G. Ponnambalam & N. Jawahar. (2009) Threshold accepting and Ant-colony optimization algorithms for scheduling m-machine flow shops with lot streaming. Journal of Materials Processing Technology 209:2, pages 1026-1041.
Crossref
Vincent A. Cicirello. 2009. Applications of Soft Computing. Applications of Soft Computing
189
198
.
Charles Sung & Christos T. Maravelias. (2008) A mixed-integer programming formulation for the general capacitated lot-sizing problem. Computers & Chemical Engineering 32:1-2, pages 244-259.
Crossref
Adeline T. H. Ang & Appa Iyer Sivakumar. (2007) Online multiobjective single machine dynamic scheduling with sequence-dependent setups using simulation-based genetic algorithm with desirability function. Online multiobjective single machine dynamic scheduling with sequence-dependent setups using simulation-based genetic algorithm with desirability function.
Charles Sung & Christos T. Maravelias. 2007. Process Systems Engineering. Process Systems Engineering
269
284
.
Nilanjan D. Choudhury, Wilbert E. Wilhelm, Brijesh Rao, Jonathan Gott & Nikhilesh Khotekar. (2007) Process planning for circuit card assembly on a series of dual head placement machines. European Journal of Operational Research 182:2, pages 626-639.
Crossref