327
Views
118
CrossRef citations to date
0
Altmetric
Original Articles

Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times

&
Pages 1243-1263 | Received 01 Apr 1993, Published online: 07 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (18)

Hyun-Jung Kim, Eun-Seok Kim, Jun-Ho Lee, Lixin Tang & Yang Yang. (2022) Single-machine scheduling with energy generation and storage systems. International Journal of Production Research 60:23, pages 7033-7052.
Read now
Yue Zhao & Gongshu Wang. (2020) A dynamic differential evolution algorithm for the dynamic single-machine scheduling problem with sequence-dependent setup times. Journal of the Operational Research Society 71:2, pages 225-236.
Read now
Sicheng Zhang & T.N. Wong. (2016) Studying the impact of sequence-dependent set-up times in integrated process planning and scheduling with E-ACO heuristic. International Journal of Production Research 54:16, pages 4815-4838.
Read now
Wenyou Jia, Zhibin Jiang & You Li. (2015) Combined scheduling algorithm for re-entrant batch-processing machines in semiconductor wafer manufacturing. International Journal of Production Research 53:6, pages 1866-1879.
Read now
Zhufeng Gao, Jonathan F. Bard, Rodolfo Chacon & John Stuber. (2015) An assignment-sequencing methodology for scheduling assembly and test operations with multi-pass requirements. IIE Transactions 47:2, pages 153-172.
Read now
Jie Chen & F. Frank Chen. (2008) Adaptive scheduling and tool flow control in flexible job shops. International Journal of Production Research 46:15, pages 4035-4059.
Read now
T. Freed, K. H. Doerr & T. Chang. (2007) In-house development of scheduling decision support systems: case study for scheduling semiconductor device test operations. International Journal of Production Research 45:21, pages 5075-5093.
Read now
Xiaoyan Zhu & WilbertE. Wilhelm. (2006) Scheduling and lot sizing with sequence-dependent setup: A literature review. IIE Transactions 38:11, pages 987-1007.
Read now
P Corry & E Kozan. (2004) Job scheduling with technical constraints. Journal of the Operational Research Society 55:2, pages 160-169.
Read now
J. T. Lin, F. K. Wang & W. T. Lee. (2004) Capacity-constrained scheduling for a logic IC final test facility. International Journal of Production Research 42:1, pages 79-99.
Read now
Dong Chen, PeterB. Luh, LakshmanS. Thakur & Jack Moreno$suffix/text()$suffix/text(). (2003) Optimization-based manufacturing scheduling with multiple resources, setup requirements, and transfer lots. IIE Transactions 35:10, pages 973-985.
Read now
XIAOQING SUN, JAMESS. NOBLE & CERRYM. KLEIN. (1999) Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness. IIE Transactions 31:2, pages 113-124.
Read now
Lames T. Lin & Sheng-Chih Huang. (1998) 開發平行機台製造單元之多目標排程輔助系統. Journal of the Chinese Institute of Industrial Engineers 15:3, pages 205-216.
Read now
SANJAYV. MEHTA & REHA UZSOY. (1998) Minimizing total tardiness on a batch processing machine with incompatible job families. IIE Transactions 30:2, pages 165-178.
Read now
I. M. OVACIK & R. UZSOY. (1995) Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times. International Journal of Production Research 33:11, pages 3173-3192.
Read now
R. UZSOY. (1995) Scheduling batch processing machines with incompatible job families. International Journal of Production Research 33:10, pages 2685-2708.
Read now
Myungho Lee, Kyungduk Moon, Kangbok Lee, Juntaek Hong & Michael Pinedo. A critical review of planning and scheduling in steel-making and continuous casting in the steel industry. Journal of the Operational Research Society 0:0, pages 1-35.
Read now

Articles from other publishers (100)

Rafael Morais, Teobaldo Bulhões & Anand Subramanian. (2024) Exact and heuristic algorithms for minimizing the makespan on a single machine scheduling problem with sequence-dependent setup times and release dates. European Journal of Operational Research 315:2, pages 442-453.
Crossref
Amir Hosseini, Alena Otto & Erwin Pesch. (2024) Scheduling in manufacturing with transportation: Classification and solution techniques. European Journal of Operational Research 315:3, pages 821-843.
Crossref
Daniela BorissovaDaniela Borissova. 2024. Decision-Making in Design, Maintenance, Planning, and Investment of Wind Energy. Decision-Making in Design, Maintenance, Planning, and Investment of Wind Energy 165 205 .
Kim Van Den Houten, Mathijs de Weerdt, David M. J. Tax, Esteban Freydell, Eva Christoupoulou & Alessandro Nati. (2023) Rolling-Horizon Simulation Optimization For A Multi-Objective Biomanufacturing Scheduling Problem. Rolling-Horizon Simulation Optimization For A Multi-Objective Biomanufacturing Scheduling Problem.
Eiji Morinaga, Kenta Teramoto & Hidefumi Wakamatsu. 2023. Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures. Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures 576 590 .
Antonio Costa & Victor Fernandez-Viagas. (2022) A modified harmony search for the T-single machine scheduling problem with variable and flexible maintenance. Expert Systems with Applications 198, pages 116897.
Crossref
Dominik Kress & David Müller. (2022) Semiconductor final-test scheduling under setup operator constraints. Computers & Operations Research 138, pages 105619.
Crossref
Huimin Zhang, Shukai Li, Yihui Wang, Lixing Yang & Ziyou Gao. (2021) Collaborative real-time optimization strategy for train rescheduling and track emergency maintenance of high-speed railway: A Lagrangian relaxation-based decomposition algorithm. Omega 102, pages 102371.
Crossref
Jian Zhang, Tingming Deng, Haifan Jiang, Haojie Chen, Shengfeng Qin & Guofu Ding. (2021) Bi-level dynamic scheduling architecture based on service unit digital twin agents. Journal of Manufacturing Systems 60, pages 59-79.
Crossref
Mauro Gaggero & Flavio Tonelli. (2020) A two‐step optimization model for the distribution of perishable products. Networks 78:1, pages 69-87.
Crossref
Victor Fernandez-Viagas & Antonio Costa. (2021) Two novel population based algorithms for the single machine scheduling problem with sequence dependent setup times and release times. Swarm and Evolutionary Computation 63, pages 100869.
Crossref
Francisco Angel-Bello, Jobish Vallikavungal & Ada Alvarez. (2021) Two approaches to handle the dynamism in a scheduling problem with sequence-dependent setup times. Expert Systems with Applications 167, pages 114137.
Crossref
Francisco Angel-Bello, Jobish Vallikavungal & Ada Alvarez. (2021) Fast and efficient algorithms to handle the dynamism in a single machine scheduling problem with sequence-dependent setup times. Computers & Industrial Engineering 152, pages 106984.
Crossref
Wolfgang AlbrechtWolfgang Albrecht. 2021. Scheduling in Green Supply Chain Management. Scheduling in Green Supply Chain Management 9 19 .
Emily A. Heath, John E. Mitchell & Thomas C. Sharkey. (2019) Scheduling of tasks with effectiveness precedence constraints. Optimization Letters 14:1, pages 37-49.
Crossref
Jiaxin Fan, Damla Kizilay, Hande Oztop, Mehmet Fatih Tasgetiren & Liang Gao. (2019) A Variable Block Insertion Heuristic for Single Machine with Release Dates and Sequence Dependent Setup Times for Makespan Minimization. A Variable Block Insertion Heuristic for Single Machine with Release Dates and Sequence Dependent Setup Times for Makespan Minimization.
Aldo Bischi, Leonardo Taccari, Emanuele Martelli, Edoardo Amaldi, Giampaolo Manzolini, Paolo Silva, Stefano Campanari & Ennio Macchi. (2019) A rolling-horizon optimization algorithm for the long term operational scheduling of cogeneration systems. Energy 184, pages 73-90.
Crossref
Jian Chen, Meilin Wang, Xiang T. R. Kong, George Q. Huang, Qinyun Dai & Guoqiang Shi. (2017) Manufacturing synchronization in a hybrid flowshop with dynamic order arrivals. Journal of Intelligent Manufacturing 30:7, pages 2659-2668.
Crossref
Ágota Bányai, Béla Illés, Elke Glistau, Norge Isaias Coello Machado, Péter Tamás, Faiza Manzoor & Tamás Bányai. (2019) Smart Cyber-Physical Manufacturing: Extended and Real-Time Optimization of Logistics Resources in Matrix Production. Applied Sciences 9:7, pages 1287.
Crossref
M. Fatih Tasgetiren, Uğur Eliiyi, Hande Öztop, Damla Kizilay & Quan-Ke Pan. (2018) An energy-efficient single machine scheduling with release dates and sequence-dependent setup times. An energy-efficient single machine scheduling with release dates and sequence-dependent setup times.
Yi-Kuei Lin & Thi-Phuong Nguyen. (2018) Reliability evaluation of a multistate flight network under time and stopover constraints. Computers & Industrial Engineering 115, pages 620-630.
Crossref
Maria L.R. Varela, Justyna Trojanowska, Silvio Carmo-Silva, Natalia M.L. Costa & Jose Machado. (2017) Comparative Simulation Study of Production Scheduling in the Hybrid and the Parallel Flow. Management and Production Engineering Review 8:2, pages 69-80.
Crossref
Jie Zhang. 2017. Multi‐Agent‐Based Production Planning and Control. Multi‐Agent‐Based Production Planning and Control 143 195 .
Chih-Hua Hsu & Haw-Ching Yang. (2017) Real-Time Near-Optimal Scheduling With Rolling Horizon for Automatic Manufacturing Cell. IEEE Access 5, pages 3369-3375.
Crossref
Young Min Joung, Tian He, Sang Won Yoon, Ravi Vancheeswaran, Cecille Abela & Herwina R. Andres. (2017) Multi-pass Lot Scheduling Algorithm for Maximizing Throughput at Semiconductor Final Test Facilities. Procedia Manufacturing 11, pages 1992-2000.
Crossref
Mario C. Vélez-Gallego, Jairo Maya & Jairo R. Montoya-Torres. (2016) A beam search heuristic for scheduling a single machine with release dates and sequence dependent setup times to minimize the makespan. Computers & Operations Research 73, pages 132-140.
Crossref
Xiaochuang Jin, Mengzhi Zhong, Xiongwen Quan, Siyuan Li & Heng Zhang. (2016) Dynamic scheduling of mobile-robotic warehouse logistics system. Dynamic scheduling of mobile-robotic warehouse logistics system.
Irina S. Dolinskaya, Marina A. Epelman, Esra Şişikoğlu Sir & Robert L. Smith. (2015) Parameter-Free Sampled Fictitious Play for Solving Deterministic Dynamic Programming Problems. Journal of Optimization Theory and Applications 169:2, pages 631-655.
Crossref
Serhat Gul, Brian T. Denton & John W. Fowler. (2015) A Progressive Hedging Approach for Surgery Planning Under Uncertainty. INFORMS Journal on Computing 27:4, pages 755-772.
Crossref
Patrick Jochem, Martin Schönfelder & Wolf Fichtner. (2015) An efficient two-stage algorithm for decentralized scheduling of micro-CHP units. European Journal of Operational Research 245:3, pages 862-874.
Crossref
Tian-Hua Jiang & Hao-Xiang Wang. (2014) Study on the self-evolution problem of an aircraft-engine assembly workshop with uncertain number of assembly times. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 229:8, pages 1418-1428.
Crossref
Xiaonan Niu, Hong Tang, Lixin Wu, Run Deng & Xuejun Zhai. (2015) Imaging-Duration Embedded Dynamic Scheduling of Earth Observation Satellites for Emergent Events. Mathematical Problems in Engineering 2015, pages 1-31.
Crossref
Ying Ying Yu & Bing Wang. (2014) Partial Rescheduling Based on Branch and Bound for Single-Machine Problem. Advanced Materials Research 1039, pages 506-513.
Crossref
Jian Wang, Lekai Lian, Xiaolong Wang, Shu Jiangzhou & Ping Li. (2014) Rolling horizon scheduling procedure for SWRO desalination plant under uncertain freshwater demand. Rolling horizon scheduling procedure for SWRO desalination plant under uncertain freshwater demand.
Jijie Deng, Zhengcai Cao & Min Liu. (2014) A bottleneck prediction and rolling horizon scheme combined dynamic scheduling algorithm for semiconductor wafer fabrication. A bottleneck prediction and rolling horizon scheme combined dynamic scheduling algorithm for semiconductor wafer fabrication.
Ling Xiao & Zhi-Hua Hu. (2014) Berth Allocation Problem with Quay Crane Assignment for Container Terminals Based on Rolling-Horizon Strategy. Mathematical Problems in Engineering 2014, pages 1-11.
Crossref
Veronique Sels & Mario Vanhoucke. (2014) A hybrid Electromagnetism-like Mechanism/tabu search procedure for the single machine scheduling problem with a maximum lateness objective. Computers & Industrial Engineering 67, pages 44-55.
Crossref
M. L. R. Varela & R. A. Ribeiro. 2014. Recent Developments and New Directions in Soft Computing. Recent Developments and New Directions in Soft Computing 81 93 .
Amrish Ravidas, Sivakumar Rathinam & Zachary Wood. (2012) An optimal algorithm for a two runway scheduling problem. Proceedings of the Institution of Mechanical Engineers, Part G: Journal of Aerospace Engineering 227:7, pages 1122-1129.
Crossref
Yue Xi & Jaejin Jang. (2013) Minimizing total weighted tardiness on a single machine with sequence-dependent setup and future ready time. The International Journal of Advanced Manufacturing Technology 67:1-4, pages 281-294.
Crossref
Yan Zuo, Anke Xue & Xiaoping Lai. (2013) A Rolling Horizon Procedure with Terminal Penalty for Large-Scale Single Machine Scheduling Problems. IFAC Proceedings Volumes 46:13, pages 462-467.
Crossref
Qiu Dishan, He Chuan, Liu Jin & Ma Manhao. (2013) A Dynamic Scheduling Method of Earth-Observing Satellites by Employing Rolling Horizon Strategy. The Scientific World Journal 2013, pages 1-11.
Crossref
Dongwei Yang, Wenyou Jia, Zhibin Jiang & You Li. 2013. Proceedings of the Institute of Industrial Engineers Asian Conference 2013. Proceedings of the Institute of Industrial Engineers Asian Conference 2013 559 567 .
Haruhiko Suwa & Hiroaki SandohHaruhiko Suwa & Hiroaki Sandoh. 2013. Online Scheduling in Manufacturing. Online Scheduling in Manufacturing 41 54 .
Haruhiko Suwa & Hiroaki SandohHaruhiko Suwa & Hiroaki Sandoh. 2013. Online Scheduling in Manufacturing. Online Scheduling in Manufacturing 15 38 .
Veronique Sels & Mario Vanhoucke. (2012) A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups. Computers & Operations Research 39:10, pages 2346-2358.
Crossref
Yong-Hee Han & Sung-Seok Ko. (2011) Optimal test capacity allocation in automated high-frequency testing environments. The International Journal of Advanced Manufacturing Technology 62:1-4, pages 213-220.
Crossref
Irina S. Dolinskaya. (2012) Optimal path finding in direction, location, and time dependent environments. Naval Research Logistics (NRL) 59:5, pages 325-339.
Crossref
Eric J. Nava & Yi-Chang Chiu. (2012) A Temporal Domain Decomposition Algorithmic Scheme for Large-Scale Dynamic Traffic Assignment. International Journal of Transportation Science and Technology 1:1, pages 1-24.
Crossref
Chengtao Guo, Jiang Zhibin, Huai Zhang & Na Li. (2012) Decomposition-based classified ant colony optimization algorithm for scheduling semiconductor wafer fabrication system. Computers & Industrial Engineering 62:1, pages 141-151.
Crossref
P Stiverson & S Rathinam. (2011) Heuristics for a runway-queue management problem. Proceedings of the Institution of Mechanical Engineers, Part G: Journal of Aerospace Engineering 225:5, pages 481-499.
Crossref
Mohamed K. Omar & Yasothei Suppiah. 2011. Intelligent Computational Optimization in Engineering. Intelligent Computational Optimization in Engineering 85 107 .
Giovanni Celano, Antonio Costa & Sergio Fichera. (2009) Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times. The International Journal of Advanced Manufacturing Technology 46:5-8, pages 695-705.
Crossref
Xiang Li & Yongjian Li. 2010. Innovative Quick Response Programs in Logistics and Supply Chain Management. Innovative Quick Response Programs in Logistics and Supply Chain Management 141 158 .
Seyda Topaloglu & Gamze Kilincli. (2009) A modified shifting bottleneck heuristic for the reentrant job shop scheduling problem with makespan minimization. The International Journal of Advanced Manufacturing Technology 44:7-8, pages 781-794.
Crossref
Sivakumar Rathinam, Zachary Wood, Banavar Sridhar & Yoon Jung. (2009) A Generalized Dynamic Programming Approach for a Departure Scheduling Problem. A Generalized Dynamic Programming Approach for a Departure Scheduling Problem.
YongJi Jia, ChangJun Wang & LiMing Wang. (2009) A rolling horizon procedure for dynamic pickup and delivery problem with time windows. A rolling horizon procedure for dynamic pickup and delivery problem with time windows.
Djamila Ouelhadj & Sanja Petrovic. (2008) A survey of dynamic scheduling in manufacturing systems. Journal of Scheduling 12:4, pages 417-431.
Crossref
Tsai-Chi Kuo, Sheng-Hung Chang & Shang-Nan Huang. (2009) Due-date performance improvement using TOC’s aggregated time buffer method at a wafer fabrication factory. Expert Systems with Applications 36:2, pages 1783-1792.
Crossref
Mohamed K. Omar, Yasothei Suppiah, S.C Teo.J. A. Bennell. (2008) Scheduling incompatible job families on a single machine: A two-level heuristic approach. Scheduling incompatible job families on a single machine: A two-level heuristic approach.
C.Y. Huang. (2008) Mathematical Modeling of the IC Final Testing Order Selection Problem. Information Technology Journal 7:6, pages 918-923.
Crossref
Christian Artigues & Dominique Feillet. (2007) A branch and bound method for the job-shop problem with sequence-dependent setup times. Annals of Operations Research 159:1, pages 135-159.
Crossref
Yong-Ha Kang, Sung-Shick Kim & Hyun Joon Shin. (2006) A scheduling algorithm for the reentrant shop: an application in semiconductor manufacture. The International Journal of Advanced Manufacturing Technology 35:5-6, pages 566-574.
Crossref
Hong-Yuan Zhang, Yu-Geng Xi & Han-Yu Gu. (2007) A rolling window optimization method for large-scale WCDMA base stations planning problem. European Journal of Operational Research 183:1, pages 370-383.
Crossref
Ning Liu, Mohamed A. Abdelrahman & Srini Ramaswamy. (2007) A Complete Multiagent Framework for Robust and Adaptable Dynamic Job Shop Scheduling. IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews) 37:5, pages 904-916.
Crossref
Bing Wang & Xiaoying Hong. (2007) Rolling Partial Rescheduling Driven by Disruptions on Single-machine Based on Genetic Algorithm. Rolling Partial Rescheduling Driven by Disruptions on Single-machine Based on Genetic Algorithm.
Gary W. Black, Kenneth N. McKay & Thomas E. Morton. (2006) Aversion scheduling in the presence of risky jobs. European Journal of Operational Research 175:1, pages 338-361.
Crossref
Mohamed K. Omar & Siew C. Teo. (2006) Minimizing the sum of earliness/tardiness in identical parallel machines schedule with incompatible job families: An improved MIP approach. Applied Mathematics and Computation 181:2, pages 1008-1017.
Crossref
Tamer Eren & Ertan Güner. (2006) A bicriteria scheduling with sequence-dependent setup times. Applied Mathematics and Computation 179:1, pages 378-385.
Crossref
Hsing-Pei Kao, Brian Wang, James Dong & Kuo-Cheng Ku. (2006) An event-driven approach with makespan/cost tradeoff analysis for project portfolio scheduling. Computers in Industry 57:5, pages 379-397.
Crossref
TsiuShuang Chen, Lei Long & Richard Y. K. Fung. 2006. Intelligent Computing in Signal Processing and Pattern Recognition. Intelligent Computing in Signal Processing and Pattern Recognition 1137 1144 .
Bing Wang, Yugeng Xi & Hanyu Gu. (2005) Terminal penalty rolling scheduling based on an initial schedule for single-machine scheduling problem. Computers & Operations Research 32:11, pages 3059-3072.
Crossref
W.-C. Lin, D.-Y. Liao, C.-Y. Liu & Y.-Y. Lee. (2005) Daily Imaging Scheduling of an Earth Observation Satellite. IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans 35:2, pages 213-223.
Crossref
Bing Wang, Yugeng Xi & Hanyu Gu. (2004) Rolling horizon heuristic for single-machine scheduling problem. Rolling horizon heuristic for single-machine scheduling problem.
Pei-Chann Chang, Jih-Chang Hsieh & Yen-Wen Wang. (2003) Genetic algorithms applied in BOPP film scheduling problems: minimizing total absolute deviation and setup times. Applied Soft Computing 3:2, pages 139-148.
Crossref
Scott J. Mason, John W. Fowler & W. Matthew Carlyle. (2002) A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops. Journal of Scheduling 5:3, pages 247-262.
Crossref
S. Hossien Cheraghi & Vish Waram. (2002) Scheduling of multi-spindle CNC gantry mills. Journal of Scheduling 5:1, pages 3-22.
Crossref
Lixin Tang, Jiyin Liu, Aiying Rong & Zihou Yang. (2001) A review of planning and scheduling systems and methods for integrated steel production. European Journal of Operational Research 133:1, pages 1-20.
Crossref
Marcos Singer. (2001) Decomposition methods for large job shops. Computers & Operations Research 28:3, pages 193-207.
Crossref
Erhan Kutanoglu & Ihsan Sabuncuoglu. (2001) Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop. Journal of Manufacturing Systems 20:4, pages 264-279.
Crossref
I Sabuncuoglu & M Bayız. (2000) Analysis of reactive scheduling problems in a job shop environment. European Journal of Operational Research 126:3, pages 567-586.
Crossref
Zhiwei Zhu & Ronald B Heady. (2000) Minimizing the sum of earliness/tardiness in multi-machine scheduling: a mixed integer programming approach. Computers & Industrial Engineering 38:2, pages 297-305.
Crossref
J. E. Beasley, M. Krishnamoorthy, Y. M. Sharaiha & D. Abramson. (2000) Scheduling Aircraft Landings—The Static Case. Transportation Science 34:2, pages 180-197.
Crossref
Ebru Demirkol & Reha Uzsoy. (2000) Decomposition methods for reentrant flow shops with sequence-dependent setup times. Journal of Scheduling 3:3, pages 155-177.
Crossref
Chung-Yang Liu & Shi-Chung Chang. (2000) Scheduling flexible flow shops with sequence-dependent setup effects. IEEE Transactions on Robotics and Automation 16:4, pages 408-419.
Crossref
Andreas T. Ernst, Mohan Krishnamoorthy & Robert H. Storer. (1999) Heuristic and exact algorithms for scheduling aircraft landings. Networks 34:3, pages 229-241.
Crossref
Ali Allahverdi, Jatinder N.D Gupta & Tariq Aldowaisan. (1999) A review of scheduling research involving setup considerations. Omega 27:2, pages 219-239.
Crossref
Michael Pinedo & Marcos Singer. (1999) A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop. Naval Research Logistics (NRL) 46:1, pages 1-17.
Crossref
T. Freed & R.C. Leachman. (1999) Scheduling semiconductor device test operations on multihead testers. IEEE Transactions on Semiconductor Manufacturing 12:4, pages 523-530.
Crossref
Xiaoqing Sun & James S. Noble. (1999) An approach to job shop scheduling with sequence-dependent setups. Journal of Manufacturing Systems 18:6, pages 416-430.
Crossref
Ihsan Sabuncuoglu & Suleyman Karabuk. (1999) Rescheduling frequency in an FMS with uncertain processing times and unreliable machines. Journal of Manufacturing Systems 18:4, pages 268-283.
Crossref
Eni-Seok Byeon, S.D. Wu & R.H. Storer. (1998) Decomposition heuristics for robust job-shop scheduling. IEEE Transactions on Robotics and Automation 14:2, pages 303-313.
Crossref
Grisselle Centeno & Robert L. Armacost. (1997) Parallel machine scheduling with release time and machine eligibility restrictions. Computers & Industrial Engineering 33:1-2, pages 273-276.
Crossref
Ebru Demirkol & Reha Uzsoy. (1997) Performance of decomposition methods for complex workshops under multiple criteria. Computers & Industrial Engineering 33:1-2, pages 261-264.
Crossref
K. Raj Kumar & T.T. Narendran. (1997) A heuristic for sequencing PCBs with due‐dates. International Journal of Operations & Production Management 17:5, pages 446-467.
Crossref
Irfan M. Ovacik & Reha UzsoyIrfan M. Ovacik & Reha Uzsoy. 1997. Decomposition Methods for Complex Factory Scheduling Problems. Decomposition Methods for Complex Factory Scheduling Problems 107 128 .
Irfan M. Ovacik & Reha UzsoyIrfan M. Ovacik & Reha Uzsoy. 1997. Decomposition Methods for Complex Factory Scheduling Problems. Decomposition Methods for Complex Factory Scheduling Problems 31 45 .
D. Kayton, T. Teyner, C. Schwartz & R. Uzsoy. (1996) Effects of dispatching and down time on the performance of wafer fabs operating under theory of constraints. Effects of dispatching and down time on the performance of wafer fabs operating under theory of constraints.
E. Demirkol, R. Uzsoy & I.M. Ovacik. (1995) Decomposition algorithms for scheduling semiconductor testing facilities. Decomposition algorithms for scheduling semiconductor testing facilities.
João António Noivo & Helena Ramalhinho Dias Lourenço. (1999) Solving Two Production Scheduling Problems with Sequence-Dependent Set-Up Times. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.