783
Views
266
CrossRef citations to date
0
Altmetric
Original Articles

A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART II: SHOP-FLOOR CONTROL

, &
Pages 44-55 | Published online: 31 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (60)

Philipp Neuner & Stefan Haeussler. (2021) Rule based workload control in semiconductor manufacturing revisited. International Journal of Production Research 59:19, pages 5972-5991.
Read now
Ran Lin, Wenhua Li & Xing Chai. (2021) On-line scheduling with equal-length jobs on parallel-batch machines to minimise maximum flow-time with delivery times . Journal of the Operational Research Society 72:8, pages 1754-1761.
Read now
Mahesh Gupta & Soeren Andersen. (2018) Throughput/inventory dollar-days: TOC-based measures for supply chain collaboration. International Journal of Production Research 56:13, pages 4659-4675.
Read now
Lars Mönch, Reha Uzsoy & John W. Fowler. (2018) A survey of semiconductor supply chain models part III: master planning, production planning, and demand fulfilment. International Journal of Production Research 56:13, pages 4565-4584.
Read now
Lars Mönch, Reha Uzsoy & John W. Fowler. (2018) A survey of semiconductor supply chain models part I: semiconductor supply chains, strategic network design, and supply chain simulation. International Journal of Production Research 56:13, pages 4524-4545.
Read now
Daniel Tonke & Martin Grunow. (2018) Maintenance, shutdown and production scheduling in semiconductor robotic cells. International Journal of Production Research 56:9, pages 3306-3325.
Read now
Phillip O. Kriett & Martin Grunow. (2017) Generation of low-dimensional capacity constraints for parallel machines. IISE Transactions 49:12, pages 1189-1205.
Read now
J. Zhang, W. Qin & L.H. Wu. (2016) A performance analytical model of automated material handling system for semiconductor wafer fabrication system. International Journal of Production Research 54:6, pages 1650-1669.
Read now
Guangzhou Diao, Liping Zhao & Yiyong Yao. (2015) A dynamic quality control approach by improving dominant factors based on improved principal component analysis. International Journal of Production Research 53:14, pages 4287-4303.
Read now
Chuen-Horng Lin, Jau-Chuan Ke & Hsin-I Huang. (2012) Reliability-based measures for a system with an uncertain parameter environment. International Journal of Systems Science 43:6, pages 1146-1156.
Read now
Jau-Chuan Ke, Kai-Bin Huang & Wen Lea Pearn. (2012) A batch arrival queue under randomised multi-vacation policy with unreliable server and repair. International Journal of Systems Science 43:3, pages 552-565.
Read now
Shiqing Yao, Zhibin Jiang, Na Li, Na Geng & Xiao Liu. (2011) A decentralised multi-objective scheduling methodology for semiconductor manufacturing. International Journal of Production Research 49:24, pages 7227-7252.
Read now
C Almeder & L Mönch. (2011) Metaheuristics for scheduling jobs with incompatible families on parallel batching machines. Journal of the Operational Research Society 62:12, pages 2083-2096.
Read now
Choonjong Kwak, Eunmi Park & Chang Ouk Kim. (2011) Situation dependent decision selector for production control in testing and rework cell. International Journal of Production Research 49:15, pages 4505-4516.
Read now
Lars Mönch & Jens Zimmermann. (2011) A computational study of a shifting bottleneck heuristic for multi-product complex job shops. Production Planning & Control 22:1, pages 25-40.
Read now
Subhash C. Sarin, Amrusha Varadarajan & Lixin Wang. (2011) A survey of dispatching rules for operational control in wafer fabrication. Production Planning & Control 22:1, pages 4-24.
Read now
Choonjong Kwak. (2010) Dynamic production control with dispatching within pre-emption. International Journal of Production Research 48:22, pages 6637-6650.
Read now
Hongtao Hu, Zhibin Jiang & Huai Zhang. (2010) A dynamic WIP control strategy for bottlenecks in a wafer fabrication system. International Journal of Production Research 48:17, pages 5221-5233.
Read now
M. Chen, S.C. Sarin & Andy Peake. (2010) Integrated lot sizing and dispatching in wafer fabrication. Production Planning & Control 21:5, pages 485-495.
Read now
Lihui Wu & Jie Zhang. (2010) Fuzzy neural network based yield prediction model for semiconductor manufacturing system. International Journal of Production Research 48:11, pages 3225-3243.
Read now
A. Upasani & R. Uzsoy. (2008) Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study. International Journal of Production Research 46:21, pages 5883-5905.
Read now
T. C. Chiang, Y. S. Shen & L. C. Fu. (2008) A new paradigm for rule-based scheduling in the wafer probe centre. International Journal of Production Research 46:15, pages 4111-4133.
Read now
N. Bahaji & M. E. Kuhl. (2008) A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication. International Journal of Production Research 46:14, pages 3801-3824.
Read now
T. Freed, K. H. Doerr & T. Chang. (2007) In-house development of scheduling decision support systems: case study for scheduling semiconductor device test operations. International Journal of Production Research 45:21, pages 5075-5093.
Read now
H. Liu, Z. Jiang & R. Y. K. Fung. (2007) The infrastructure of the timed EOPNs-based multiple-objective real-time scheduling system for 300 mm wafer fab. International Journal of Production Research 45:21, pages 5017-5056.
Read now
J. Zhang, W. Zhai & J. Yan. (2007) Multiagent-based modeling for re-entrant manufacturing system. International Journal of Production Research 45:13, pages 3017-3036.
Read now
D. J. Van Der Zee. (2007) Dynamic scheduling of batch-processing machines with non-identical product sizes. International Journal of Production Research 45:10, pages 2327-2349.
Read now
Chen-Fu Chien, Hsin-Kai Chen, Jei-Zheng Wu & Chih-Han Hu. (2007) Constructing the OGE for promoting tool group productivity in semiconductor manufacturing. International Journal of Production Research 45:3, pages 509-524.
Read now
L. Mönch, M. Stehli, J. Zimmermann & I. Habenicht. (2006) The FABMAS multi-agent-system prototype for production control of water fabs: design, implementation and performance assessment. Production Planning & Control 17:7, pages 701-716.
Read now
S. H. Chung, C. Y. Huang & A. H. I. Lee. (2006) Capacity allocation model for photolithography workstation with the constraints of process window and machine dedication. Production Planning & Control 17:7, pages 678-688.
Read now
J. N. D. Gupta, R. Ruiz, J. W. Fowler & S. J. Mason. (2006) Operational planning and control of semiconductor wafer production. Production Planning & Control 17:7, pages 639-647.
Read now
Y. H. Lee, S. Chung, B. Lee & K. H. Kang. (2006) Supply chain model for the semiconductor industry in consideration of manufacturing characteristics. Production Planning & Control 17:5, pages 518-533.
Read now
S. David Wu, Murat Erkoc & Suleyman Karabuk. (2005) Managing Capacity in the High-Tech Industry: A Review of Literature. The Engineering Economist 50:2, pages 125-158.
Read now
A. Barua, N. Raghavan, A. Upasani & R. Uzsoy . (2005) Implementing global factory schedules in the face of stochastic disruptions. International Journal of Production Research 43:4, pages 793-818.
Read now
Huiran Liu, Richard Y. K. Fung & Zhibin Jiang. (2005) Modelling of semiconductor wafer fabrication systems by extended object-oriented Petri nets. International Journal of Production Research 43:3, pages 471-495.
Read now
D. J. Van Der Zee . (2004) Dynamic scheduling of batch servers with compatible product families. International Journal of Production Research 42:22, pages 4803-4826.
Read now
R. Kumar, M. K. Tiwari & V. Allada . (2004) Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability. International Journal of Production Research 42:21, pages 4431-4455.
Read now
Y. Tang & R. G. Qiu. (2004) Integrated design approach for virtual production line-based reconfigurable manufacturing systems. International Journal of Production Research 42:18, pages 3803-3822.
Read now
K. P. Ellis, Y. Lu & E. K. Bish. (2004) Scheduling of wafer test processes in semiconductor manufacturing. International Journal of Production Research 42:2, pages 215-242.
Read now
Chen-Fu Chien, Allen Hsiao & Ivan Wang. (2004) CONSTRUCTING SEMICONDUCTOR MANUFACTURING PERFORMANCE INDEXES AND APPLYING DATA MINING FOR MANUFACTURING DATA ANALYSIS. Journal of the Chinese Institute of Industrial Engineers 21:4, pages 313-327.
Read now
JoseM. Framinan, PedroL. González & Rafael Ruiz-Usano. (2003) The CONWIP production control system: Review and research issues. Production Planning & Control 14:3, pages 255-265.
Read now
Yung-Jye Sha, Ling-Feng Hsieh & Shih-Hsing Lin. (2003) STUDY ON WAFER REWORK STRATEGIES AND DISPATCHING RULES AT THE PHOTOLITHOGRAPHY STAGE. Journal of the Chinese Institute of Industrial Engineers 20:5, pages 457-464.
Read now
V Jain, R Swarnkar & M. K Tiwari. (2003) Modelling and analysis of wafer fabrication scheduling via generalized stochastic Petri net and simulated annealing. International Journal of Production Research 41:15, pages 3501-3527.
Read now
RussM. Dabbas, JohnW. Fowler, DwayneA. Rollier & Daniel Mccarville. (2003) Multiple response optimization using mixture-designed experiments and desirability functions in semiconductor scheduling. International Journal of Production Research 41:5, pages 939-961.
Read now
John W Fowler, Gary L Hogg & Scott J Mason. (2002) Workload control in the semiconductor industry. Production Planning & Control 13:7, pages 568-578.
Read now
Young Hoon Lee & Taeheon Kim. (2002) Manufacturing cycle time reduction using balance control in the semiconductor fabrication line. Production Planning & Control 13:6, pages 529-540.
Read now
YOUNGHOON LEE, JONGKWAN PARK & SOOYOUNG KIM. (2002) Experimental study on input and bottleneck scheduling for a semiconductor fabrication line. IIE Transactions 34:2, pages 179-190.
Read now
SOOYOUNG KIM, SEUNG-HEE YEA & BOKANG KIM. (2002) Shift scheduling for steppers in the semiconductor wafer fabrication process. IIE Transactions 34:2, pages 167-177.
Read now
JonahC. Tyan, JamesC. Chen & Fu-Kwun Wang. (2002) Development of a state-dependent dispatch rule using theory of constraints in near-real-world wafer fabrication. Production Planning & Control 13:3, pages 253-261.
Read now
Jonghun Park, SpyrosA. Reveliotis, DouglasA. Bodner & LeonF. Mcginnis. (2002) A distributed, event-driven control architecture for flexibly automated manufacturing systems. International Journal of Computer Integrated Manufacturing 15:2, pages 109-126.
Read now
J. K. Cochran & Hung-Nan Chen. (2002) Generating daily production plans for complex manufacturing facilities using multi-objective genetic algorithms. International Journal of Production Research 40:16, pages 4147-4167.
Read now
D. J. Van Der Zee. (2002) Adaptive scheduling of batch servers in flow shops. International Journal of Production Research 40:12, pages 2811-2833.
Read now
CARLOSF. BISPO & SRIDHAR TAYUR. (2001) Managing simple re-entrant flow lines: theoretical foundation and experimental results. IIE Transactions 33:8, pages 609-623.
Read now
DURK-JOUKE VAN DER ZEE, AART VAN HARTEN & PETER SCHUUR. (2001) On-line scheduling of multi-server batch operations. IIE Transactions 33:7, pages 569-586.
Read now
Sheng-Hung Chang, Kelvin Chang & Rong-Kwei Li. (2001) A COMBINED SHOP FLOW CONTROL METHOD FOR THE WAFER FABRICATION FACTORIES. Journal of the Chinese Institute of Industrial Engineers 18:4, pages 59-72.
Read now
Sheng-Hung Chang, Yun-Min Feng, Ying-Mei Tu, Chen-Lung Huang & Rong-Kwei Li. (1999) 以限制理論爲基礎之晶圓製造廠派工法則. Journal of the Chinese Institute of Industrial Engineers 16:2, pages 209-220.
Read now
SANJAYV. MEHTA & REHA UZSOY. (1998) Minimizing total tardiness on a batch processing machine with incompatible job families. IIE Transactions 30:2, pages 165-178.
Read now
IZAK DUENYAS & PRAYOON PATANA-ANAKE. (1998) Base-stock control for single-product tandem make-to-stock systems. IIE Transactions 30:1, pages 31-39.
Read now
R. UZSOY. (1995) Scheduling batch processing machines with incompatible job families. International Journal of Production Research 33:10, pages 2685-2708.
Read now

Articles from other publishers (206)

Jianxin Fang, Brenda Cheang & Andrew Lim. (2023) Problems and Solution Methods of Machine Scheduling in Semiconductor Manufacturing Operations: A Survey. Sustainability 15:17, pages 13012.
Crossref
Shuo Lin, Shishi Li & Shunchao Zhang. (2023) Research on scheduling optimization problem of process industry based on improved gray wolf algorithm. Research on scheduling optimization problem of process industry based on improved gray wolf algorithm.
Biber Nurit, Mor Baruch, Schlissel Yitzhak & Shapira Dana. (2023) Lot scheduling involving completion time problems on identical parallel machines. Operational Research 23:1.
Crossref
Constantin Hofmann, Xinhong Liu, Marvin May & Gisela Lanza. (2022) Hybrid Monte Carlo tree search based multi-objective scheduling. Production Engineering 17:1, pages 133-144.
Crossref
Kan Wu, Edward Huang, Mengchang Wang & Meimei Zheng. (2022) Job scheduling of diffusion furnaces in semiconductor fabrication facilities. European Journal of Operational Research 301:1, pages 141-152.
Crossref
Artur Alves Pessoa, Teobaldo Bulhões, Vitor NeselloAnand Subramanian. (2022) Exact Approaches for Single Machine Total Weighted Tardiness Batch Scheduling. INFORMS Journal on Computing 34:3, pages 1512-1530.
Crossref
Dominik Kress & David Müller. (2022) Semiconductor final-test scheduling under setup operator constraints. Computers & Operations Research 138, pages 105619.
Crossref
Xing Chai, Wenhua Li & Yuejuan Zhu. (2019) Online scheduling to minimize maximum weighted flow-time on a bounded parallel-batch machine. Annals of Operations Research 298:1-2, pages 79-93.
Crossref
Nicole Stricker, Andreas Kuhnle, Constantin Hofmann & Patrick Deininger. (2021) Self-adjusting multi-objective scheduling based on Monte Carlo Tree Search for matrix production assembly systems. CIRP Annals 70:1, pages 381-384.
Crossref
Peng Wu, Junheng Cheng & Feng Chu. (2019) Large-scale energy-conscious bi-objective single-machine batch scheduling under time-of-use electricity tariffs via effective iterative heuristics. Annals of Operations Research 296:1-2, pages 471-494.
Crossref
Philipp Neuner, Stefan Haeussler & Quirin Ilmer. (2020) Periodic Workload Control: A Viable Alternative for Semiconductor Manufacturing. Periodic Workload Control: A Viable Alternative for Semiconductor Manufacturing.
Julia Siess, Hermann Gold & Thomas Ponsignon. (2020) Modelling and Mathematical Optimization for Capacity Planning of a Semiconductor Wafer Test Module. Modelling and Mathematical Optimization for Capacity Planning of a Semiconductor Wafer Test Module.
Joris Werling, Claude Yugma, Ameur Soukhal & Thierry Mohr. (2020) An Agent-Based Simulation Model with Human Resource Integration for Semiconductor Manufacturing Facility. An Agent-Based Simulation Model with Human Resource Integration for Semiconductor Manufacturing Facility.
Peter Lendermann, Stephane Dauzere-Peres, Leon McGinnis, Lars Monch, Tina O'Donnell, Georg Seidel & Philippe Vialletelle. (2020) Scheduling and Simulation in wafer fabs: Competitors, Independent Players or Amplifiers?. Scheduling and Simulation in wafer fabs: Competitors, Independent Players or Amplifiers?.
Dhaval Jayendrakumar Pujara & Muthu Mathirajan. (2020) Mixed Integer Linear Programming Model for Scheduling Burn-in Ovens to Minimize Total Weighted Earliness/Lateness. Mixed Integer Linear Programming Model for Scheduling Burn-in Ovens to Minimize Total Weighted Earliness/Lateness.
Kan Wu & Yichi Shen. (2020) A unified view on planning, scheduling and dispatching for a factory. Advanced Engineering Informatics 46, pages 101188.
Crossref
Wolfgang Albrecht & Martin Steinrücke. (2019) Continuous-time scheduling of production, distribution and sales in photovoltaic supply chains with declining prices. Flexible Services and Manufacturing Journal 32:3, pages 629-667.
Crossref
Yuanyuan Yan, Huangang Wang, Qinghua Tao, Wenhui Fan, Tingyu Lin & Yingying Xiao. (2020) Noncyclic Scheduling of Multi-Cluster Tools With Residency Constraints Based on Pareto Optimization. IEEE Transactions on Semiconductor Manufacturing 33:3, pages 476-486.
Crossref
Shiladitya Chakravorty & Nagendra N. Nagarur. (2020) An Artificial Neural Network Based Algorithm For Real Time Dispatching Decisions. An Artificial Neural Network Based Algorithm For Real Time Dispatching Decisions.
Junheng Cheng, Feng Chu & Peng Wu. 2020. Scheduling in Industry 4.0 and Cloud Manufacturing. Scheduling in Industry 4.0 and Cloud Manufacturing 217 237 .
Hubert Missbauer & Reha UzsoyHubert Missbauer & Reha Uzsoy. 2020. Production Planning with Capacitated Resources and Congestion. Production Planning with Capacitated Resources and Congestion 1 18 .
Wenhua Li, Weina Zhai & Xing Chai. (2019) Online Bi-Criteria Scheduling on Batch Machines with Machine Costs. Mathematics 7:10, pages 960.
Crossref
Chao-Bo Yan, Lars Monch & Semyon M. Meerkov. (2019) Characteristic Curves and Cycle Time Control of Re-Entrant Lines. IEEE Transactions on Semiconductor Manufacturing 32:2, pages 140-153.
Crossref
Shiladitya Chakravorty & Atirek Wribhu. (2019) Throughput Optimization of Fast Processing Tools Using a Dispatching Algorithm. Throughput Optimization of Fast Processing Tools Using a Dispatching Algorithm.
Zhen Wang, Yuanqing Qi, Hairong Cui & Jihui Zhang. (2019) A hybrid algorithm for order acceptance and scheduling problem in make-to-stock/make-to-order industries. Computers & Industrial Engineering 127, pages 841-852.
Crossref
Rashmi Singh & M. Mathirajan. (2018) Experimental investigation for performance assessment of scheduling policies in semiconductor wafer fabrication—a simulation approach. The International Journal of Advanced Manufacturing Technology 99:5-8, pages 1503-1520.
Crossref
Yu-Ting Kao & Shi-Chung Chang. (2018) Setting daily production targets with novel approximation of target tracking operations for semiconductor manufacturing. Journal of Manufacturing Systems 49, pages 107-120.
Crossref
Shiladitya Chakravorty, Chihyun Jung, Garrett Szafman, Jaana Rajachidambaram, Bradley Savoy & Satyajit Shinde. (2018) A novel approach to tool monitoring for furnace tools with dynamic recipe management. A novel approach to tool monitoring for furnace tools with dynamic recipe management.
Emna Mhiri, Fabien Mangione, Mireille Jacomino, Philippe Vialletelle & Guillaume Lepelletier. (2018) Heuristic Algorithm for a WIP Projection Problem at Finite Capacity in Semiconductor Manufacturing. IEEE Transactions on Semiconductor Manufacturing 31:1, pages 62-75.
Crossref
Junheng Cheng, Feng Chu, Ming Liu, Peng Wu & Weili Xia. (2017) Bi-criteria single-machine batch scheduling with machine on/off switching under time-of-use tariffs. Computers & Industrial Engineering 112, pages 721-734.
Crossref
Chunrong Pan, Kun Zhao & Yi-Sheng Huang. (2017) Schedulability analysis for dual-armed cluster tools with mixed-processing of multi-variety wafers. Schedulability analysis for dual-armed cluster tools with mixed-processing of multi-variety wafers.
Erinc Albey, Reha Uzsoy & Karl G. Kempf. (2016) A chance constraint based multi-item production planning model using simulation optimization. A chance constraint based multi-item production planning model using simulation optimization.
Shengchao Zhou, Ming Liu, Huaping Chen & Xueping Li. (2016) An effective discrete differential evolution algorithm for scheduling uniform parallel batch processing machines with non-identical capacities and arbitrary job sizes. International Journal of Production Economics 179, pages 1-11.
Crossref
S. Molla-Alizadeh-Zavardehi, R. Tavakkoli-Moghaddam & F. Hosseinzadeh Lotfi. (2015) A modified imperialist competitive algorithm for scheduling single batch-processing machine with fuzzy due date. The International Journal of Advanced Manufacturing Technology 85:9-12, pages 2439-2458.
Crossref
T. C. E. Cheng, Bo Peng & Zhipeng Lü. (2013) A hybrid evolutionary algorithm to solve the job shop scheduling problem. Annals of Operations Research 242:2, pages 223-237.
Crossref
Jonathan J. Lowe & Scott J. Mason. (2016) Integrated Semiconductor Supply Chain Production Planning. IEEE Transactions on Semiconductor Manufacturing 29:2, pages 116-126.
Crossref
Anis Ben Said, Muhammad Kashif Shahzad, Eric Zamai, Stéphane Hubac & Michel Tollenaere. (2015) Experts’ knowledge renewal and maintenance actions effectiveness in high-mix low-volume industries, using Bayesian approach. Cognition, Technology & Work 18:1, pages 193-213.
Crossref
Sadegh Niroomand, Ali Mahmoodirad & Saber Molla-Alizadeh-Zavardehi. 2016. Handbook of Research on Modern Optimization Algorithms and Applications in Engineering and Economics. Handbook of Research on Modern Optimization Algorithms and Applications in Engineering and Economics 751 769 .
Richard Hinze & Dirk Sackmann. 2016. Operations Research Proceedings 2014. Operations Research Proceedings 2014 221 226 .
Richard Hinze. 2016. Logistics Management. Logistics Management 149 158 .
Yael Perlman, Elad Crispil & Adar Kalir. (2015) Production Planning and WIP Assignment for Wafer Fabrication Tools With Availability Constraints. IEEE Transactions on Semiconductor Manufacturing 28:3, pages 385-392.
Crossref
Dieter Armbruster, Michael Herty, Xinping Wang & Lindu Zhao. (2015) Integrating release and dispatch policies in production models. Networks & Heterogeneous Media 10:3, pages 511-526.
Crossref
Jingjing Yuan & Thomas Ponsignon. (2014) Towards a semiconductor supply chain simulation library (SCSC-SIMLIB). Towards a semiconductor supply chain simulation library (SCSC-SIMLIB).
Emna Mhiri, Mireille Jacomino, Fabien Mangione, Philippe Vialletelle & Guillaume Lepelletier. (2014) A step toward capacity planning at finite capacity in semiconductor manufacturing. A step toward capacity planning at finite capacity in semiconductor manufacturing.
Rashmi Singh & M. Mathirajan. (2014) A conceptual simulation framework for the performance assessment of lot release policies. A conceptual simulation framework for the performance assessment of lot release policies.
J. Zhang, W. Qin, L.H. Wu & W.B. Zhai. (2014) Fuzzy neural network-based rescheduling decision mechanism for semiconductor manufacturing. Computers in Industry 65:8, pages 1115-1125.
Crossref
J. Behnamian. (2014) A parallel competitive colonial algorithm for JIT flowshop scheduling. Journal of Computational Science 5:5, pages 777-783.
Crossref
CHENGWEN JIAO, WENHUA LI & JINJIANG YUAN. (2014) A BEST POSSIBLE ONLINE ALGORITHM FOR SCHEDULING TO MINIMIZE MAXIMUM FLOW-TIME ON BOUNDED BATCH MACHINES. Asia-Pacific Journal of Operational Research 31:04, pages 1450030.
Crossref
J. Behnamian & S.M.T. Fatemi Ghomi. (2014) Multi-objective fuzzy multiprocessor flowshop scheduling. Applied Soft Computing 21, pages 139-148.
Crossref
S. Molla-Alizadeh-Zavardehi, R. Tavakkoli-Moghaddam & F. Hosseinzadeh Lotfi. (2014) Hybrid Metaheuristics for Solving a Fuzzy Single Batch-Processing Machine Scheduling Problem. The Scientific World Journal 2014, pages 1-10.
Crossref
Remco Germs & Nicky van Foreest. (2012) Analysis of finite-buffer state-dependent bulk queues. OR Spectrum 35:3, pages 563-583.
Crossref
Hyun Joong Yoon & Jin Gon Kim. (2013) Heuristic scheduling policies for a semiconductor wafer fabrication facility: minimizing variation of cycle times. The International Journal of Advanced Manufacturing Technology 67:1-4, pages 171-180.
Crossref
Sang Oh Shim. (2013) Developing Automated Production Management System for Manufacturing Green IT Products. Advanced Materials Research 712-715, pages 3187-3190.
Crossref
Byung-Cheon Choi & Jibok Chung. (2013) Job release scheduling problem: Complexity and an approximation algorithm. Discrete Applied Mathematics 161:6, pages 858-863.
Crossref
Kamil Erkan Kabak, Cathal Heavey, Vincent Corbett & P. J. Byrne. (2013) Impact of Recipe Restrictions on Photolithography Toolsets in an ASIC Fabrication Environment. IEEE Transactions on Semiconductor Manufacturing 26:1, pages 53-68.
Crossref
Yi-Feng Hung, Chi-Chung Wang & Gen-Han Wu. (2013) Scheduling Semiconductor Multihead Testers Using Metaheuristic Techniques Embedded with Lot-Specific and Configuration-Specific Information. Mathematical Problems in Engineering 2013, pages 1-14.
Crossref
Tsung-Che Chiang. (2013) Enhancing rule-based scheduling in wafer fabrication facilities by evolutionary algorithms: Review and opportunity. Computers & Industrial Engineering 64:1, pages 524-535.
Crossref
Han-jiang Zhang, Hong-xia Zhong & Wei-hua Shi. 2013. Proceedings of 20th International Conference on Industrial Engineering and Engineering Management. Proceedings of 20th International Conference on Industrial Engineering and Engineering Management 653 663 .
Haruhiko Suwa & Hiroaki SandohHaruhiko Suwa & Hiroaki Sandoh. 2013. Online Scheduling in Manufacturing. Online Scheduling in Manufacturing 15 38 .
Sang Oh Shim. (2012) Line Level Scheduling by Integrating Area Level Scheduling in Manufacturing Systems. Applied Mechanics and Materials 267, pages 83-86.
Crossref
Jan Lange, Gerald Weigert, Sophia Keil, Rainer Lasch & Dietrich Eberts. (2012) Introducing the virtual time based flow principle in a high-mix low-volume wafer test facility and exploring the behavior of its key performance indicators. Introducing the virtual time based flow principle in a high-mix low-volume wafer test facility and exploring the behavior of its key performance indicators.
Xiaoting Chen, Emmanuel Fernandez & W. David Kelton. (2012) Optimization model selection for simulation-based approximate dynamic programming approaches in semiconductor manufacturing operations. Optimization model selection for simulation-based approximate dynamic programming approaches in semiconductor manufacturing operations.
Li-li Yao, Hai-bo Shi & Chang Liu. (2012) Solving the problem of product-conversion in semiconductor assembly and test manufacturing system by a novel heuristic scheduling algorithm. Solving the problem of product-conversion in semiconductor assembly and test manufacturing system by a novel heuristic scheduling algorithm.
Hans Ehm & Thomas Ponsignon. (2012) Future research directions for mastering end-to-end semiconductor supply chains. Future research directions for mastering end-to-end semiconductor supply chains.
Thomas Ponsignon & Lars Mönch. (2012) Heuristic approaches for master planning in semiconductor manufacturing. Computers & Operations Research 39:3, pages 479-491.
Crossref
Rui Xu, Huaping Chen & Xueping Li. (2012) Makespan minimization on single batch-processing machine via ant colony optimization. Computers & Operations Research 39:3, pages 582-593.
Crossref
Jau-Chuan Ke & Chia-Huang Wu. (2012) Multi-server machine repair model with standbys and synchronous multiple vacation. Computers & Industrial Engineering 62:1, pages 296-305.
Crossref
Seungchul Lee & Jun Ni. (2012) Genetic Algorithm for Job Scheduling with Maintenance Consideration in Semiconductor Manufacturing Process. Mathematical Problems in Engineering 2012, pages 1-16.
Crossref
Kenneth Fordyce & R. John Milne. 2012. Decision Policies for Production Networks. Decision Policies for Production Networks 31 69 .
M. Hekmatfar, S.M.T. Fatemi Ghomi & B. Karimi. (2011) Two stage reentrant hybrid flow shop with setup times and the criterion of minimizing makespan. Applied Soft Computing 11:8, pages 4530-4539.
Crossref
Lars Mönch, John W. Fowler, Stéphane Dauzère-Pérès, Scott J. Mason & Oliver Rose. (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations. Journal of Scheduling 14:6, pages 583-599.
Crossref
Ji Tian, Ruyan Fu & Jinjiang Yuan. (2011) An on-line algorithm for the single machine unbounded parallel-batching scheduling with large delivery times. Information Processing Letters 111:21-22, pages 1048-1053.
Crossref
Wenhua Li & Jinjiang Yuan. (2011) Online scheduling on unbounded parallel-batch machines to minimize maximum flow-time. Information Processing Letters 111:18, pages 907-911.
Crossref
Rene Driessel & Lars Mönch. (2011) Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times. Computers & Industrial Engineering 61:2, pages 336-345.
Crossref
L.H. Wu, P.Y. Mok & J. Zhang. (2011) An adaptive multi-parameter based dispatching strategy for single-loop interbay material handling systems. Computers in Industry 62:2, pages 175-186.
Crossref
Bing Hai Zhou. (2011) Elman Neural Network–Based Dynamic Scheduling of Wafer Photolithography Process. Advanced Materials Research 186, pages 36-40.
Crossref
Jau-Chuan Ke, Chia-Huang Wu, Cheng-Hwai Liou & Tsung-Yin Wang. (2011) Cost Analysis of a vacation machine repair model. Procedia - Social and Behavioral Sciences 25, pages 246-256.
Crossref
Hongtao Hu, Zhibin Jiang, Chengtao Guo & Ran Liu. (2010) A decomposition based algorithm for the scheduling problem in wafer fabrication system. A decomposition based algorithm for the scheduling problem in wafer fabrication system.
Shiqing Yao, Zhibin Jiang, Na Li & Ran Liu. (2010) A decentralized VPLs based control policy for semiconductor manufacturing. A decentralized VPLs based control policy for semiconductor manufacturing.
Xiao Jing & Zheng Li. (2010) A MILP-based batch scheduling for two-stage hybrid flowshop with sequence-dependent setups in semiconductor assembly and test manufacturing. A MILP-based batch scheduling for two-stage hybrid flowshop with sequence-dependent setups in semiconductor assembly and test manufacturing.
Bongju Jeong, Jaehyung Choi & Jinmo Sung. (2010) Optimal batch sizing for parallel machines in semiconductor wafer fabrication. Optimal batch sizing for parallel machines in semiconductor wafer fabrication.
Lihui Wu, Jie Zhang, Yinbin Sun & Gong Zhang. 2010. Proceedings of the 6th CIRP-Sponsored International Conference on Digital Enterprise Technology. Proceedings of the 6th CIRP-Sponsored International Conference on Digital Enterprise Technology 927 938 .
Jose A. Ramirez-Hernandez & Emmanuel Fernandez. (2009) A simulation-based Approximate Dynamic Programming approach for the control of the Intel Mini-Fab benchmark model. A simulation-based Approximate Dynamic Programming approach for the control of the Intel Mini-Fab benchmark model.
Wenjie Li, Jinjiang Yuan, Jianfa Cao & Hailin Bu. (2009) Online scheduling of unit length jobs on a batching machine to maximize the number of early jobs with lookahead. Theoretical Computer Science 410:47-49, pages 5182-5187.
Crossref
S.Y. Hsu, D.Y. Sha & Y.H. Chang. (2009) An integrated dispatching rule with on‐line rework consideration in wafer fabrication. Journal of Manufacturing Technology Management 20:8, pages 1166-1182.
Crossref
Ying Wang, Zhixian Lin & Maoqing Li. (2009) Model research and features simplification for scheduling of wafer fabrication system. Model research and features simplification for scheduling of wafer fabrication system.
Hyun-Seon Choi, Hyung-Won Kim, Dong-Ho Lee, Junggee Yoon, Chang Yeon Yun & Kevin B. Chae. (2008) Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates. The International Journal of Advanced Manufacturing Technology 42:9-10, pages 963-973.
Crossref
Kuo-Ching Ying & Shih-Wei Lin. (2009) Raising the hit rate for wafer fabrication by a simple constructive heuristic. Expert Systems with Applications 36:2, pages 2894-2900.
Crossref
Y.F. Lee, Z.B. Jiang & H.R. Liu. (2009) Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system. Computers & Operations Research 36:3, pages 866-884.
Crossref
Young Hoon Lee, Myoungsoo Ham, Bruce Yoo & Jae Sun Lee. (2008) Daily planning and scheduling system for the EDS process in a semiconductor manufacturing facility. The International Journal of Advanced Manufacturing Technology 41:5-6, pages 568-579.
Crossref
Yu‐Cheng Lin, Chih‐Hung Tsai, Rong‐Kwei Li, Ching‐Piao Chen & Hsien‐Ching Chen. (2008) The Study of the Cycle Time Improvement by Work‐In‐Process Statistical Process Control Method for IC Foundry Manufacturing. Asian Journal on Quality 9:3, pages 71-91.
Crossref
Chen-Fu Chien, Stephane Dauzere-Peres, Hans Ehm, John W. Fowler, Zhibin Jiang, Shekar Krishnaswamy, Lars Monch & Reha Uzsoy. (2008) Modeling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes. Modeling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes.
Xiangbin Zhang, Yushi Li & Lin Ma. (2008) Notice of Retraction: Research of the Inverse Problem of Linear Programming on Adjusting the Coefficient A in the Basic-Changed Situation. Notice of Retraction: Research of the Inverse Problem of Linear Programming on Adjusting the Coefficient A in the Basic-Changed Situation.
Chao Qi, A.I. Sivakumar & S.B. Gershwin. (2008) Impact of Production Control and System Factors in Semiconductor Wafer Fabrication. IEEE Transactions on Semiconductor Manufacturing 21:3, pages 376-389.
Crossref
N. Govind, E.W. Bullock, Linling He, B. Iyer, M. Krishna & C.S. Lockwood. (2008) Operations Management in Automated Semiconductor Manufacturing With Integrated Targeting, Near Real-Time Scheduling, and Dispatching. IEEE Transactions on Semiconductor Manufacturing 21:3, pages 363-370.
Crossref
Zhang Tie-Zhu & Wang Yue-Peng. (2008) Simulation Research on Workshop Control Strategy in Semiconductor Wafer Probe Area. Simulation Research on Workshop Control Strategy in Semiconductor Wafer Probe Area.
Jose A. Ramirez-Hernandez & Emmanuel Fernandez. (2007) Control of a re-entrant line manufacturing model with a reinforcement learning approach. Control of a re-entrant line manufacturing model with a reinforcement learning approach.
D. Y. Sha, Sheng-Yuan Hsu & X. D. Lai. (2006) Design of due-date oriented look-ahead batching rule in wafer fabrication. The International Journal of Advanced Manufacturing Technology 35:5-6, pages 596-609.
Crossref
Lars Mönch & Robert Unbehaun. (2007) Decomposition heuristics for minimizing earliness–tardiness on parallel burn-in ovens with a common due date. Computers & Operations Research 34:11, pages 3380-3396.
Crossref
Zuntong Wang, Qidi Wu & Fei Qiao. (2007) A Lot Dispatching Strategy Integrating WIP Management and Wafer Start Control. IEEE Transactions on Automation Science and Engineering 4:4, pages 579-583.
Crossref
Zhang Huai, Jiang Zhibin, Lee Yen-Fei, Ko Chen-Pin, Luke Choo Ooi Tuck & Lim Lee Phing. (2007) An approach of dynamic bottleneck machine dispatching for semiconductor wafer fab. An approach of dynamic bottleneck machine dispatching for semiconductor wafer fab.
Gonca Tuncel & G. Mirac Bayhan. (2006) Applications of Petri nets in production scheduling: a review. The International Journal of Advanced Manufacturing Technology 34:7-8, pages 762-773.
Crossref
Yu?Hsin Lin, Chih?Hung Tsai, Ching?En Lee & Chung?Ching Chiu. (2007) Research on the WIP?based Dispatching Rules for Photolithography Area in Wafer Fabrication Industries. Asian Journal on Quality 8:2, pages 145-159.
Crossref
Samuel Wood. 2007. Handbook of Semiconductor Manufacturing Technology, Second Edition. Handbook of Semiconductor Manufacturing Technology, Second Edition 34-1 34-23 .
S.Y. Hsu & D.Y. Sha. (2007) The integration of shop floor control in wafer fabrication. Journal of Manufacturing Technology Management 18:5, pages 598-619.
Crossref
Julia Pahl, Stefan Voß & David L. Woodruff. (2007) Production planning with load dependent lead times: an update of research. Annals of Operations Research 153:1, pages 297-345.
Crossref
Mickael Bureau, Stephane Dauzere-Peres, Claude Yugma & Leon Vermarien. (2007) An approach for simulating consistent global and local scheduling. An approach for simulating consistent global and local scheduling.
Nirmal Govind, Eric Bullock, Linling He, Bala Iyer, Murali Krishna & Charles Lockwood. (2007) Integrated Targeting, Near Real-Time Scheduling, and Dispatching with Automated Execution in Semiconductor Manufacturing. Integrated Targeting, Near Real-Time Scheduling, and Dispatching with Automated Execution in Semiconductor Manufacturing.
Jose A. Ramirez-Hernandez & Emmanuel Fernandez. (2007) An Approximate Dynamic Programming Approach for Job Releasing and Sequencing in a Reentrant Manufacturing Line. An Approximate Dynamic Programming Approach for Job Releasing and Sequencing in a Reentrant Manufacturing Line.
Ji Tian, Ruyan Fu & Jinjiang Yuan. (2007) On-line scheduling with delivery time on a single batch machine. Theoretical Computer Science 374:1-3, pages 49-57.
Crossref
Karthik Sourirajan & Reha Uzsoy. (2007) Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication. Journal of Scheduling 10:1, pages 41-65.
Crossref
A. H. I. Lee, S. H. Chung & C. Y. Huang. 2007. Computational Science and Its Applications – ICCSA 2007. Computational Science and Its Applications – ICCSA 2007 767 778 .
Young Hoon Lee & Kyung Hwan Kang. 2007. Trends in Supply Chain Design and Management. Trends in Supply Chain Design and Management 269 287 .
Lin Liu, Han-yu Gu & Yu-geng Xi. (2006) Robust and stable scheduling of a single machine with random machine breakdowns. The International Journal of Advanced Manufacturing Technology 31:7-8, pages 645-654.
Crossref
Jose A. Ramirez-Hernandez & Emmanuel Fernandez. (2006) Optimal Job Releasing and Sequencing for a Reentrant Manufacturing Line with Finite Capacity Buffers. Optimal Job Releasing and Sequencing for a Reentrant Manufacturing Line with Finite Capacity Buffers.
Brian T. Denton, John Forrest & R. John Milne. (2006) IBM Solves a Mixed-Integer Program to Optimize Its Semiconductor Supply Chain. Interfaces 36:5, pages 386-399.
Crossref
Tsung-Che Chiang & Li-Chen Fu. (2006) A Simulation Study on Dispatching Rules in Semiconductor Wafer Fabrication Facilities with Due Date-based Objectives. A Simulation Study on Dispatching Rules in Semiconductor Wafer Fabrication Facilities with Due Date-based Objectives.
N.R. Raghavan & M. Venkataramana. (2006) Scheduling Parallel Batch Processors with Incompatible Job Families Using Ant Colony Optimization. Scheduling Parallel Batch Processors with Incompatible Job Families Using Ant Colony Optimization.
Zuntong Wang, Fei Qiao & Qidi Wu. (2006) Scheduling Semiconductor Wafer Fabrication with Optimization of Multiple objectives. Scheduling Semiconductor Wafer Fabrication with Optimization of Multiple objectives.
Suhua Hsieh & Kai-Chung Hou. (2005) Production-flow-value-based job dispatching method for semiconductor manufacturing. The International Journal of Advanced Manufacturing Technology 30:7-8, pages 727-737.
Crossref
Tsung-Che Chiang, An-Chih Huang & Li-Chen Fu. (2006) Modeling, scheduling, and performance evaluation for wafer fabrication: a queueing colored Petri-net and GA-based approach. IEEE Transactions on Automation Science and Engineering 3:3, pages 330-338.
Crossref
M. Mathirajan & A.I. Sivakumar. (2006) A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor. The International Journal of Advanced Manufacturing Technology 29:9-10, pages 990-1001.
Crossref
A.A. Upasani, R. Uzsoy & K. Sourirajan. (2006) A Problem Reduction Approach for Scheduling Semiconductor Wafer Fabrication Facilities. IEEE Transactions on Semiconductor Manufacturing 19:2, pages 216-225.
Crossref
E.C. Ozelkan & M. Cakanyildirim. (2006) Test Wafer Management for Semiconductor Manufacturing. IEEE Transactions on Semiconductor Manufacturing 19:2, pages 241-251.
Crossref
Jairo R. Montoya‐Torres. (2006) Manufacturing performance evaluation in wafer semiconductor factories. International Journal of Productivity and Performance Management 55:3/4, pages 300-310.
Crossref
Lars Mönch, Robert Unbehaun & You In Choung. (2005) Minimizing earliness–tardiness on a single burn-in oven with a common due date and maximum allowable tardiness constraint. OR Spectrum 28:2, pages 177-198.
Crossref
Zhai Wenbin, Chu Xuening, Zhang Jie, Ma Dengzhe, Jin Ye & Yan Juanqi. (2005) Research on AOCTPN-based modeling and simulation technology of semiconductor fabrication line. The International Journal of Advanced Manufacturing Technology 28:7-8, pages 814-821.
Crossref
J. Asmundsson, R.L. Rardin & R. Uzsoy. (2006) Tractable Nonlinear Production Planning Models for Semiconductor Wafer Fabrication Facilities. IEEE Transactions on Semiconductor Manufacturing 19:1, pages 95-111.
Crossref
Mickaël Bureau, Stéphane Dauzère-Pérès & Yazid Mati. (2006) SCHEDULING CHALLENGES AND APPROACHES IN SEMICONDUCTOR MANUFACTURING. IFAC Proceedings Volumes 39:3, pages 739-744.
Crossref
Shu-Hsing Chung, Chun-Ying Huang & Amy Hsin-I Lee. 2006. Computational Science and Its Applications - ICCSA 2006. Computational Science and Its Applications - ICCSA 2006 610 620 .
Francis E. H. Tay, Wang Lixin & Loo Hay Lee. 2006. MEMS/NEMS. MEMS/NEMS 922 992 .
Huiran Liu, Zhibin Jiang & Richard Y.K. Fung. (2004) Modeling of large-scale complex re-entrant manufacturing systems by extended object-oriented Petri nets. The International Journal of Advanced Manufacturing Technology 27:1-2, pages 190-204.
Crossref
Zhi-Cong Zhang, Mike Tao Zhang, Sophia Niu & Li Zheng. (2005) Production planning with joint resources usage in semiconductor test manufacturing. Production planning with joint resources usage in semiconductor test manufacturing.
J.A. Ramirez-Hernandez & E. Fernandez. (2005) A Case Study in Scheduling Reentrant Manufacturing Lines: Optimal and Simulation-Based Approaches. A Case Study in Scheduling Reentrant Manufacturing Lines: Optimal and Simulation-Based Approaches.
Nirmal Govind & Bala Iyer. (2005) The case for near real-time production scheduling in a highly automated semiconductor manufacturing environment. The case for near real-time production scheduling in a highly automated semiconductor manufacturing environment.
Pyung-Hoi Koo, Jaejin Jang & Jungdae Suh. (2005) Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first. International Journal of Flexible Manufacturing Systems 17:1, pages 23-38.
Crossref
Mark Ebben, Durk-Jouke van der Zee & Matthieu van der Heijden. (2004) Dynamic one-way traffic control in automated transportation systems. Transportation Research Part B: Methodological 38:5, pages 441-458.
Crossref
D.Y. Sha & Sheng‐Yuan Hsu. (2004) The effects of rework on the shopfloor control in wafer fabrication. Journal of Manufacturing Technology Management 15:2, pages 184-198.
Crossref
Jonah C Tyan, Timon C Du, James C Chen & Ir.-Hui Chang. (2004) Multiple response optimization in a fully automated FAB: an integrated tool and vehicle dispatching strategy∗. Computers & Industrial Engineering 46:1, pages 121-139.
Crossref
C. Kwak & Y. Yih. (2004) Data-Mining Approach to Production Control in the Computer-Integrated Testing Cell. IEEE Transactions on Robotics and Automation 20:1, pages 107-116.
Crossref

Displaying 200 of 266 citing articles. Use the download link below to view the full list of citing articles.

Download full citations list

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.