953
Views
749
CrossRef citations to date
0
Altmetric
Original Articles

A state-of-the-art survey of dispatching rules for manufacturing job shop operations

, &
Pages 27-45 | Received 24 Feb 1981, Published online: 06 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (147)

Yannik Zeiträg, José Rui Figueira & Gonçalo Figueira. (2024) A cooperative coevolutionary hyper-heuristic approach to solve lot-sizing and job shop scheduling problems using genetic programming. International Journal of Production Research 0:0, pages 1-28.
Read now
Nuno O. Fernandes, Matthias Thürer & Mark Stevenson. (2023) On the integration of card-allocation and dispatching decisions in POLCA systems: an assessment by simulation. Production Planning & Control 34:13, pages 1225-1232.
Read now
Doraid Dalalah, Udechukwu Ojiako, Khaled A. Alkhaledi & Alasdair Marshall. (2023) A support vector machine model for due date assignment in manufacturing operations. Journal of Industrial and Production Engineering 40:1, pages 68-85.
Read now
Jon M. Stauffer, Aly Megahed & Chelliah Sriskandarajah. (2021) Elasticity management for capacity planning in software as a service cloud computing. IISE Transactions 53:4, pages 407-424.
Read now
Matthias Thürer, Nuno O. Fernandes, Mark Stevenson, Ting Qu & George Q. Huang. (2021) Self-Organizing Material Flow Control using Smart Products: An Assessment by Simulation. Journal of Industrial and Production Engineering 38:2, pages 148-156.
Read now
Amar Oukil & Ahmed El-Bouri. (2021) Ranking dispatching rules in multi-objective dynamic flow shop scheduling: a multi-faceted perspective. International Journal of Production Research 59:2, pages 388-411.
Read now
Timothy Sprock, Conrad Bock & Leon F. McGinnis. (2019) Survey and classification of operational control problems in discrete event logistics systems (DELS). International Journal of Production Research 57:15-16, pages 5215-5238.
Read now
Jersone Tasso Moreira Silva, Jose Humberto Ablanedo-Rosas & Dennys Eduardo Rossetto. (2019) A longitudinal literature network review of contributions made to the academy over the past 55 years of the IJPR. International Journal of Production Research 57:15-16, pages 4627-4653.
Read now
Yongkui Liu, Lihui Wang, Xi Vincent Wang, Xun Xu & Lin Zhang. (2019) Scheduling in cloud manufacturing: state-of-the-art and research challenges. International Journal of Production Research 57:15-16, pages 4854-4879.
Read now
Gurkan Ozturk, Ozan Bahadir & Aydin Teymourifar. (2019) Extracting priority rules for dynamic multi-objective flexible job shop scheduling problems using gene expression programming. International Journal of Production Research 57:10, pages 3121-3137.
Read now
Matthias Thürer & Mark Stevenson. (2018) On the beat of the drum: improving the flow shop performance of the Drum–Buffer–Rope scheduling mechanism. International Journal of Production Research 56:9, pages 3294-3305.
Read now
Agostino Villa & Teresa Taurino. (2018) Event-driven production scheduling in SME. Production Planning & Control 29:4, pages 271-279.
Read now
Lin Lin & Mitsuo Gen. (2018) Hybrid evolutionary optimisation with learning for production scheduling: state-of-the-art survey on algorithms and applications. International Journal of Production Research 56:1-2, pages 193-223.
Read now
Durk-Jouke van der Zee. (2017) Coordinating batching decisions in manufacturing networks. International Journal of Production Research 55:18, pages 5405-5422.
Read now
Kuo-Ching Ying, Shih-Wei Lin & Chung-Cheng Lu. (2017) Effective dynamic dispatching rule and constructive heuristic for solving single-machine scheduling problems with a common due window. International Journal of Production Research 55:6, pages 1707-1719.
Read now
Alireza Javahernia & Funlade Sunmola. (2017) A simulation approach to innovation deployment readiness assessment in manufacturing. Production & Manufacturing Research 5:1, pages 81-89.
Read now
Jens Heger, Jürgen Branke, Torsten Hildebrandt & Bernd Scholz-Reiter. (2016) Dynamic adjustment of dispatching rule parameters in flow shops with sequence-dependent set-up times. International Journal of Production Research 54:22, pages 6812-6824.
Read now
Susanne Schukraft, Sebastian Grundstein, Bernd Scholz-Reiter & Michael Freitag. (2016) Evaluation approach for the identification of promising methods to couple central planning and autonomous control. International Journal of Computer Integrated Manufacturing 29:4, pages 438-461.
Read now
Victor Cransberg, Martin Land, Christian Hicks & Mark Stevenson. (2016) Handling the complexities of real-life job shops when implementing workload control: a decision framework and case study. International Journal of Production Research 54:4, pages 1094-1109.
Read now
Durk-Jouke van der Zee. (2015) Family-based dispatching with parallel machines. International Journal of Production Research 53:19, pages 5837-5856.
Read now
Rodrigo Romero-Silva, Javier Santos & Margarita Hurtado. (2015) A framework for studying practical production scheduling. Production Planning & Control 26:6, pages 438-450.
Read now
Xiaoming Wang, Qingxin Chen, Ning Mao, Xindu Chen & Zhantao Li. (2015) Proactive approach for stochastic RCMPSP based on multi-priority rule combinations. International Journal of Production Research 53:4, pages 1098-1110.
Read now
Cheng-Liang Yang & Cheng-Chieh Hsieh. (2014) A production scheduling simulation model for improving production efficiency. Cogent Engineering 1:1.
Read now
Hamidreza Eskandari & Amirhamed Hosseinzadeh. (2014) A variable neighbourhood search for hybrid flow-shop scheduling problem with rework and set-up times. Journal of the Operational Research Society 65:8, pages 1221-1231.
Read now
Martin Land, Mark Stevenson & Matthias Thürer. (2014) Integrating load-based order release and priority dispatching. International Journal of Production Research 52:4, pages 1059-1073.
Read now
Gema Calleja & Rafael Pastor. (2014) A dispatching algorithm for flexible job-shop scheduling with transfer batches: an industrial application. Production Planning & Control 25:2, pages 93-109.
Read now
Hyoung-Ho Doh, Jae-Min Yu, Ji-Su Kim, Dong-Ho Lee & Sung-Ho Nam. (2013) A priority scheduling approach for flexible job shops with multiple process plans. International Journal of Production Research 51:12, pages 3748-3764.
Read now
Durk-Jouke van der Zee. (2013) Family based dispatching with batch availability. International Journal of Production Research 51:12, pages 3643-3653.
Read now
Liu Zhuo, David Chua Kim Huat & Keng Hwee Wee. (2012) Scheduling dynamic block assembly in shipbuilding through hybrid simulation and spatial optimisation. International Journal of Production Research 50:20, pages 5986-6004.
Read now
Christoph W. Pickardt & Jürgen Branke. (2012) Setup-oriented dispatching rules – a survey. International Journal of Production Research 50:20, pages 5823-5842.
Read now
Veronique Sels, Nele Gheysen & Mario Vanhoucke. (2012) A comparison of priority rules for the job shop scheduling problem under different flow time- and tardiness-related objective functions. International Journal of Production Research 50:15, pages 4255-4270.
Read now
Durk-Jouke van der Zee, Gerard J.C. Gaalman & Gert Nomden. (2011) Family based dispatching in manufacturing networks. International Journal of Production Research 49:23, pages 7059-7084.
Read now
Ci Chen, Li-feng Xi, Bing-hai Zhou & Shen-shen Zhou. (2011) A multiple-criteria real-time scheduling approach for multiple-load carriers subject to LIFO loading constraints. International Journal of Production Research 49:16, pages 4787-4806.
Read now
S.M. Kamrul Hasan, Ruhul Sarker & Daryl Essam. (2011) Genetic algorithm for job-shop scheduling with machine unavailability and breakdowns. International Journal of Production Research 49:16, pages 4999-5015.
Read now
Choonjong Kwak, Eunmi Park & Chang Ouk Kim. (2011) Situation dependent decision selector for production control in testing and rework cell. International Journal of Production Research 49:15, pages 4505-4516.
Read now
Ahmed El-Bouri & Subrahmanya Nairy. (2011) An investigation of cooperative dispatching for minimising mean flowtime in a finite-buffer-capacity dynamic flowshop. International Journal of Production Research 49:6, pages 1785-1800.
Read now
H.L. Lu, George Q. Huang & H.D. Yang. (2011) Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research 49:3, pages 647-669.
Read now
Subhash C. Sarin, Amrusha Varadarajan & Lixin Wang. (2011) A survey of dispatching rules for operational control in wafer fabrication. Production Planning & Control 22:1, pages 4-24.
Read now
Taho Yang & Jiunn Chenn Lu. (2010) A hybrid dynamic pre-emptive and competitive neural-network approach in solving the multi-objective dispatching problem for TFT-LCD manufacturing. International Journal of Production Research 48:16, pages 4807-4828.
Read now
Durk-Jouke van der Zee. (2010) Non-exhaustive family based dispatching heuristics–exploiting variances of processing and set-up times. International Journal of Production Research 48:13, pages 3783-3802.
Read now
Z C Zhu, K M Ng & H L Ong. (2010) A modified tabu search algorithm for cost-based job shop problem. Journal of the Operational Research Society 61:4, pages 611-619.
Read now
PedroL. Gonzalez-R, Jose M. Framinan & Rafael Ruiz-Usano. (2010) A multi-objective comparison of dispatching rules in a drum–buffer–rope production control system. International Journal of Computer Integrated Manufacturing 23:2, pages 155-167.
Read now
Choonjong Kwak. (2010) Architecture of a dynamic production controller in CIM enterprise environments. International Journal of Production Research 48:1, pages 167-182.
Read now
Özlem Uzun Araz & Latif Salum. (2010) A multi-criteria adaptive control scheme based on neural networks and fuzzy inference for DRC manufacturing systems. International Journal of Production Research 48:1, pages 251-270.
Read now
M. Ebadian, M. Rabbani, S.A. Torabi & F. Jolai. (2009) Hierarchical production planning and scheduling in make-to-order environments: reaching short and reliable delivery dates. International Journal of Production Research 47:20, pages 5761-5789.
Read now
R. Zhou, A.Y.C. Nee & H.P. Lee. (2009) Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems. International Journal of Production Research 47:11, pages 2903-2920.
Read now
V. Vinod & R. Sridharan. (2009) Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times. International Journal of Production Research 47:6, pages 1425-1447.
Read now
Dominique Perdaen, Dieter Armbruster, Karl Kempf & Erjen Lefeber. (2008) Controlling a re-entrant manufacturing line via the push–pull point. International Journal of Production Research 46:16, pages 4521-4536.
Read now
N. Bahaji & M. E. Kuhl. (2008) A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication. International Journal of Production Research 46:14, pages 3801-3824.
Read now
Maria Caridi, Roberto Cigolini, Manfredi Urciuoli & Angelo N. Villa. (2008) Reducing lead time in the banking industry: an experimental approach to the loan granting process. Production Planning & Control 19:3, pages 198-211.
Read now
Christopher D. Geiger & Reha Uzsoy. (2008) Learning effective dispatching rules for batch processor scheduling. International Journal of Production Research 46:6, pages 1431-1454.
Read now
S. Venkataramanaiah. (2008) Scheduling in cellular manufacturing systems: an heuristic approach. International Journal of Production Research 46:2, pages 429-449.
Read now
G. Nomden, D.-J. Van Der Zee & J. Slomp. (2008) Family-based dispatching: anticipating future jobs. International Journal of Production Research 46:1, pages 73-97.
Read now
D. Gradišar & G. Mušič. (2007) Production-process modelling based on production-management data: a Petri-net approach. International Journal of Computer Integrated Manufacturing 20:8, pages 794-810.
Read now
D. Gradišar & G. Mušič. (2007) Automated Petri-net modelling based on production management data. Mathematical and Computer Modelling of Dynamical Systems 13:3, pages 267-290.
Read now
Dong-Ping Song, Christian Hicks & Christopher F. Earl. (2006) An ordinal optimization based evolution strategy to schedule complex make-to-order products. International Journal of Production Research 44:22, pages 4877-4895.
Read now
T.-C. Hsu. (2006) New expression of scheduling performance measures. International Journal of Production Research 44:15, pages 3147-3158.
Read now
B.K. Choi & N.K. You. (2006) Dispatching rules for dynamic scheduling of one-of-a-kind production. International Journal of Computer Integrated Manufacturing 19:4, pages 383-392.
Read now
S. Moses, H. Grant, L. Gruenwald & S. Pulat. (2004) Real-time due-date promising by build-to-order environments. International Journal of Production Research 42:20, pages 4353-4375.
Read now
Y.L. SUN & Y. YIH. (2004) A LEARNING-BASED REAL-TIME CONTROLLER FOR DYNAMIC MANUFACTURING CELLS. Journal of the Chinese Institute of Industrial Engineers 21:3, pages 251-262.
Read now
S. Thiagarajan & C. Rajendran. (2003) Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs . International Journal of Production Research 41:18, pages 4453-4486.
Read now
John W Fowler, Gary L Hogg & Scott J Mason. (2002) Workload control in the semiconductor industry. Production Planning & Control 13:7, pages 568-578.
Read now
Yi-Feng Hung & Ching-Bin Chang. (2002) DISPATCHING RULES USING FLOW TIME PREDICTIONS FOR SEMICONDUCTOR WAFER FABRICATIONS. Journal of the Chinese Institute of Industrial Engineers 19:1, pages 67-75.
Read now
JonahC. Tyan, JamesC. Chen & Fu-Kwun Wang. (2002) Development of a state-dependent dispatch rule using theory of constraints in near-real-world wafer fabrication. Production Planning & Control 13:3, pages 253-261.
Read now
Adil Baykasoglu. (2002) Linguistic-based meta-heuristic optimization model for flexible job shop scheduling. International Journal of Production Research 40:17, pages 4523-4543.
Read now
Oliver Holthaus & Chandrasekharan Rajendran. (2002) A study on the performance of scheduling rules in buffer-constrained dynamic flowshops. International Journal of Production Research 40:13, pages 3041-3052.
Read now
CharlesT. Mosier & Farzad Mahmoodi. (2002) Work sequencing in a manufacturing cell with limited labour constraints. International Journal of Production Research 40:12, pages 2883-2899.
Read now
Dong Hyun Baek & Wan Chul Yoon. (2002) Co-evolutionary genetic algorithm for multi-machine scheduling: Coping with high performance variability. International Journal of Production Research 40:1, pages 239-254.
Read now
ALEXANDER WEINTRAUB, DENIS CORMIER, THOM HODGSON, RUSSELL KING, JAMES WILSON & ANDREW ZOZOM. (1999) Scheduling with alternatives: a link between process planning and scheduling. IIE Transactions 31:11, pages 1093-1102.
Read now
Ching-En Lee & Chaw-Wen Chen. (1999) 在緊急訂單與延遲成本考量下零工型排程問題派工法之硏究. Journal of the Chinese Institute of Industrial Engineers 16:1, pages 129-146.
Read now
SAMIR BARMAN. (1998) The impact of priority rule combinations on lateness and tardiness. IIE Transactions 30:5, pages 495-504.
Read now
THOMASK. KEYSER & ROBERTP. DAVIS. (1998) Distributed computing approaches toward manufacturing scheduling problems. IIE Transactions 30:4, pages 379-390.
Read now
Horng-Huei Wu & Rong-Kwei Li. (1997) 生產排程之重排程決策問題的文献探討舆分析. Journal of the Chinese Institute of Industrial Engineers 14:2, pages 147-158.
Read now
A. Saad, K. Kawamura & G. Biswas. (1997) Performance Evaluation of Contract Net-Based Heterarchical Scheduling for Flexible Manufacturing Systems. Intelligent Automation & Soft Computing 3:3, pages 229-247.
Read now
L. D. FREDENDALL, S. A. MELNYK & G. RAGATZ. (1996) Information and scheduling in a dual resource constrained job shop. International Journal of Production Research 34:10, pages 2783-2802.
Read now
V. B. GARGEYA & R. H. DEANE. (1996) Scheduling research in multiple resource constrained job shops: a review and critique. International Journal of Production Research 34:8, pages 2077-2097.
Read now
HORNG-HUEI WU & RONG-KWEI LI. (1996) A methodology for schedule compression. Production Planning & Control 7:4, pages 407-417.
Read now
KEVIN CASKEY & RICHARD LEE STORCH. (1996) Heterogeneous dispatching rules in job and flow shops. Production Planning & Control 7:4, pages 351-361.
Read now
J. -C. BILLAUT & F. ROUBELLAT. (1996) A new method for workshop real time scheduling. International Journal of Production Research 34:6, pages 1555-1579.
Read now
DONG-HO LEE & YEONG-DAE KIM. (1996) Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop. International Journal of Production Research 34:5, pages 1347-1360.
Read now
G. V. FRAZIER. (1996) An evaluation of group scheduling heuristics in a flow-line manufacturing cell. International Journal of Production Research 34:4, pages 959-976.
Read now
F. MAHMOODI, C. T. MOSIER & R. E GUERIN. (1996) The effect of combining simple priority heuristics in flow-dominant shops. International Journal of Production Research 34:3, pages 819-839.
Read now
M. PERONA & A. PORTIOLI. (1996) An enhanced loading model for the probabilistic workload control under workload imbalance. Production Planning & Control 7:1, pages 68-78.
Read now
C. J. MALMBORG. (1996) Machine scheduling models in environmentally focused chemical manufacturing. International Journal of Production Research 34:1, pages 209-225.
Read now
C. CHIU & Y. YIH. (1995) A learning-based methodology for dynamic scheduling in distributed manufacturing systems. International Journal of Production Research 33:11, pages 3217-3232.
Read now
LawrenceW. Robinson & KevinB. Hendricks. (1995) Using state-dependent processing rates to emulate SPT queue discipline in an FCPS queueing network. IIE Transactions 27:4, pages 530-541.
Read now
AVINASHM. WAIKAR, BHABAR. SARKER & ANILM. LAL. (1995) A comparative study of some priority dispatching rules under different shop loads. Production Planning & Control 6:4, pages 301-310.
Read now
Nashwan N. Dawood. (1995) An integrated knowledge-based/simulation approach to production planning: an application to the pre-cast industry. Construction Management and Economics 13:1, pages 53-64.
Read now
S. B. BAHOUTH & B. L. FOOTE. (1994) Managing a two-bottleneck job shop with a two-machine flow shop algorithm. International Journal of Production Research 32:10, pages 2463-2477.
Read now
REHA UZSOY, CHUNG-YEE LEE & LOUISA. MARTIN-VEGA. (1994) A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART II: SHOP-FLOOR CONTROL. IIE Transactions 26:5, pages 44-55.
Read now
S. K. SIM, K. T. YEO & W. H. LEE. (1994) An expert neural network system for dynamic job shop scheduling. International Journal of Production Research 32:8, pages 1759-1773.
Read now
M. GARETTI, C. LANZA & A. POZZETTI. (1994) An algorithm for the weekly production planning of flexible assembly systems. International Journal of Computer Integrated Manufacturing 7:4, pages 249-259.
Read now
S. A. MELNYK, K. C. TAN, D. R. DENZLER & L. FREDENDALL. (1994) Evaluating variance control, order review/release and dispatching: a regression analysis. International Journal of Production Research 32:5, pages 1045-1061.
Read now
Y.-D. KIM & C. A. YANOJ. (1994) A due date-based approach to part type selection in flexible manufacturing systems. International Journal of Production Research 32:5, pages 1027-1043.
Read now
D. SUN & L. LIN. (1994) A dynamic job shop scheduling framework: a backward approach. International Journal of Production Research 32:4, pages 967-985.
Read now
K. K. YANG & C. C. SUM. (1994) A comparison of job shop dispatching rules using a total cost criterion. International Journal of Production Research 32:4, pages 807-820.
Read now
YIH-LONG CHANG. (1994) Time window capacity analysis for synchronous production. Production Planning & Control 5:1, pages 66-81.
Read now
PIERRE LEFRANCOIS & BENOIT MONTREUIL. (1994) AN OBJECT-ORIENTED KNOWLEDGE REPRESENTATION FOR INTELLIGENT CONTROL OF MANUFACTURING WORKSTATIONS. IIE Transactions 26:1, pages 11-26.
Read now
J. T. FELAN$suffix/text()$suffix/text(), T. D. FRY & P. R. PHILIPOOM. (1993) Labour flexibility and staffing levels in a dual-resource constrained job shop. International Journal of Production Research 31:10, pages 2487-2506.
Read now
S. C. GARDINER & J. H. BLACKSTONE$suffix/text()$suffix/text(). (1993) Impact of lot-sizing on the financial performance of dispatching techniques in an MRP-planned fabrication and assembly environment. International Journal of Production Research 31:7, pages 1595-1610.
Read now
W. C. BENTON. (1993) Time- and cost-based priorities for job shop scheduling. International Journal of Production Research 31:7, pages 1509-1519.
Read now
R. A. RUBEN, C. T. MOSIER & F. MAHMOODI. (1993) A comprehensive analysis of group scheduling heuristics in a job shop cell. International Journal of Production Research 31:6, pages 1343-1369.
Read now
S. R. DOCTOR, T. M. CAVALIER & P. J. EGBELU. (1993) Scheduling for machining and assembly in a job-shop environment. International Journal of Production Research 31:6, pages 1275-1297.
Read now
H. CHO & R. A. WYSK. (1993) A robust adaptive scheduler for an intelligent workstation controller. International Journal of Production Research 31:4, pages 771-789.
Read now
Y-D. KIM. (1993) A study on surrogate objectives for loading a certain type of flexible manufacturing systems. International Journal of Production Research 31:2, pages 381-392.
Read now
Henri Pierreval. (1993) Neural Network to Select Dynamic Scheduling Heuristics. Journal of Decision Systems 2:2, pages 173-190.
Read now
G. CHRYSSOLOURIS, K. DICKE & M. LEE. (1992) On the resources allocation problem. International Journal of Production Research 30:12, pages 2773-2795.
Read now
P. R. PHILIPOOM & T. D. FRY. (1992) Capacity-based order review/release strategies to improve manufacturing performance. International Journal of Production Research 30:11, pages 2559-2572.
Read now
ROBERTM. O'KEEFE & THEYSAN KASIRAJAN. (1992) Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system. International Journal of Production Research 30:8, pages 1753-1772.
Read now
IHSAN SABUNCUOGLU & DONL. HOMMERTZHEIM. (1992) Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion. International Journal of Production Research 30:7, pages 1617-1635.
Read now
LAURAK. CHURCH & REHA UZSOY. (1992) Analysis of periodic and event-driven rescheduling policies in dynamic shops. International Journal of Computer Integrated Manufacturing 5:3, pages 153-163.
Read now
SHINICHI NAKASUKA & TAKETOSHI YOSHIDA. (1992) Dynamic scheduling system utilizing machine learning as a knowledge acquisition tool. International Journal of Production Research 30:2, pages 411-431.
Read now
Günter Schmidt. (1992) A Decision Support System for Production Scheduling. Journal of Decision Systems 1:2-3, pages 243-260.
Read now
FARZAD MAHMOODI & KEVINJ. DOOLEY. (1992) Group scheduling and order releasing: review and foundations for research. Production Planning & Control 3:1, pages 70-80.
Read now
NOBUAKI ISHII & JOSEPHJ. TALAVAGE. (1991) A transient-based real-time scheduling algorithm in FMS. International Journal of Production Research 29:12, pages 2501-2520.
Read now
J. CHANDRA & J. TALAVAGE. (1991) Intelligent dispatching for flexible manufacturing. International Journal of Production Research 29:11, pages 2259-2278.
Read now
ROBERTM. O'KEEFE & JORGE HADDOCK. (1991) Data-driven generic simulators for flexible manufacturing systems. International Journal of Production Research 29:9, pages 1795-1810.
Read now
PATRICKJ. STARR. (1991) Integration of simulation and analytical submodels for supporting manufacturing decisions. International Journal of Production Research 29:9, pages 1733-1746.
Read now
PATRICKR. PHILIPOOM, ROBERTAS. RUSSELL & TIMOTHYD. FRY. (1991) A preliminary investigation of multi-attribute based sequencing rules for assembly shops. International Journal of Production Research 29:4, pages 739-753.
Read now
BEN VAN DER PLUYM. (1990) Knowledge-based decision-making for job shop scheduling. International Journal of Computer Integrated Manufacturing 3:6, pages 354-363.
Read now
M. GARETTI, A. POZZETTI & A. BAREGGI. (1990) On-line loading and dispatching in flexible manufacturing systems. International Journal of Production Research 28:7, pages 1271-1292.
Read now
CATHAL COPAS & JIM BROWNE. (1990) A rules-based scheduling system for flow type assembly. International Journal of Production Research 28:5, pages 981-1005.
Read now
YEONG-DAE KIM. (1990) A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeings. International Journal of Production Research 28:5, pages 953-962.
Read now
M. MONTAZERI & L. N. VAN WASSENHOVE. (1990) Analysis of scheduling rules for an FMS. International Journal of Production Research 28:4, pages 785-802.
Read now
YASHP. GUPTA, MAHESHC. GUPTA & C. R. BECTOR. (1989) A review of scheduling rules in flexible manufacturing systems. International Journal of Computer Integrated Manufacturing 2:6, pages 356-377.
Read now
PAULM. BOBROWSKI. (1989) Implementing a loading heuristic in a discrete release job shop. International Journal of Production Research 27:11, pages 1935-1948.
Read now
MARK TRELEVEN. (1989) A Review of the Dual Resource Constrained System Research. IIE Transactions 21:3, pages 279-287.
Read now
TIMOTHYD. FRY, MICHAELD. OLIFF, ELLIOTD. MINOR & G. KEONG LEONG. (1989) The effects of product structure and sequencing rule on assembly shop performance. International Journal of Production Research 27:4, pages 671-686.
Read now
GARYD. SCUDDER & THOMASR. HOFFMANN. (1989) The use of value-based priorities when early shipments are forbidden†. International Journal of Production Research 27:2, pages 353-369.
Read now
CARLR. SCHULTZ. (1989) An expediting heuristic for the shortest processing time dispatching rule. International Journal of Production Research 27:1, pages 31-41.
Read now
N. S. ADSHEAD & D. H. R. PRICE. (1988) Adaptive scheduling: the use of dynamic due dates to accommodate demand variance in a make-for-stock shop. International Journal of Production Research 26:7, pages 1241-1258.
Read now
TIMOTHYD. FRY, PATRICKR. PHILIPOOM & ROBERTE. MARKLAND. (1988) Dispatching in a multistage job shop where machine capacities are unbalanced. International Journal of Production Research 26:7, pages 1193-1223.
Read now
D. McAREAVEY, J. HOEY & R. LEONARD. (1988) Designing the closed loop elements of a. material requirements planning system in a low volume, make-to-order company (with case study). International Journal of Production Research 26:7, pages 1141-1159.
Read now
E. BENSANA, G. BEL & D. DUBOIS. (1988) OPAL: A multi-knowledge-based system for industrial job-shop scheduling†. International Journal of Production Research 26:5, pages 795-819.
Read now
C. R. BECTOR, Y. P. GUPTA & M. C. GUPTA. (1988) Determination of an optimal common due date and optimal sequence in a single machine job shop. International Journal of Production Research 26:4, pages 613-628.
Read now
R. S. RUSSELL†E. M. DAR-EL‡B. W. TAYLOR$suffix/text()$suffix/text(). (1987) A comparative analysis of the COVERT job sequencing rule using various shop performance measures. International Journal of Production Research 25:10, pages 1523-1540.
Read now
MICHAELJ. SHAW. (1987) A distributed scheduling method for computer integrated manufacturing: the use of local area networks in cellular systems. International Journal of Production Research 25:9, pages 1285-1303.
Read now
GARYD. SCUDDER. (1986) Scheduling and labour-assignment policies for a dual-constrained repair shop† . International Journal of Production Research 24:3, pages 623-634.
Read now
GARYD. SCUDDKR & THOMASR. HOFFMANN. (1985) Composite cost-based rules for priority scheduling in a randomly routed job shop. International Journal of Production Research 23:6, pages 1185-1195.
Read now
RobertaS. Russell & BernardW. Taylor. (1985) An Evaluation of Scheduling Policies in a Dual Resource Constrained Assembly Shop. IIE Transactions 17:3, pages 219-232.
Read now
T. C. E. CHENG. (1985) Analytical determination of optimal TWK due-dates in a job shop. International Journal of Systems Science 16:6, pages 777-787.
Read now
KRIPA SHANKER & YA-JUEI JEFFREY TZEN. (1985) A loading and dispatching problem in a random flexible manufacturing system. International Journal of Production Research 23:3, pages 579-595.
Read now
THOMASR. HOFFMANN & GARYD. SCUDDER. (1983) Priority scheduling with cost considerations. International Journal of Production Research 21:6, pages 881-889.
Read now
Jinghua Si, Xinyu Li, Liang Gao & Peigen Li. An efficient and adaptive design of reinforcement learning environment to solve job shop scheduling problem with soft actor-critic algorithm. International Journal of Production Research 0:0, pages 1-16.
Read now

Articles from other publishers (602)

Zhenyu Liu, Haoyang Mao, Guodong Sa, Hui Liu & Jianrong Tan. (2024) Dynamic job-shop scheduling using graph reinforcement learning with auxiliary strategy. Journal of Manufacturing Systems 73, pages 1-18.
Crossref
Fangfang Zhang, Yi Mei, Su Nguyen & Mengjie Zhang. (2024) Survey on Genetic Programming and Machine Learning Techniques for Heuristic Design in Job Shop Scheduling. IEEE Transactions on Evolutionary Computation 28:1, pages 147-167.
Crossref
Frederik Ferid Ostermeier & Jochen Deuse. (2023) A review and classification of scheduling objectives in unpaced flow shops for discrete manufacturing. Journal of Scheduling 27:1, pages 29-49.
Crossref
Vivian Wen Hui Wong, Sang Hun Kim, Junyoung Park, Jinkyoo Park & Kincho H. Law. (2024) Generating Dispatching Rules for the Interrupting Swap-Allowed Blocking Job Shop Problem Using Graph Neural Network and Reinforcement Learning. Journal of Manufacturing Science and Engineering 146:1.
Crossref
Eiji Morinaga, Xuetian Tang, Koji Iwamura & Naoki Hirabayashi. (2024) Improvement of job shop scheduling method based on mathematical optimization and machine learning. Procedia Computer Science 232, pages 871-879.
Crossref
Kap-Hwan Kim. 2024. Planning and Operation of Container Terminals. Planning and Operation of Container Terminals 315 344 .
F. Ganji & S. Gholami. (2023) Minimizing fuel emission by optimizing ship scheduling considering priorities and release times. International Journal of Environmental Science and Technology 21:1, pages 135-152.
Crossref
Nuno O. Fernandes, Nelson Guedes, Matthias Thürer, Luis P. Ferreira, P. Avila & Silvio Carmo-Silva. 2024. Information Systems and Technologies. Information Systems and Technologies 417 424 .
Nuno O. Fernandes, Nelson Guedes, Matthias Thürer, Luis P. Ferreira & Paulo Ávila. 2024. Flexible Automation and Intelligent Manufacturing: Establishing Bridges for More Sustainable Manufacturing Systems. Flexible Automation and Intelligent Manufacturing: Establishing Bridges for More Sustainable Manufacturing Systems 95 102 .
Jianjun Liu, Martin J. Land, Jos A. C. Bokhorst & Qingxin Chen. (2022) Improving coordination in assembly job shops: redesigning order release and dispatching. Flexible Services and Manufacturing Journal 35:3, pages 669-697.
Crossref
Ziqing Wang & Wenzhu Liao. (2023) Smart scheduling of dynamic job shop based on discrete event simulation and deep reinforcement learning. Journal of Intelligent Manufacturing.
Crossref
Chengpeng Hu, Ziming Wang, Jialin Liu, Junyi Wen, Bifei Mao & Xin Yao. (2023) Constrained Reinforcement Learning for Dynamic Material Handling. Constrained Reinforcement Learning for Dynamic Material Handling.
Zhaojun Qin, Dazzle Johnson & Yuqian Lu. (2023) Dynamic production scheduling towards self-organizing mass personalization: A multi-agent dueling deep reinforcement learning approach. Journal of Manufacturing Systems 68, pages 242-257.
Crossref
Yong Gui, Dunbing Tang, Haihua Zhu, Yi Zhang & Zequn Zhang. (2023) Dynamic scheduling for flexible job shop using a deep reinforcement learning approach. Computers & Industrial Engineering 180, pages 109255.
Crossref
Yannik Zeiträg & José Rui Figueira. (2023) Automatically evolving preference-based dispatching rules for multi-objective job shop scheduling. Journal of Scheduling 26:3, pages 289-314.
Crossref
Khalil Tliba, Thierno M. L. Diallo, Olivia Penas, Romdhane Ben Khalifa, Noureddine Ben Yahia & Jean-Yves Choley. (2022) Digital twin-driven dynamic scheduling of a hybrid flow shop. Journal of Intelligent Manufacturing 34:5, pages 2281-2306.
Crossref
Shiladitya Chakravorty & Nagendra N. Nagarur. (2023) Simulated Annealing Based Artificial Neural Network For Real Time Dispatching. Simulated Annealing Based Artificial Neural Network For Real Time Dispatching.
T.A. Arno Kasper, Martin J. Land & Ruud H. Teunter. (2023) Non-hierarchical work-in-progress control in manufacturing. International Journal of Production Economics 257, pages 108768.
Crossref
Luis C. Rabelo & Yuehwern Yih. (2023) DEVELOPMENT OF A TWO-LEVEL SCHEDULING PROTOTYPE USING ARTIFICIAL INTELLIGENCE TECHNIQUES FOR A "SYSTEMS" COMPANY. DEVELOPMENT OF A TWO-LEVEL SCHEDULING PROTOTYPE USING ARTIFICIAL INTELLIGENCE TECHNIQUES FOR A "SYSTEMS" COMPANY.
Eiji MORINAGA, Kenta TERAMOTOHidefumi WAKAMATSU. (2023) Method of job shop scheduling considering reworking and reprocessing based on proactive approach. Journal of Advanced Mechanical Design, Systems, and Manufacturing 17:1, pages JAMDSM0013-JAMDSM0013.
Crossref
Gyunam Park & Minseok Song. (2023) Optimizing Resource Allocation Based on Predictive Process Monitoring. IEEE Access 11, pages 38309-38323.
Crossref
Eiji Morinaga, Xuetian Tang, Koji Iwamura & Naoki Hirabayashi. (2023) An improved method of job shop scheduling using machine learning and mathematical optimization. Procedia Computer Science 217, pages 1479-1486.
Crossref
T.A. Arno Kasper, Martin J. Land & Ruud H. Teunter. (2023) Towards System State Dispatching in High‐Variety Manufacturing. Omega 114, pages 102726.
Crossref
Eiji Morinaga, Kenta Teramoto & Hidefumi Wakamatsu. 2023. Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures. Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures 576 590 .
Michael Groth, Alexander Dippel & Matthias Schumann. 2023. Design Science Research for a New Society: Society 5.0. Design Science Research for a New Society: Society 5.0 18 32 .
María Ángeles Rodríguez, Pedro Gomez-Gasquet, Llanos Cuenca & M. M. E. Alemany. 2023. Industry 4.0: The Power of Data. Industry 4.0: The Power of Data 137 144 .
Jonas K. Falkner, Daniela Thyssens, Ahmad Bdeir & Lars Schmidt-Thieme. 2023. Machine Learning and Knowledge Discovery in Databases. Machine Learning and Knowledge Discovery in Databases 361 376 .
Yannik Zeiträg, José Rui Figueira, Nuno Horta & Rui Neves. (2022) Surrogate-assisted automatic evolving of dispatching rules for multi-objective dynamic job shop scheduling using genetic programming. Expert Systems with Applications 209, pages 118194.
Crossref
Shu Luo, Linxuan Zhang & Yushun Fan. (2022) Real-Time Scheduling for Dynamic Partial-No-Wait Multiobjective Flexible Job Shop by Deep Reinforcement Learning. IEEE Transactions on Automation Science and Engineering 19:4, pages 3020-3038.
Crossref
Cristiane Ferreira, Gonçalo Figueira & Pedro Amorim. (2022) Effective and interpretable dispatching rules for dynamic job shops via guided empirical learning. Omega 111, pages 102643.
Crossref
Baby Sivanandan Girish, Habibullah & Jessamma Dileeplal. (2022) Minimizing the total weighted earliness and tardiness for a sequence of operations in job shops. RAIRO - Operations Research 56:4, pages 2621-2649.
Crossref
MOHAMMED M. S. EL-KHOLANY, MARTIN GEBSER & KONSTANTIN SCHEKOTIHIN. (2022) Problem Decomposition and Multi-shot ASP Solving for Job-shop Scheduling. Theory and Practice of Logic Programming 22:4, pages 623-639.
Crossref
Hegen Xiong, Shuangyuan Shi, Danni Ren & Jinjin Hu. (2022) A survey of job shop scheduling problem: The types and models. Computers & Operations Research 142, pages 105731.
Crossref
Shiladitya Chakravorty & Nagendra N. Nagarur. (2022) Analysis of Artificial Neural Network Based Algorithms For Real Time Dispatching. Analysis of Artificial Neural Network Based Algorithms For Real Time Dispatching.
Jingqi Chen, Guoxin Wang, Jinzhi Lu, Xiaochen Zheng & Dimitris Kiritsis. (2022) Model-based system engineering supporting production scheduling based on satisfiability modulo theory. Journal of Industrial Information Integration 27, pages 100329.
Crossref
Alper Türkyılmaz, Ozlem Senvar, İrem Ünal & Serol Bulkan. (2022) A hybrid genetic algorithm based on a two-level hypervolume contribution measure selection strategy for bi-objective flexible job shop problem. Computers & Operations Research 141, pages 105694.
Crossref
Maximilian Johannes Schlüter & Frederik Ferid Ostermeier. (2022) Dynamic line balancing in unpaced mixed-model assembly lines: A problem classification. CIRP Journal of Manufacturing Science and Technology 37, pages 134-142.
Crossref
Liping Zhang, Yifan Hu, Chuangjian Wang, Qiuhua Tang & Xinyu Li. (2022) Effective dispatching rules mining based on near-optimal schedules in intelligent job shop environment. Journal of Manufacturing Systems 63, pages 424-438.
Crossref
Gaetano Volpe, Agostino Marcello Mangini & Maria Pia Fanti. (2022) Job Shop Sequencing in Manufacturing Plants by Timed Coloured Petri Nets and Particle Swarm Optimization. IFAC-PapersOnLine 55:28, pages 350-355.
Crossref
Ragazzini Lorenzo, Negri Elisa & Macchi Marco. (2022) Local Digital Twin-based control of a cobot-assisted assembly cell based on Dispatching Rules. IFAC-PapersOnLine 55:2, pages 372-377.
Crossref
S. Ashwin, V. Shankaranarayanan, Damien lamy, S. P. Anbuudayasankar & M. Thenarasu. 2022. Intelligent Manufacturing and Energy Sustainability. Intelligent Manufacturing and Energy Sustainability 337 345 .
Hao Wang, Tao Peng, Alexandra Brintrup, Thorsten Wuest & Renzhong Tang. 2022. Advances in Production Management Systems. Smart Manufacturing and Logistics Systems: Turning Ideas into Action. Advances in Production Management Systems. Smart Manufacturing and Logistics Systems: Turning Ideas into Action 425 433 .
Sai Panda, Yi Mei & Mengjie Zhang. 2022. Evolutionary Computation in Combinatorial Optimization. Evolutionary Computation in Combinatorial Optimization 95 110 .
Mohammed M. S. El-Kholany, Konstantin Schekotihin & Martin Gebser. 2022. Practical Aspects of Declarative Languages. Practical Aspects of Declarative Languages 165 180 .
Sudipta Saha, Maurizio Tomasella, Giovanni Cattaneo, Andrea Matta & Silvia Padron. (2021) On Static vs Dynamic (Switching of) Operational Policies in Aircraft Turnaround Team Allocation and Management. On Static vs Dynamic (Switching of) Operational Policies in Aircraft Turnaround Team Allocation and Management.
Lijun He, Wenfeng Li, Raymond Chiong, Mehdi Abedi, Yulian Cao & Yu Zhang. (2021) Optimising the job-shop scheduling problem using a multi-objective Jaya algorithm. Applied Soft Computing 111, pages 107654.
Crossref
Di Li & Hao Tang. (2021) A semantic-level component-based scheduling method for customized manufacturing. Robotics and Computer-Integrated Manufacturing 71, pages 102144.
Crossref
Huali Fan, Hegen Xiong & Mark Goh. (2021) Genetic programming-based hyper-heuristic approach for solving dynamic job shop scheduling problem with extended technical precedence constraints. Computers & Operations Research 134, pages 105401.
Crossref
Liping Zhang, Yifan Hu, Qiuhua Tang, Jie Li & Zhixiong Li. (2021) Data-Driven Dispatching Rules Mining and Real-Time Decision-Making Methodology in Intelligent Manufacturing Shop Floor with Uncertainty. Sensors 21:14, pages 4836.
Crossref
David Garcia, Houda Tlahig, Belgacem Bettayeb & M'hammed Sahnoun. (2021) Evaluation of Dispatching Rules Performance for a DJSSP: Towards their Application in Industry 4.0. Evaluation of Dispatching Rules Performance for a DJSSP: Towards their Application in Industry 4.0.
Andreas Kuhnle, Jan-Philipp Kaiser, Felix Theiß, Nicole Stricker & Gisela Lanza. (2020) Designing an adaptive production control system using reinforcement learning. Journal of Intelligent Manufacturing 32:3, pages 855-876.
Crossref
Rashmi Singh & M. Mathirajan. (2021) A New Stage-Wise Control Release Policy for Semiconductor Wafer Fabrication Systems. IEEE Transactions on Semiconductor Manufacturing 34:1, pages 115-134.
Crossref
Xiang Tian & Xiyu Liu. (2021) Improved Hybrid Heuristic Algorithm Inspired by Tissue-Like Membrane System to Solve Job Shop Scheduling Problem. Processes 9:2, pages 219.
Crossref

Displaying 200 of 749 citing articles. Use the download link below to view the full list of citing articles.

Download full citations list

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.